Případy / Obchodní a smlouvy
Obchodní a smlouvy

Vystavit tax invoice a přiřadit GST k dílčí platbě

Nastavte GST na deset procent a vyznačte, co z něj vypadá, vystavte tax invoice s náležitostmi, které vyžaduje zákon, přiřaďte každou dílčí složku ke správnému období podle Division 156, ošetřete retention při zadržení i při uvolnění, ověřte ABN každého subdodavatele před platbou, a odsouhlaste období pro activity statement.

6 kroků14 minGenerální dodavatelSpecializovaný subdodavatelNákladové poradenství / rozpočtářství

Jak to funguje, krok za krokem

6 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

Set the rate and mark what sits outside it

Daňové sazby

Set GST at ten per cent on the project and mark the amounts that are not consideration for a taxable supply, so they never pick the rate up by default. Liquidated damages deducted, a payment of damages and a security deposit that has not been forfeited are the ones that come up on a building job.

Snímek obrazovky, krok 1: Set the rate and mark what sits outside it (Daňové sazby, Vystavit tax invoice a přiřadit GST k dílčí platbě)
Daňové sazby: Set the rate and mark what sits outside it

Proč: The rate is the easy half. The expensive half is a deduction that was never a supply being run through the same tax treatment as the work, because the error is invisible on the face of the invoice and repeats every month until somebody reconciles a year of it at once.

VstupGST registration and ABNWhat the contract suppliesVýstupGST rate set on the projectAmounts outside the tax
2

Issue a document that is actually a tax invoice

Finance

Raise the invoice with everything the law asks a tax invoice to show: that it is intended as a tax invoice, your identity and your ABN, the date, what was supplied, the GST amount or a statement that the total includes GST, and the recipient's identity or ABN once the sale reaches the threshold at which that is required. Where the principal issues a recipient created tax invoice instead, record the written agreement that allows it.

Snímek obrazovky, krok 2: Issue a document that is actually a tax invoice (Finance, Vystavit tax invoice a přiřadit GST k dílčí platbě)
Finance: Issue a document that is actually a tax invoice

Proč: A recipient cannot claim the input tax credit without a valid tax invoice, so a document short of one particular is not a small formatting problem, it is a payment your client's accounts team will hold until it is reissued. On a monthly claim cycle that is a month of cash for a missing line of text.

VstupCertified progress claimSupplier and recipient detailsVýstupTax invoice issuedRequired particulars present
3

Attribute each component to the period it belongs in

Platby

Record the date the invoice was issued and the date payment came in against each progress component, and let the period follow the basis you account on. Division 156 treats each progressive or periodic component of a supply as a separate supply for this purpose, so the building being unfinished does not defer anything.

Snímek obrazovky, krok 3: Attribute each component to the period it belongs in (Platby, Vystavit tax invoice a přiřadit GST k dílčí platbě)
Platby: Attribute each component to the period it belongs in

Proč: A builder who waits for practical completion to account for the GST on two years of progress claims has been reporting a series of periods wrong, and the correction arrives with interest attached. The dates that settle it are the invoice date and the payment date, both of which are on the record already if anybody thought to keep them.

VstupTax invoice issuedCash or accruals basisVýstupComponent in the right periodInvoice and payment dates recorded
4

Handle retention once, not twice

Zádržné

Track retention as an amount withheld from a claim that has already been made rather than as a separate later sale, with the balance held, the reduction at practical completion and the release at the end of the defects liability period each carrying its own date.

Snímek obrazovky, krok 4: Handle retention once, not twice (Zádržné, Vystavit tax invoice a přiřadit GST k dílčí platbě)
Zádržné: Handle retention once, not twice

Proč: Retention is the place the two common errors meet. Treated as a new supply on release, the GST is reported twice; forgotten entirely, the last five per cent of a job is never chased at all. Held as a running balance with dates on it, both problems disappear and the release becomes something somebody is watching for.

VstupRetention withheld this periodRetention due for releaseVýstupRetention treated onceBalance held by release date
5

Check the ABN before you pay the subcontractor

Srážková daň

Check that each supplier has quoted an ABN and whether it is registered for GST, and set the withholding on the ones that have not. An invoice from a supplier who is not registered for GST should not be carrying a GST line at all, and paying one that does is money you cannot claim back.

Proč: Where no ABN is quoted for a taxable supply the payer is required to withhold at the top rate and remit it, and the liability for not doing so sits with the payer rather than with the supplier who left it off. Checking at the first invoice costs a minute and settles the whole job.

VstupSubcontractor invoicesABN quoted or missingVýstupABN and GST status checkedWithholding applied where required
6

Reconcile the period before the activity statement

Reporty

Report the period: what was invoiced, what was received, the GST collected and the credits claimed, with the differences named rather than left as a rounding. Keep the report so the same question about the same month can be answered a year later without rebuilding it.

Snímek obrazovky, krok 6: Reconcile the period before the activity statement (Reporty, Vystavit tax invoice a přiřadit GST k dílčí platbě)
Reporty: Reconcile the period before the activity statement

Proč: The activity statement is a return, so an error in it is a correction rather than an adjustment, and corrections come with interest. A reconciliation that names its differences each month is also the only version of this work that takes an hour instead of a fortnight when a review asks for it.

VstupComponents in the periodInput tax credits claimedVýstupPeriod totals reconciledDifferences explained
Moduly

Moduly v tomto playbooku

4 / 190 modulů platformy

The market this case is written for

Austrálie

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Více v kategorii Obchodní a smlouvy

Obchodní a smlouvy

Zpracujte subdodavatelský balík

Zadejte řemeslný balík subdodavateli, uzavřete na něj subdodavatelskou smlouvu se soupisem h…

3 kroků11 minOtevřít
Obchodní a smlouvy

Žádost o platbu a odsouhlasení

Oceňte práce provedené za toto období oproti smlouvě, podejte žádost o platbu s doklady a od…

3 kroků12 minOtevřít