Cases / Bouwplaats & veld
Bouwplaats & veld

Elke veldmarkering op één blad zien

Open één tekening en zie elke markering die het project erover heeft vastgelegd: opleverpunten, planpunten, markups, takeoffmetingen en foto's, elk met een eigen schakelaar, en plaats een pin waar iets aandacht nodig heeft.

4 stappen7 minHoofdaannemerGespecialiseerde onderaannemerProject- / bouwmanagementbureau

Zo werkt het, stap voor stap

4 stappen door het platform - wat je bij elke stap doet en waarom het ertoe doet.

1

Open the sheet

Plankamer

Pick the drawing and the page covering the area you are working, and check the revision indicator beside it before you read anything off the page.

Schermafbeelding, stap 1: Open the sheet (Plankamer, Elke veldmarkering op één blad zien)
Plankamer: Open the sheet

Waarom: Marks are recorded against a page, not a project, so being on the right page of the right sheet is the whole basis of what follows. The revision matters too, because a snag raised against revision B can be describing a detail that revision C already deleted.

InvoerProject drawing setArea you are workingResultaatOpen sheet pageRevision it is on
2

Turn the layers on and read what is there

Plankamer

Switch the five overlays on and off, punch pins, plan pins, markups, takeoff measurements and photos, and read the count each one carries for this page. Turn the noisy ones off when you want to look at one kind of mark on its own.

Schermafbeelding, stap 2: Turn the layers on and read what is there (Plankamer, Elke veldmarkering op één blad zien)
Plankamer: Turn the layers on and read what is there

Waarom: Every trade records into its own tool, so the full picture only exists in somebody's head. Seeing that one stair core carries nine punch pins, two markups and no photos at all tells you in a second what a walk round the building and four separate registers would take an afternoon to say.

InvoerOpen sheet pageRecorded field marksResultaatOne composited picturePer-layer count for the page
3

Drop a pin where something needs attention

Plankamer

Click the exact point on the sheet and drop a plan pin there with the note that makes it actionable. If you put one down in the wrong place, open it and remove it, the page is not a document you have to reissue.

Waarom: A note that reads crack near the lift lobby sends the next person hunting along forty metres of corridor. A pin sitting on the drawing at the point in question is unambiguous, and it still means the same thing to somebody who was not on the walk with you.

InvoerSomething found on siteWhere it is on the sheetResultaatPlan pin on the pageNote the next person can act on
4

Open a pin and act on it

Opnamelijst

Click a pin to read its detail on the sheet, then take the ones that need chasing into the punch list, where an item carries a priority, an owner and a status through to closure.

Schermafbeelding, stap 4: Open a pin and act on it (Opnamelijst, Elke veldmarkering op één blad zien)
Opnamelijst: Open a pin and act on it

Waarom: The plan room shows you what has been recorded, it is not where work gets closed out. Marks that never become owned items are exactly the ones still sitting on the drawing at handover, with nobody able to say whether they were ever fixed.

InvoerPins read off the sheetTrade responsibleResultaatOwned punch itemsPriority and status
Modules

Modules in dit playbook

2 / 190 platformmodules

Meer in Bouwplaats & veld

Bouwplaats & veld

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…

4 stappen9 minOpenen
Bouwplaats & veld

Answer an RFI

Turn a question from the working face into a tracked request, drive it to the party who own…

3 stappen9 minOpenen