签约前先查承包商登记簿

核实这家公司确实在 kivitelezői nyilvántartás 上,并且为该工程指定了具备资格的 felelős műszaki vezető,把登记内容与你要发包的标段对上,把两件事都写进书面分包合同,并把这次核查连同日期一起存档保存下来。

7 个步骤11 分钟总承包商项目/施工管理公司开发商/业主专业分包商

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

Find the firm on the contractors' register

分包商目录

Look the firm up on the public register of vallalkozo kivitelezok kept by the chamber and record on their directory entry that you did, with the date and what you found: registration number, the activities they are registered for and whether the entry is current.

原因: The register is the only place the question is answered by a fact rather than by an assurance. A firm that has been building for years may still have let its entry lapse, and one that has just started has five working days to appear on it, so an absence at tender time is a question and not automatically a refusal. Recording what you found and when is how the check keeps its value later.

输入Firm and company numberPackage to be let成果Register entry foundCheck recorded on the firm
2

Check the felelos muszaki vezeto by name

联系人

Get the name of the person who will direct the work, check that their chamber registration covers this kind of work, and put them on the project as a contact with the role recorded rather than leaving the firm to identify them after mobilisation.

原因: Government Decree 191/2009 (IX. 15.) puts the direction of the works on a felelos muszaki vezeto with the right qualification, and that person signs entries in the naplo and the declarations at completion. A firm that cannot name one before the contract will name one late, or will name somebody who is covering four other sites, and the shortfall shows up as a naplo nobody is signing.

输入Named felelos muszaki vezetoNature of the work成果Registration verifiedContact on the project
3

Match the entry to the work you are letting

采购

Compare what the firm is registered for against what your package actually contains, and flag the parts that fall outside it. Decide before award whether those parts come out of the package, go to somebody else, or are covered by a specialist the firm will engage.

原因: A registration is not a general licence, and the mismatch is usually at the edges: the groundworker who also has a small amount of structural work, the fit-out firm carrying two days of electrical. Finding it at award is a scope conversation. Finding it on site is a stoppage, and the work already done still has to be signed off by somebody.

输入Register entryPackage scope成果Scope matched to the entryWork outside the entry flagged
4

Put it in the written contract, with its annexes

合同

Write the subcontract with the content the Epkiv. requires, name the felelos muszaki vezeto in it, and attach the itemised bill and the other annexes the decree lists. Include the obligation to keep the registration current and to tell you if it changes.

原因: Government Decree 191/2009 (IX. 15.) requires the kivitelezesi szerzodes to be in writing and says what it carries, so a package let on an email and a price is not a contract that satisfies the decree. It is also the document a payment dispute is read against, and the annexes are the half of it that decides what was in the price.

输入Verified firm and personPriced tetel list成果Written kivitelezesi szerzodesAnnexes attached
5

Keep the chain below them visible too

分包商目录

Record who this firm will use under it, apply the same two checks to those firms, and make the alnaplo obligation part of the package so every contractor in the chain shows up in the site record rather than only in the payment chain.

原因: The chain is where the risk actually sits, because a firm you checked can engage one you did not, and on a Hungarian site the naplo is where that becomes visible. It also matters commercially: an unregistered firm two levels down is still working on your site, and its claim for payment lands in your chain when the firm above it fails.

输入Signed subcontractFirms below them成果Contractor chain on recordAlnaplo obligations set
6

Run the checks as a gate, not as a habit

校验

Before award, validate that the package has what it needs: a current register entry, a named and registered felelos muszaki vezeto, a scope that matches the entry, insurance where the contract requires it, and a written contract with its annexes attached.

原因: These checks are individually trivial and collectively the thing nobody has time for at the moment a package is awarded, which is always late and always under pressure. Making them a gate rather than a good intention is the only version that survives a busy month, and a busy month is when the risky award happens.

输入Award packageRecorded checks成果Validation reportCleared for award
7

Keep the check with the date you made it

文档

File what you looked at, not just the conclusion: the register entry as it read on the day, the felelos muszaki vezeto's registration, the contract and its annexes. On a long job, set a date to look again.

原因: A register entry is a fact about a day rather than a permanent state, and a firm can be removed from it while it is on your site. The dated evidence is what shows you checked before you signed rather than after somebody asked, and that distinction is the whole point of having done it.

输入Register and registration evidenceSigned contract set成果Dated evidence packRe-check scheduled
模块

此方案使用的模块

190 个平台模块中的 6

The market this case is written for

匈牙利

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 招标与采购 案例

招标与采购

基于工程量清单开展招标

将已计价的工程量清单推向市场:打包、邀请分包商、比选报价并确定中标方。五个步骤,全程贯通。

5 个步骤12 分钟打开
招标与采购

从工程量清单采购材料

采购已定价的工程量:从清单发起请购单,向供应商下单,并在现场验收入库。

4 个步骤10 分钟打开
招标与采购

比较投标并定标

面对一叠始终对不齐的投标文件,把它们统一还原到同一个工作范围,再向客户交出一份经得起审查的定标决定。

3 个步骤12 分钟打开