Métrer un devis quantitatif selon l'ASMM 6

Réglez les preambles avant de métrer, relevez les dimensions sur les plans, gardez les quantités nettes et les pertes dans le prix unitaire, rédigez les postes dans les sections de corps d'état que fixe la norme, sortez les provisional et prime cost sums des prix unitaires, et validez le bordereau avant qu'il ne parte à l'appel d'offres.

6 étapes20 minÉconomie de la construction / métréEntreprise généraleBureau de gestion de projet / de construction

Comment ça marche, étape par étape

6 étapes à travers la plateforme - ce que vous faites à chacune et pourquoi c’est important.

1

Settle the preambles before you take a dimension

Base d'estimation

Write the basis down first: that the bill is measured to the Australian Standard Method of Measurement of Building Works, sixth edition, which departures from it the job needs and why, what the rates are deemed to include, and what the bill does not cover. Record the drawing revisions the measurement is being taken from in the same place.

Pourquoi: The preambles are the part of the bill that is read only when there is a dispute, which is exactly why they have to be written when there is not. A tenderer who priced a rate on the assumption it excluded something the measurer assumed it included has not made an arithmetic mistake, and no amount of levelling afterwards recovers the difference.

EntréeMethod of measurement adoptedScope and exclusionsRésultatPreambles recordedWhat each rate is deemed to include
2

Take the dimensions off the drawings

Mesures PDF

Open the drawings on the measurement canvas, calibrate the scale against a figured dimension rather than a printed scale bar, and take the areas in square metres, the lengths in metres and the counts each trade section needs. Every measurement keeps the sheet number and the revision it came off.

Pourquoi: A drawing is reissued on every live job, and the only measurements that survive a reissue are the ones you can find again. A quantity with no sheet behind it cannot be rechecked, so it has to be re-taken from scratch, and the second take-off never agrees with the first.

EntréeTender drawingsPreambles recordedRésultatDimensions taken offEvery measurement tied to a sheet
3

Keep the quantity net and the waste in the rate

Coefficients de perte

Set the waste allowance for each material on its own register, so the bill quantity stays the net quantity of finished work the standard asks for and the cutting, laps, returns and breakage are priced where they belong. Reinforcement laps, tile cutting and plasterboard offcuts all live here rather than in the measured area.

Pourquoi: A quantity quietly grossed up for waste reads as a measurement and behaves as a rate, and nobody downstream can tell which it is. It also breaks the one thing a bill is for, because the next valuation measures the finished work on site and finds less of it than the bill said there would be.

EntréeDimensions taken offHow the trade is actually builtRésultatNet quantities of finished workWaste carried in the rate
4

Write each item the way the standard describes it

Devis quantitatif

Write each item with the description, the unit and the quantity the standard calls for, and group the items into the trade sections it organises the work by. Price them from the cost database or from your own rates. An Australian bill is measured by trade, and the elemental view of the same money is produced alongside it rather than instead of it.

Pourquoi: The description is the contract between the measurer and the estimator. An item written loosely gets priced six different ways by six tenderers, and the levelling that follows is an argument about your own words rather than about their offers.

EntréeNet quantities of finished workUnit ratesRésultatPriced bill of quantitiesItems in their trade sections
5

Hold the provisional and prime cost sums out of the rates

Provisions et aléas

Put each provisional sum and each prime cost sum on the register as its own entry, with the amount, what it is meant to cover and the allowance for the builder's profit and attendance on it. Draw against them as the work is instructed and watch what is left.

Pourquoi: A sum folded into a rate is a sum nobody can release and nobody can adjust, so the contract sum adjustment at the end becomes archaeology. Held openly, both sides read the same figure and the final account is arithmetic.

EntréePriced bill of quantitiesWork not yet designedRésultatProvisional sums heldPrime cost sums on the register
6

Validate the bill before it goes to tender

Validation

Run the bill through validation for the item left at zero, the unit that contradicts its own description, the quantity that no longer agrees with the take-off it came from and the trade section that was never measured at all. Fix what it reports and run it again until it comes back clean.

Pourquoi: One bill goes to every tenderer at once, so one mistake is priced by all of them. Catching it while the document is still yours costs an hour; catching it after the tenders are in costs a re-tender or a variation on day one.

EntréePriced bill of quantitiesSums on the registerRésultatValidation reportBill cleared for tender
Modules

Modules de ce playbook

6 / 190 modules de la plateforme

Le marché pour lequel ce cas est écrit

Australie

Tout dans ce cas suit la façon dont les travaux sont métrés, chiffrés et payés sur ce marché. Les formulaires, la décomposition des coûts et les règles de paiement sont ceux qui y sont utilisés, pas une version générique.

Normes qu’il suit

  • AS 4000
  • Security of Payment Act

Vous n’avez rien de tout cela à paramétrer à la main. Au premier démarrage, la plateforme demande sur quel marché vous travaillez. Choisissez celui-ci et elle règle la langue de l’interface, charge la base de coûts correspondante, enregistre la classification des coûts et ajoute un projet d’exemple que vous pouvez ouvrir tout de suite.

Les contrôles propres à ce marché sont eux aussi fournis avec la plateforme. Une fois activés, un devis auquel il manque quelque chose que le marché attend est signalé pendant que vous y travaillez, et non après l’envoi de l’offre.

Plus dans Estimation & coûts