Juhtumid / Kalkuleerimine ja hindamine
Kalkuleerimine ja hindamine

Esita kliendile DIN 276 kuluplaan

Ehita kuluplaan DIN 276 kulurühmadele, kodeeri iga positsioon selle Kostengruppe järgi, loe hälvet rühmade kaupa ning väljasta see kliendile struktuuris, mida tema audiitor ootab.

7 sammu13 minKulunõustamine / QSPeatöövõtjaArendaja / klient

Kuidas see töötab, samm-sammult

7 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Set the early cost frame

Kontseptuaalne hinnang

Open the conceptual estimate and put down the first cost frame: gross floor area, quality level and region give a cost per square metre, and the total comes back split across the elemental categories rather than as one number.

Miks: The client approves a figure long before there is a bill to price. Holding that early frame in the project is what lets the later, finer plan be read against something instead of arriving as a fresh number nobody recognises.

SisendGross floor areaQuality level and regionVäljundEarly cost frameElemental split
2

Code every position to a Kostengruppe

Mahutabel

Work down the bill and give each position its DIN 276 code in the classification column: 300 for the Baukonstruktionen, 400 for the Technische Anlagen, 500 for the Aussenanlagen, down to the three-digit group where the work really sits.

Ekraanipilt, samm 2: Code every position to a Kostengruppe (Mahutabel, Esita kliendile DIN 276 kuluplaan)
Mahutabel: Code every position to a Kostengruppe

Miks: The cost group is what turns a flat list of positions into a plan that can be read by group. A position left uncoded is money that shows up under no heading at all when the client asks what a group contains.

SisendPriced positionsDIN 276 cost groupsVäljundCoded positionsCost group on every line
3

Build the plan by cost group

5D kulumudel

Generate the cost spine from the bill. Each coded position lands on a control account for its cost group, so the plan appears as a tree of Kostengruppen with the totals rolled up from the positions underneath and every line still reachable.

Ekraanipilt, samm 3: Build the plan by cost group (5D kulumudel, Esita kliendile DIN 276 kuluplaan)
5D kulumudel: Build the plan by cost group

Miks: This is the elemental plan itself, and it is generated from the coded positions rather than typed next to them. That is what stops a group total and the detail behind it from drifting apart as the design moves on.

SisendCoded billClassification standardVäljundControl account per groupRolled-up group totals
4

Check that nothing is unclassified

Valideerimine

Run validation across the bill and look for positions carrying no cost group at all and for codes that sit outside the group the work belongs to, then go back to the line and correct them.

Ekraanipilt, samm 4: Check that nothing is unclassified (Valideerimine, Esita kliendile DIN 276 kuluplaan)
Valideerimine: Check that nothing is unclassified

Miks: A single uncoded position makes a group total wrong while the grand total still adds up, so the error survives every check that looks only at the bottom line. Finding it now is cheaper than explaining it in a review.

SisendCost planClassification rulesVäljundValidation reportUncoded lines flagged
5

Read the variance group by group

5D kulumudel

Go through the spine one cost group at a time and read the estimate against the budget recorded for it, so you can name which Kostengruppe carries the movement and how much of it, before you open the drill-down on the group that moved most.

Ekraanipilt, samm 5: Read the variance group by group (5D kulumudel, Esita kliendile DIN 276 kuluplaan)
5D kulumudel: Read the variance group by group

Miks: The budget question is almost never about the total, it is about which group moved and why. Having the answer per group turns a defensive meeting into a short one.

SisendGroup totalsRecorded budgetVäljundVariance per groupThe groups that moved
6

Write down what the plan assumes

Hinnapakkumise alus

Record the basis behind the numbers: which design state the plan was built on, what each cost group includes and excludes, and which figures are still an allowance rather than a priced quantity.

Miks: A cost plan is only defensible with its assumptions attached. Written down while you build it, they answer a challenge months later; reconstructed after the challenge, the same sentences read as an excuse.

SisendCost planDesign stateVäljundBasis of estimateInclusions and exclusions
7

Issue the plan to the client

Aruanded

Export the plan grouped by Kostengruppe, with the group totals, the variance against the budget and the basis alongside them, in the structure the client and their auditor already read.

Ekraanipilt, samm 7: Issue the plan to the client (Aruanded, Esita kliendile DIN 276 kuluplaan)
Aruanded: Issue the plan to the client

Miks: A client who receives the plan in the structure they work in every day can approve it. One who has to re-sort a flat total into cost groups first will send it back, and the next meeting is about the format instead of the money.

SisendValidated cost planBasis of estimateVäljundCost plan by groupClient-ready budget
Moodulid

Selle tegevusjuhendi moodulid

6 / 190 platvormi moodulit

The market this case is written for

Saksamaa

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Rohkem valdkonnas Kalkuleerimine ja hindamine

Kalkuleerimine ja hindamine

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 sammu12 minAva
Kalkuleerimine ja hindamine

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 sammu11 minAva