Fall / Kommersiellt och kontrakt
Kommersiellt och kontrakt

Sätt upp kontraktet på AS 4000 eller AS 2124

Välj de allmänna villkoren och dokumentera det Annexure som fyller i dem, fastställ security och dess minskning, namnge Superintendent och vad de får avgöra, mata in de datum liquidated damages hänger på, fördela riskerna som Annexure fördelar dem och underteckna det alla kommer arbeta utifrån.

6 steg16 minGeneralentreprenörByggherre / beställareProjekt- / byggledningsföretagKostnadsrådgivning / QS

Så fungerar det, steg för steg

6 steg genom plattformen - vad du gör i varje och varför det spelar roll.

1

Record which form it is and what the Annexure says

Kontrakt

Create the contract record naming the form, AS 4000-1997 or AS 2124-1992, the contract sum and whether it is lump sum or schedule of rates, and enter the Annexure values that the rest of the job runs on. Record the principal's amendments as amendments rather than folding them into the printed clause, so anyone reading later can see what was changed from the standard.

Skärmbild, steg 1: Record which form it is and what the Annexure says (Kontrakt, Sätt upp kontraktet på AS 4000 eller AS 2124)
Kontrakt: Record which form it is and what the Annexure says

Varför: The commonest cause of an argument on an Australian Standard contract is two people reading two different documents, one the printed form and one the amended version. A contract record that names the form, carries the Annexure and lists the departures is what makes a clause reference a fact rather than an opinion.

IndataAward decisionPrincipal's amendmentsResultatGeneral conditions chosenAnnexure recorded
2

Settle the security and the day it reduces

Kontrakt

Record what security the contract takes, cash retention held from each progress payment or unconditional undertakings from a bank, the percentage and the limit, and the two events that release it: the reduction at practical completion and the release at the end of the defects liability period. Note who holds the guarantees and where.

Skärmbild, steg 2: Settle the security and the day it reduces (Kontrakt, Sätt upp kontraktet på AS 4000 eller AS 2124)
Kontrakt: Settle the security and the day it reduces

Varför: Security is the cheapest money on the job to lose track of, because nobody chases it until long after the site has closed and the people who knew the arrangement have moved on. A reduction that should have happened at practical completion and did not is working capital sitting in somebody else's account for a year.

IndataAnnexure recordedBank guarantees offeredResultatSecurity terms on recordWhen each half is released
3

Name the Superintendent and map what they may decide

Godkännanderutter

Name the Superintendent and the Superintendent's Representative, and build the approval route that says which decisions they make alone, which need the principal, and what value threshold moves a direction from one to the other. Certificates, directions to vary and extensions of time all sit on that map.

Skärmbild, steg 3: Name the Superintendent and map what they may decide (Godkännanderutter, Sätt upp kontraktet på AS 4000 eller AS 2124)
Godkännanderutter: Name the Superintendent and map what they may decide

Varför: Both forms require the Superintendent to act honestly and, for the functions where they are certifying rather than acting as the principal's agent, reasonably and independently. A route that records who decided what and on what authority protects the certifier as much as the contractor, because a direction given by someone without the authority to give it is an argument waiting for the final account.

IndataGeneral conditions chosenDelegations from the principalResultatSuperintendent namedWhat each decision needs
4

Load the dates the damages hang on

Tidsfrister

Put the date for practical completion, the separable portions if the contract has them, the liquidated damages rate and any limit on it, and the length of the defects liability period under watch, together with the time the Annexure allows for a claim to be made. Let each one warn before it lands.

Varför: Liquidated damages run per day from a date, and the defects liability period ends on a date, and both are worked out from Annexure entries that nobody rereads once the job starts. A claim window that closed while the site was busy is an entitlement gone, and no notice is served on you when it happens.

IndataAnnexure recordedConstruction programmeResultatContract dates under watchLiquidated damages rate on record
5

Write down who carries what

Riskregister

Take the allocations out of the conditions and the Annexure and put them on the risk register in words a site manager can act on: latent conditions and what counts as one, who effects the works insurance and the public liability cover and for how much, the excepted risks, and where the contract has been amended to move a risk from the standard position.

Skärmbild, steg 5: Write down who carries what (Riskregister, Sätt upp kontraktet på AS 4000 eller AS 2124)
Riskregister: Write down who carries what

Varför: Latent conditions are the clause most often amended away in Australian practice, and a contractor who assumed the standard position and priced accordingly finds out the day the excavator hits rock. A risk that lives only in clause 25 of a document in a drawer is a risk nobody manages.

IndataAnnexure recordedSite information providedResultatRisks allocated on the registerInsurances and who effects them
6

Execute it and make it the version everyone reads

E-signaturer

Send the complete set for execution, conditions, Annexure, amendments, drawings and specification listed as contract documents in the order of precedence the contract sets, and keep the executed version as the one the site, the estimator and the accounts all work from.

Varför: Work starting before execution is normal in Australia and it is also how a job runs for six months on a draft nobody signed. The order of precedence matters as much as the signature, because it decides which document wins when the drawing and the specification disagree, and they always disagree eventually.

IndataFinal contract documentsAuthorised signatoriesResultatExecuted contractOne version everyone reads
Moduler

Moduler i denna playbook

5 / 190 plattformsmoduler

The market this case is written for

Australien

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mer inom Kommersiellt och kontrakt

Kommersiellt och kontrakt

Driv ett underentreprenadpaket

Tilldela ett entreprenadpaket till en underentreprenör, sätt det på ett underentreprenadkont…

3 steg11 minÖppna
Kommersiellt och kontrakt

Fakturaunderlag och avstämning

Värdera arbetet som utförts under perioden mot kontraktet, skapa fakturaunderlaget med under…

3 steg12 minÖppna