案例 / 移交与全生命周期
移交与全生命周期

把隐蔽缺陷的五年追责期一直保持有效

确定经认证的最终完工日期,保存好能让隐蔽缺陷可被证明的移交资料,把已转让给业主的各项质保放在有人找得到的地方,并把 5 年后的截止日期摆在那个届时还在岗的人面前。

6 个步骤11 分钟开发商/业主业主/运营方(设施管理)项目/施工管理公司

运作方式,逐步说明

贯穿平台的 6 个步骤 - 每一步做什么,以及为什么重要。

1

Record the certified date and count five years from it

收尾

Take the certified date of final completion off the certificate itself, store the certificate with the project rather than in a personal folder, and calculate the date five years on that clause 22.1 gives as the end of the latent defects liability period.

原因: Everything else in this case counts from that one date, and it is not the date of practical completion, the date of the handover meeting or the date the client moved in. Clause 22.3 also runs five years from termination where the agreement was terminated early, so a job that ended badly has a different start date and usually nobody who wrote it down.

输入Certificate of final completionSigned contract成果Certified date recordedFive year end date
2

Keep the record that makes a hidden defect provable

文档

Hold the as-built drawings, the specifications, the test and commissioning results, the material approvals and the consolidated health and safety file handed over under regulation 7(1)(e) of the Construction Regulations, 2014, indexed so somebody who was not on the project can find a detail by where it is in the building.

原因: A latent defect claim turns on showing what was specified, what was actually built and why the difference was not visible at final completion. That is a documents case, and the documents are the ones handed over at the end of the job. A pack that exists but cannot be searched is, four years later, the same as no pack.

输入As-built drawingsHealth and safety file成果Handover packSearchable index
3

Register every warranty against what it covers

质保与缺陷责任

Register the subcontractor guarantees and product warranties ceded to the employer at final completion under clauses 21.10 and 21.11, each against the element it covers, the party liable under it and the date it runs out.

原因: A waterproofing guarantee and the latent defects liability period are two separate routes to the same repair, and they expire on different days against different parties. An owner that registered neither ends up paying for a roof it had two claims for, and the subcontractor whose warranty it was has usually moved on by then.

输入Ceded warrantiesProduct guarantees成果Warranty registerParty liable
4

Put the building somewhere it will be looked at

资产台账

Load the building and its plant onto the asset register with the warranty and the latent defects end date attached, and set an inspection before that date rather than only routine maintenance after it.

原因: Latent defects are latent, which means nobody is going to trip over them. The failures that are still recoverable in year four, movement in a slab, a failing membrane, a settled apron, are the ones somebody went looking for. An inspection booked deliberately against the end date is the only mechanism that turns a five year right into five years of use.

输入Handover packInstalled plant成果Asset registerInspection schedule
5

Log the fault as evidence, not only as a repair

服务与维护

When a fault is reported, log it with the date, the location, photographs and any readings before anyone opens anything up, and classify it: wear, an operating fault, a defect covered by a live warranty, or a construction defect that was not discoverable at final completion.

原因: The most common way a good latent defect claim dies is that maintenance repaired the evidence in the first week. Once the failed detail has been cut out and replaced, what remains is an invoice and an opinion. Recording the condition before the repair costs an hour and is the whole difference between a claim and a complaint.

输入Reported faultPhotos and readings成果Logged jobCause and classification
6

Raise it in writing while the period is still open

截止日期

Put the defect to the contractor in writing with the evidence attached and the contractual basis named, track the claim against the end of the latent defects liability period, and keep the deadline visible to whoever holds the building rather than only to the project team that has moved on.

原因: Clause 21.12 makes the certificate of final completion conclusive as to the sufficiency of the works other than for latent defects, so the latent defects liability period in clause 22.0 is the only door left open. A claim raised a week after the five years is worth exactly nothing however good the evidence behind it, and the person who would have known the date usually left the company in year two.

输入Classified defectFive year end date成果Notice to the contractorTracked claim
模块

此方案使用的模块

190 个平台模块中的 6

The market this case is written for

南非

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • JBCC 6.2
  • SANS 1921

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 移交与全生命周期 案例

移交与全生命周期

移交与收尾

干净利落地完成项目:把待办清单清零,确认所有检查均已通过且没有未关闭的不符合项,汇总竣工资料,出具签署的移交文件。

5 个步骤14 分钟打开
移交与全生命周期

竣工资料与运维手册移交

汇总竣工资料,证明质量档案完整无缺,再签发一份运营方真正能据此运行建筑的运维手册。

3 个步骤12 分钟打开
移交与全生命周期

开展交付验收检查

与客户一起巡查已完工工程,依据验收标准记录合格与不合格项,将缺陷清单降至零,并发出正式验收。

3 个步骤11 分钟打开