Davis-Bacon の賃金を支払い certified payroll を提出する

積算前に wage determination を現場に取り込み、各区分を実際に誰かが行う work に対応付け、現場で区分ごとの時間を記録し、determination が定める基本単価と fringe を支払い、署名された statement of compliance とともに certified payroll を毎週提出する。

7ステップ15 分総合建設会社専門工事業者コストコンサルティング会社 / 積算事務所

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Pull the wage determination in before you price anything

労務単価

Load the wage determination that came with the solicitation as a rate table: every classification, its basic hourly rate and its fringe rate, with the determination number and its date recorded beside them. Mark the classifications your crews will work that the determination does not list, because those need a conformance request to the contracting officer rather than a rate you picked yourself.

スクリーンショット、ステップ 1: Pull the wage determination in before you price anything (労務単価, Davis-Bacon の賃金を支払い certified payroll を提出する)
労務単価: Pull the wage determination in before you price anything

理由: The determination is the floor, it is county specific and trade specific, and it is not negotiable at any point after award. Reading it after the bid is submitted is how a job is won at a labour rate that does not exist, and a classification handled by inventing a rate is the one the audit finds, because a rate nobody conformed has no paper behind it.

入力Solicitation documentsWage determination出力Rate table loadedClassifications not listed
2

Price the work at the determination, not at your shop rate

内訳書

Build the crew rate behind each item from the determination's basic rate plus its fringe, then add the burdens the fringe does not cover, and price overtime at time and a half beyond forty hours in the week. Keep the difference between this and your ordinary shop rate visible as its own figure.

スクリーンショット、ステップ 2: Price the work at the determination, not at your shop rate (内訳書, Davis-Bacon の賃金を支払い certified payroll を提出する)
内訳書: Price the work at the determination, not at your shop rate

理由: The fringe is part of the obligation and not an allowance, so a bill priced on base rates alone is short by the fringe on every hour. Keeping the difference from your ordinary rates visible is what lets the company decide whether it wants this kind of work at all, rather than finding out at the post mortem that federally funded jobs quietly lose money.

入力Rate table loadedScope and quantities出力Priced billCost above shop rates
3

Capture hours by classification, not by name alone

現場時間

Book every hour worked on site against the classification the work belongs to and the day it happened. Where somebody worked two classifications in one day, record both with the hours split between them rather than putting the whole day under the higher one or the lower one.

理由: The certified payroll is a statement about hours by classification, so a timesheet that records only hours by person cannot produce it and has to be reconstructed from memory every Friday. Split days are where reconstruction goes wrong, and an underpayment found months later is repaid with interest plus whatever the agency withholds while it looks at the rest of the file.

入力Crew on siteClassification list出力Hours by classificationSplit-classification days
4

Pay weekly, with the fringe in cash or into a real plan

給与

Run the payroll once a week, pay each worker the basic rate for the classification they worked, and settle the fringe either as cash on the paycheck or as a contribution to a bona fide plan, recorded either way. Pay apprentices at their program rate only where they are registered in an approved program and only within the ratio it allows, and list every deduction taken.

理由: Weekly payment is part of the obligation, not a company habit, and an unregistered apprentice is simply a journeyman being underpaid. Deductions are the other common finding: anything beyond the ones permitted turns a correct gross wage into an incorrect net one, and it is the net figure the investigator reads first.

入力Hours by classificationFringe benefit plans出力Weekly payroll runDeductions recorded
5

File the weekly certified payroll and sign the statement

文書

Produce the payroll for each week the crew worked on the site, showing every worker with their classification, hours by day, rate, gross, deductions and net, and file it with the contracting agency within the days the contract allows after the pay date. Attach the signed statement of compliance and keep the filed copy with the week it covers. The published form is optional; the information on it is not.

スクリーンショット、ステップ 5: File the weekly certified payroll and sign the statement (文書, Davis-Bacon の賃金を支払い certified payroll を提出する)
文書: File the weekly certified payroll and sign the statement

理由: This is the document that turns paying correctly into having proved it, and it is signed personally under penalty, which is why it should never be assembled by somebody who did not see the hours. A week filed late is a compliance finding on its own, before anybody has looked at whether the wages themselves were right, and the usual remedy is the agency holding the next payment.

入力Weekly payroll runWage determination出力Certified payroll filedStatement of compliance
6

Hold every subcontractor to the same obligation

下請業者一覧

Write the wage clauses and the determination into every subcontract at every tier, then make the week's certified payroll a condition of that subcontractor being paid rather than something chased afterwards. Read what they send: a payroll with a classification that is not on the determination, or a rate below it, is a finding you can still fix.

スクリーンショット、ステップ 6: Hold every subcontractor to the same obligation (下請業者一覧, Davis-Bacon の賃金を支払い certified payroll を提出する)
下請業者一覧: Hold every subcontractor to the same obligation

理由: The prime contractor answers for the compliance of the whole chain, so a second tier subcontractor underpaying its crew is the prime's restitution to pay and the prime's payments the agency withholds. Gating the money on the paperwork is the only mechanism that reliably produces the paperwork, and it costs nothing while the money is still yours.

入力Subcontract listSubcontractor payrolls出力Payment gated on the payrollCompliance record per sub
7

Put the weekly clock and the retention date under watch

期限

Set the weekly filing date as a recurring deadline for as long as anyone works on the site, add the posting of the determination and the worker notice at the site entrance, and record the date the payroll records may finally be destroyed, counted from completion rather than from the last pay date.

スクリーンショット、ステップ 7: Put the weekly clock and the retention date under watch (期限, Davis-Bacon の賃金を支払い certified payroll を提出する)
期限: Put the weekly clock and the retention date under watch

理由: An investigation usually arrives long after the crews have gone, and it asks for the weeks nobody remembers. Records destroyed before the retention period ends leave the contractor unable to prove a payment it actually made, which in practice is the same position as not having made it.

入力Weekly filing scheduleRecord retention rule出力Filing dates under watchRecords kept to the end date
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 7 個

The market this case is written for

アメリカ合衆国

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CSI MasterFormat
  • UniFormat II
  • AIA A201

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

コマーシャルと契約の他のケース

コマーシャルと契約

変更を支払われる契約変更に変える

施工範囲の変更を発生時に記録し、合意単価に基づいて契約変更として見積もり、次の出来高請求に計上することで、追加工事が静かに吸収されるのではなく回収されるようにします。

3ステップ11 分開く
コマーシャルと契約

下請パッケージを運用する

下請業者に工種パッケージを発注し、出来高内訳書と保留金付きの下請契約に載せ、実際に完了した作業に対して出来高払いで支払っていく。

3ステップ11 分開く
コマーシャルと契約

出来高査定申請と照合

今期に実施した工事を契約に照らして評価し、根拠となる証憑とともに出来高査定申請を起票し、認定された内容と実際に入金された内容を照合する。

3ステップ12 分開く