Rendicontare al cliente un piano dei costi secondo DIN 276

Costruisci il piano dei costi sui gruppi di costo DIN 276, codifica ogni posizione al suo Kostengruppe, leggi lo scostamento gruppo per gruppo ed emettilo al cliente nella struttura che il suo revisore si aspetta.

7 passaggi13 minConsulenza costi / QSImpresa generaleSviluppatore / committente

Come funziona, passo dopo passo

7 passi attraverso la piattaforma - cosa fare a ciascuno e perché conta.

1

Set the early cost frame

Stima concettuale

Open the conceptual estimate and put down the first cost frame: gross floor area, quality level and region give a cost per square metre, and the total comes back split across the elemental categories rather than as one number.

Perché: The client approves a figure long before there is a bill to price. Holding that early frame in the project is what lets the later, finer plan be read against something instead of arriving as a fresh number nobody recognises.

In entrataGross floor areaQuality level and regionIn uscitaEarly cost frameElemental split
2

Code every position to a Kostengruppe

Computo metrico estimativo

Work down the bill and give each position its DIN 276 code in the classification column: 300 for the Baukonstruktionen, 400 for the Technische Anlagen, 500 for the Aussenanlagen, down to the three-digit group where the work really sits.

Schermata, passaggio 2: Code every position to a Kostengruppe (Computo metrico estimativo, Rendicontare al cliente un piano dei costi secondo DIN 276)
Computo metrico estimativo: Code every position to a Kostengruppe

Perché: The cost group is what turns a flat list of positions into a plan that can be read by group. A position left uncoded is money that shows up under no heading at all when the client asks what a group contains.

In entrataPriced positionsDIN 276 cost groupsIn uscitaCoded positionsCost group on every line
3

Build the plan by cost group

Modello di costo 5D

Generate the cost spine from the bill. Each coded position lands on a control account for its cost group, so the plan appears as a tree of Kostengruppen with the totals rolled up from the positions underneath and every line still reachable.

Schermata, passaggio 3: Build the plan by cost group (Modello di costo 5D, Rendicontare al cliente un piano dei costi secondo DIN 276)
Modello di costo 5D: Build the plan by cost group

Perché: This is the elemental plan itself, and it is generated from the coded positions rather than typed next to them. That is what stops a group total and the detail behind it from drifting apart as the design moves on.

In entrataCoded billClassification standardIn uscitaControl account per groupRolled-up group totals
4

Check that nothing is unclassified

Validazione

Run validation across the bill and look for positions carrying no cost group at all and for codes that sit outside the group the work belongs to, then go back to the line and correct them.

Schermata, passaggio 4: Check that nothing is unclassified (Validazione, Rendicontare al cliente un piano dei costi secondo DIN 276)
Validazione: Check that nothing is unclassified

Perché: A single uncoded position makes a group total wrong while the grand total still adds up, so the error survives every check that looks only at the bottom line. Finding it now is cheaper than explaining it in a review.

In entrataCost planClassification rulesIn uscitaValidation reportUncoded lines flagged
5

Read the variance group by group

Modello di costo 5D

Go through the spine one cost group at a time and read the estimate against the budget recorded for it, so you can name which Kostengruppe carries the movement and how much of it, before you open the drill-down on the group that moved most.

Schermata, passaggio 5: Read the variance group by group (Modello di costo 5D, Rendicontare al cliente un piano dei costi secondo DIN 276)
Modello di costo 5D: Read the variance group by group

Perché: The budget question is almost never about the total, it is about which group moved and why. Having the answer per group turns a defensive meeting into a short one.

In entrataGroup totalsRecorded budgetIn uscitaVariance per groupThe groups that moved
6

Write down what the plan assumes

Base della stima

Record the basis behind the numbers: which design state the plan was built on, what each cost group includes and excludes, and which figures are still an allowance rather than a priced quantity.

Perché: A cost plan is only defensible with its assumptions attached. Written down while you build it, they answer a challenge months later; reconstructed after the challenge, the same sentences read as an excuse.

In entrataCost planDesign stateIn uscitaBasis of estimateInclusions and exclusions
7

Issue the plan to the client

Report

Export the plan grouped by Kostengruppe, with the group totals, the variance against the budget and the basis alongside them, in the structure the client and their auditor already read.

Schermata, passaggio 7: Issue the plan to the client (Report, Rendicontare al cliente un piano dei costi secondo DIN 276)
Report: Issue the plan to the client

Perché: A client who receives the plan in the structure they work in every day can approve it. One who has to re-sort a flat total into cost groups first will send it back, and the next meeting is about the format instead of the money.

In entrataValidated cost planBasis of estimateIn uscitaCost plan by groupClient-ready budget
Moduli

Moduli di questo playbook

6 / 190 moduli della piattaforma

The market this case is written for

Germania

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Altro in Stima e costi

Stima e costi

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 passaggi12 minApri
Stima e costi

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 passaggi11 minApri