Kasus / Estimasi dan biaya
Estimasi dan biaya

Menyusun elemental cost plan menurut Australian Cost Management Manual

Tetapkan gross floor area dan unit fungsionalnya, susun rencana elemen demi elemen pada daftar elemen AIQS, beri harga setiap elemen dari proyek yang dianalisis, eskalasikan ke pertengahan konstruksi, jaga kontingensi desain dan konstruksi tetap terpisah, dan terbitkan rencana yang bisa dibandingkan dengan yang berikutnya.

6 langkah18 mntKonsultansi biaya / QSPengembang / klienBiro manajemen proyek / konstruksi

Cara kerjanya, langkah demi langkah

6 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Fix the area, the functional unit and the exclusions

Dasar Estimasi

Record the gross floor area the plan is built on, measured the way the manual measures it, the functional unit the client thinks in, beds, car spaces, classrooms or seats, and the list of what the plan excludes: land, authority charges, loose furniture, client contingency and the escalation beyond the horizon you have priced to.

Mengapa: Two cost plans for the same building differ by a fifth when they measure area differently, and neither is wrong. Everything downstream is a rate per square metre, so an area defined loosely puts the same looseness on every element at once, and no later check finds it because every element is internally consistent.

MasukanProject brief and area scheduleDesign stage reachedHasilGross floor area agreedInclusions and exclusions stated
2

Build the plan element by element

Estimasi Konseptual

Work down the element list rather than around the drawing: substructure, columns, upper floors, staircases, roof, external walls, windows and external doors, internal walls and doors, the three finishes, fittings, services and external works. Each element carries its own quantity, its element unit quantity and its cost, so the number can be argued about one element at a time.

Mengapa: An element list worked through in order is also a completeness check, because an element with nothing against it is visible and a missing trade in a lump sum is not. It is how a plan produced in a day still has a roof in it.

MasukanGross floor area agreedConcept drawingsHasilCost plan by elementElement quantities
3

Rate each element against projects already analysed

Cost Explorer

Compare each element unit rate with the same element on completed projects of the same type, and write down the reason for every element that sits outside the range. A facade rate double the library is either a design decision worth naming or an error, and the difference between those two is a sentence.

Mengapa: Elemental analysis exists so that a plan can be challenged before it is approved rather than after it is exceeded. An element that nobody could explain at the design review is the same element that becomes the overrun, and it was visible months earlier.

MasukanCost plan by elementAnalysed projectsHasilElements benchmarkedOutlying elements explained
4

Escalate to the middle of construction, not to today

Indeks Harga

Record the base date the rates are current at, then escalate them to the midpoint of the construction period the programme implies. State both dates on the plan, and state the index you escalated with.

Tangkapan layar, langkah 4: Escalate to the middle of construction, not to today (Indeks Harga, Menyusun elemental cost plan menurut Australian Cost Management Manual)
Indeks Harga: Escalate to the middle of construction, not to today

Mengapa: A cost plan priced at today's rates for a building that starts in eighteen months is wrong on the day it is issued, and it is wrong in the direction nobody wants to discover later. Naming the base date is what lets a board read the number as an estimate of a future cost rather than as a price.

MasukanElements benchmarkedIndicative programmeHasilEscalated to a stated dateBase date on the record
5

Keep the two contingencies apart

Cadangan & Kontingensi

Carry a design contingency for the drawings that are not finished yet and a separate construction contingency for what the site will find, each as its own entry with what it is for. Reduce the design one as the design is resolved rather than letting it drift into the construction one.

Tangkapan layar, langkah 5: Keep the two contingencies apart (Cadangan & Kontingensi, Menyusun elemental cost plan menurut Australian Cost Management Manual)
Cadangan & Kontingensi: Keep the two contingencies apart

Mengapa: One combined contingency answers no question. It cannot be released as the design firms up, because nobody can say which part was for the design, and it cannot be defended when the site finds rock, because it has already been spent on documentation gaps.

MasukanEscalated to a stated dateKnown design gapsHasilDesign contingencyConstruction contingency
6

Issue it against the plan it replaces

Laporan

Issue the plan with the element table, the rate per square metre, the rate per functional unit and a reconciliation against the previous plan that says which elements moved and why. Keep it as the version the next design review is measured from.

Tangkapan layar, langkah 6: Issue it against the plan it replaces (Laporan, Menyusun elemental cost plan menurut Australian Cost Management Manual)
Laporan: Issue it against the plan it replaces

Mengapa: A cost plan issued without a reconciliation is a new number rather than a report on the old one, and the conversation it produces is about whether to believe it. With the movement written out element by element, the same meeting is about four decisions that were already made.

MasukanComplete cost planPrevious cost planHasilCost plan issuedMovement since the last plan
Modul

Modul dalam playbook ini

6 / 190 modul platform

The market this case is written for

Australia

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Lainnya di Estimasi dan biaya

Estimasi dan biaya

Estimasi dari basis data biaya

Ambil item berharga dari basis data biaya yang nyata, bangun bill darinya, kelompokkan build…

4 langkah12 mntBuka