案例 / 招标与采购
招标与采购

在沙特化和本地含量要求下划分分包包件

把工程拆成若干包件,按分级、Saudization 等级和 local content 而不是只按价格进行资格预审,在同一口径下比价,把两项义务都写进分包合同,并逐月证明实际交付的水平。

7 个步骤18 分钟总承包商项目/施工管理公司专业分包商

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

Break the works into packages that carry their own share

采购

Split the works into procurement packages and give each one its share of what the main contract committed you to: the labour content, the local content percentage and the value it represents. Say which packages are labour heavy and which are supply heavy, because they carry the two obligations in opposite proportions.

屏幕截图,步骤 1:Break the works into packages that carry their own share (采购, 在沙特化和本地含量要求下划分分包包件)
采购: Break the works into packages that carry their own share

原因: A commitment held only at project level is one nobody can be held to. Split across packages, each buyer knows the number their package has to deliver and can see at award whether they have bought it. A local content target that arrives at the end as a single project percentage is a target that gets discovered as a shortfall when there is nothing left to buy.

输入Works scopeMain contract obligations成果Package breakdownTarget per package
2

Prequalify on the things that can stop the work

分包商目录

Check each candidate on the record rather than on the reference: contractor classification in the field and activity the package needs, current commercial registration, zakat, tax and social insurance certificates, the Nitaqat band, and the local content certificate with the percentage it actually states.

屏幕截图,步骤 2:Prequalify on the things that can stop the work (分包商目录, 在沙特化和本地含量要求下划分分包包件)
分包商目录: Prequalify on the things that can stop the work

原因: The band is the one people skip because it looks like the subcontractor's own business. It is not. A firm in the red band cannot renew work permits or transfer workers in, so the crew it promised for month four is a crew it has no lawful way to assemble. Reading the band at prequalification is how you find that out while there is still another bidder.

输入Candidate subcontractorsPrequalification criteria成果Approved bidder listCertificates on file
3

Enquire so the answers can be compared

招投标

Send one enquiry with one bill, and require each bidder to state the same things beside the price: the local content he will deliver and how it is made up, the crew he will staff the package with, and where that labour comes from. Compare the returns on those columns as well as on the total.

屏幕截图,步骤 3:Enquire so the answers can be compared (招投标, 在沙特化和本地含量要求下划分分包包件)
招投标: Enquire so the answers can be compared

原因: Priced against a common bill, the cheapest number is a fact. Priced against three different assumptions about who supplies the labour, it is a guess. Asking for the local content composition at enquiry also does something the award cannot: it lets you see which bidder has thought about it, because the one who has will answer with named suppliers and the one who has not will answer with a percentage.

输入Approved bidder listPackage documents成果Comparable quotationsComparison on one basis
4

Write both obligations into the subcontract

合同

Draw the subcontract with the commitments as terms rather than as expectations: the local content percentage and how it will be evidenced, wage protection compliance as a condition of payment, the obligation to keep the classification and the certificates current, and notice to you if the band changes.

屏幕截图,步骤 4:Write both obligations into the subcontract (合同, 在沙特化和本地含量要求下划分分包包件)
合同: Write both obligations into the subcontract

原因: You are answerable to the employer for numbers you do not control. Where the obligation is written down, a shortfall is a breach with a remedy attached and the conversation happens in month three. Where it is not, the first anybody hears of it is your own report to the client, and by then the only remedy left is to explain.

输入Award decisionCommitments made at tender成果Subcontract executedObligations written in
5

Watch the certificates and the band, because both move

截止日期

Register the expiry of every certificate you prequalified on and re-check the band at agreed points through the package rather than only at award. Ask for the evidence again before each milestone payment, not because the subcontractor is suspected but because a band is a moving measurement.

原因: A band is recalculated as the workforce changes, so a subcontractor who was green at award can be red by the time he mobilises without having done anything visible. Since April 2026 an employment contract that is not documented electronically on the labour platform stops counting toward the percentage, which means a firm can slip a band through paperwork alone.

输入Subcontractor certificatesBands at award成果Renewal registerSlippage caught early
6

Evidence what was delivered, not what was promised

报告

Build the local content position from the spend that actually went out, supplier by supplier, with the certificate or declaration behind each line, and report it against what was committed. Where the job also reports under the in-Kingdom total value add programme of an operator, keep that measurement separate rather than reusing the government figure, because the two methodologies are not the same.

屏幕截图,步骤 6:Evidence what was delivered, not what was promised (报告, 在沙特化和本地含量要求下划分分包包件)
报告: Evidence what was delivered, not what was promised

原因: Local content is audited against invoices, so a figure assembled from intentions does not survive the first sample. Keeping the two schemes apart matters just as much: they are administered by different bodies, measured on different rules and reported on different platforms, and a contractor who submits one authority's number to the other has filed something he cannot support.

输入Spend by supplierSupplier declarations成果Local content deliveredVariance against commitment
7

Certify against the evidence the subcontract asked for

财务

Value the subcontractor's work as measured and check the conditions the subcontract attached to payment before certifying: wage compliance evidence for the period, the certificates still current, the local content return submitted. Where something is withheld, state which term it is withheld under and what would release it.

屏幕截图,步骤 7:Certify against the evidence the subcontract asked for (财务, 在沙特化和本地含量要求下划分分包包件)
财务: Certify against the evidence the subcontract asked for

原因: A condition nobody checks is a condition that was never agreed. Checking it at each valuation is also fairer than the alternative, which is a large deduction at the end for months of small omissions nobody mentioned. A withholding that names its clause and its cure gets fixed. One that just appears becomes a dispute about the deduction rather than about the obligation.

输入Subcontractor applicationCompliance evidence成果Payment certifiedAmounts withheld with a reason
模块

此方案使用的模块

190 个平台模块中的 7 个

The market this case is written for

沙特阿拉伯

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 招标与采购 案例

招标与采购

基于工程量清单开展招标

将已计价的工程量清单推向市场:打包、邀请分包商、比选报价并确定中标方。五个步骤,全程贯通。

5 个步骤12 分钟打开
招标与采购

从工程量清单采购材料

采购已定价的工程量:从清单发起请购单,向供应商下单,并在现场验收入库。

4 个步骤10 分钟打开
招标与采购

比较投标并定标

面对一叠始终对不齐的投标文件,把它们统一还原到同一个工作范围,再向客户交出一份经得起审查的定标决定。

3 个步骤12 分钟打开