Postavite ugovor na AS 4000 ili AS 2124

Odaberite general conditions i zabilježite Annexure koji ih dopunjuje, utvrdite jamstvo i njegovo smanjenje, imenujte Superintendent i što smije odlučivati, unesite datume o kojima ovisi liquidated damages, rasporedite rizike koje Annexure raspoređuje, i izvršite dokument prema kojem će svi raditi.

6 koraka16 minGlavni izvođačInvestitor / naručiteljUred za upravljanje projektima / gradnjomKonzalting za troškove / QS

Kako funkcionira, korak po korak

6 koraka kroz platformu - što radite u svakom i zašto je važno.

1

Record which form it is and what the Annexure says

Ugovori

Create the contract record naming the form, AS 4000-1997 or AS 2124-1992, the contract sum and whether it is lump sum or schedule of rates, and enter the Annexure values that the rest of the job runs on. Record the principal's amendments as amendments rather than folding them into the printed clause, so anyone reading later can see what was changed from the standard.

Snimka zaslona, korak 1: Record which form it is and what the Annexure says (Ugovori, Postavite ugovor na AS 4000 ili AS 2124)
Ugovori: Record which form it is and what the Annexure says

Zašto: The commonest cause of an argument on an Australian Standard contract is two people reading two different documents, one the printed form and one the amended version. A contract record that names the form, carries the Annexure and lists the departures is what makes a clause reference a fact rather than an opinion.

UlazAward decisionPrincipal's amendmentsRezultatGeneral conditions chosenAnnexure recorded
2

Settle the security and the day it reduces

Ugovori

Record what security the contract takes, cash retention held from each progress payment or unconditional undertakings from a bank, the percentage and the limit, and the two events that release it: the reduction at practical completion and the release at the end of the defects liability period. Note who holds the guarantees and where.

Snimka zaslona, korak 2: Settle the security and the day it reduces (Ugovori, Postavite ugovor na AS 4000 ili AS 2124)
Ugovori: Settle the security and the day it reduces

Zašto: Security is the cheapest money on the job to lose track of, because nobody chases it until long after the site has closed and the people who knew the arrangement have moved on. A reduction that should have happened at practical completion and did not is working capital sitting in somebody else's account for a year.

UlazAnnexure recordedBank guarantees offeredRezultatSecurity terms on recordWhen each half is released
3

Name the Superintendent and map what they may decide

Rute odobravanja

Name the Superintendent and the Superintendent's Representative, and build the approval route that says which decisions they make alone, which need the principal, and what value threshold moves a direction from one to the other. Certificates, directions to vary and extensions of time all sit on that map.

Snimka zaslona, korak 3: Name the Superintendent and map what they may decide (Rute odobravanja, Postavite ugovor na AS 4000 ili AS 2124)
Rute odobravanja: Name the Superintendent and map what they may decide

Zašto: Both forms require the Superintendent to act honestly and, for the functions where they are certifying rather than acting as the principal's agent, reasonably and independently. A route that records who decided what and on what authority protects the certifier as much as the contractor, because a direction given by someone without the authority to give it is an argument waiting for the final account.

UlazGeneral conditions chosenDelegations from the principalRezultatSuperintendent namedWhat each decision needs
4

Load the dates the damages hang on

Rokovi

Put the date for practical completion, the separable portions if the contract has them, the liquidated damages rate and any limit on it, and the length of the defects liability period under watch, together with the time the Annexure allows for a claim to be made. Let each one warn before it lands.

Zašto: Liquidated damages run per day from a date, and the defects liability period ends on a date, and both are worked out from Annexure entries that nobody rereads once the job starts. A claim window that closed while the site was busy is an entitlement gone, and no notice is served on you when it happens.

UlazAnnexure recordedConstruction programmeRezultatContract dates under watchLiquidated damages rate on record
5

Write down who carries what

Registar rizika

Take the allocations out of the conditions and the Annexure and put them on the risk register in words a site manager can act on: latent conditions and what counts as one, who effects the works insurance and the public liability cover and for how much, the excepted risks, and where the contract has been amended to move a risk from the standard position.

Snimka zaslona, korak 5: Write down who carries what (Registar rizika, Postavite ugovor na AS 4000 ili AS 2124)
Registar rizika: Write down who carries what

Zašto: Latent conditions are the clause most often amended away in Australian practice, and a contractor who assumed the standard position and priced accordingly finds out the day the excavator hits rock. A risk that lives only in clause 25 of a document in a drawer is a risk nobody manages.

UlazAnnexure recordedSite information providedRezultatRisks allocated on the registerInsurances and who effects them
6

Execute it and make it the version everyone reads

E-potpisi

Send the complete set for execution, conditions, Annexure, amendments, drawings and specification listed as contract documents in the order of precedence the contract sets, and keep the executed version as the one the site, the estimator and the accounts all work from.

Zašto: Work starting before execution is normal in Australia and it is also how a job runs for six months on a draft nobody signed. The order of precedence matters as much as the signature, because it decides which document wins when the drawing and the specification disagree, and they always disagree eventually.

UlazFinal contract documentsAuthorised signatoriesRezultatExecuted contractOne version everyone reads
Moduli

Moduli u ovom playbooku

5 / 190 modula platforme

The market this case is written for

Australija

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Više u kategoriji Komercijala i ugovori

Komercijala i ugovori

Vodite podizvođački paket

Dodijelite paket radova podizvođaču, sklopite podugovor s tabelarnim pregledom vrijednosti i…

3 koraka11 minOtvori
Komercijala i ugovori

Zahtjev za plaćanje i usklađivanje

Vrednujte radove izvedene u ovom razdoblju u odnosu na ugovor, podnesite zahtjev za plaćanje…

3 koraka12 minOtvori