Případy / Staveniště a terén
Staveniště a terén

Vidět každou terénní značku na jednom listu

Otevřete jeden výkres a uvidíte na něm každou značku, kterou k němu zakázka zaznamenala - špendlíky vad, špendlíky v plánu, poznámky, měření z výkazu výměr a fotografie, každé na svém vlastním přepínači - a poté umístěte špendlík tam, kde je potřeba pozornost.

4 kroků7 minGenerální dodavatelSpecializovaný subdodavatelProjektová / stavební manažerská firma

Jak to funguje, krok za krokem

4 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

Open the sheet

Plánovna

Pick the drawing and the page covering the area you are working, and check the revision indicator beside it before you read anything off the page.

Snímek obrazovky, krok 1: Open the sheet (Plánovna, Vidět každou terénní značku na jednom listu)
Plánovna: Open the sheet

Proč: Marks are recorded against a page, not a project, so being on the right page of the right sheet is the whole basis of what follows. The revision matters too, because a snag raised against revision B can be describing a detail that revision C already deleted.

VstupProject drawing setArea you are workingVýstupOpen sheet pageRevision it is on
2

Turn the layers on and read what is there

Plánovna

Switch the five overlays on and off, punch pins, plan pins, markups, takeoff measurements and photos, and read the count each one carries for this page. Turn the noisy ones off when you want to look at one kind of mark on its own.

Snímek obrazovky, krok 2: Turn the layers on and read what is there (Plánovna, Vidět každou terénní značku na jednom listu)
Plánovna: Turn the layers on and read what is there

Proč: Every trade records into its own tool, so the full picture only exists in somebody's head. Seeing that one stair core carries nine punch pins, two markups and no photos at all tells you in a second what a walk round the building and four separate registers would take an afternoon to say.

VstupOpen sheet pageRecorded field marksVýstupOne composited picturePer-layer count for the page
3

Drop a pin where something needs attention

Plánovna

Click the exact point on the sheet and drop a plan pin there with the note that makes it actionable. If you put one down in the wrong place, open it and remove it, the page is not a document you have to reissue.

Proč: A note that reads crack near the lift lobby sends the next person hunting along forty metres of corridor. A pin sitting on the drawing at the point in question is unambiguous, and it still means the same thing to somebody who was not on the walk with you.

VstupSomething found on siteWhere it is on the sheetVýstupPlan pin on the pageNote the next person can act on
4

Open a pin and act on it

Seznam vad

Click a pin to read its detail on the sheet, then take the ones that need chasing into the punch list, where an item carries a priority, an owner and a status through to closure.

Snímek obrazovky, krok 4: Open a pin and act on it (Seznam vad, Vidět každou terénní značku na jednom listu)
Seznam vad: Open a pin and act on it

Proč: The plan room shows you what has been recorded, it is not where work gets closed out. Marks that never become owned items are exactly the ones still sitting on the drawing at handover, with nobody able to say whether they were ever fixed.

VstupPins read off the sheetTrade responsibleVýstupOwned punch itemsPriority and status
Moduly

Moduly v tomto playbooku

2 / 190 modulů platformy

Více v kategorii Staveniště a terén

Staveniště a terén

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…

4 kroků9 minOtevřít
Staveniště a terén

Answer an RFI

Turn a question from the working face into a tracked request, drive it to the party who own…

3 kroků9 minOtevřít