See every field mark on one sheet

Open one drawing and see every mark the project has recorded against it, punch pins, plan pins, markups, takeoff measurements and photos, each on its own toggle, then drop a pin where something needs attention.

4 个步骤7 分钟总承包商专业分包商项目/施工管理公司

运作方式,逐步说明

贯穿平台的 4 个步骤 - 每一步做什么,以及为什么重要。

1

Open the sheet

图纸室

Pick the drawing and the page covering the area you are working, and check the revision indicator beside it before you read anything off the page.

原因: Marks are recorded against a page, not a project, so being on the right page of the right sheet is the whole basis of what follows. The revision matters too, because a snag raised against revision B can be describing a detail that revision C already deleted.

输入Project drawing setArea you are working成果Open sheet pageRevision it is on
2

Turn the layers on and read what is there

图纸室

Switch the five overlays on and off, punch pins, plan pins, markups, takeoff measurements and photos, and read the count each one carries for this page. Turn the noisy ones off when you want to look at one kind of mark on its own.

原因: Every trade records into its own tool, so the full picture only exists in somebody's head. Seeing that one stair core carries nine punch pins, two markups and no photos at all tells you in a second what a walk round the building and four separate registers would take an afternoon to say.

输入Open sheet pageRecorded field marks成果One composited picturePer-layer count for the page
3

Drop a pin where something needs attention

图纸室

Click the exact point on the sheet and drop a plan pin there with the note that makes it actionable. If you put one down in the wrong place, open it and remove it, the page is not a document you have to reissue.

原因: A note that reads crack near the lift lobby sends the next person hunting along forty metres of corridor. A pin sitting on the drawing at the point in question is unambiguous, and it still means the same thing to somebody who was not on the walk with you.

输入Something found on siteWhere it is on the sheet成果Plan pin on the pageNote the next person can act on
4

Open a pin and act on it

整改清单

Click a pin to read its detail on the sheet, then take the ones that need chasing into the punch list, where an item carries a priority, an owner and a status through to closure.

原因: The plan room shows you what has been recorded, it is not where work gets closed out. Marks that never become owned items are exactly the ones still sitting on the drawing at handover, with nobody able to say whether they were ever fixed.

输入Pins read off the sheetTrade responsible成果Owned punch itemsPriority and status
模块

此方案使用的模块

184 个平台模块中的 2

更多 现场与作业 案例

现场与作业

收尾现场一天的工作

妥善收尾一天的工作:记录日志、登记人工和机械工时、上传照片并记录安全观察,让这一天以可依赖的证据形式留存下来。

4 个步骤9 分钟打开
现场与作业

答复一份RFI

将现场提出的问题转化为可跟踪的请求,推动到负责给出答复的一方,并将回复归档,使其成为项目记录的一部分。

3 个步骤9 分钟打开
现场与作业

记录计工计料与时间材料

把已下达指令的额外工作转化为能获得赔付的索赔:施工发生的同时记录人工、机械和材料,当天就取得签认,再依据合同提交。

3 个步骤9 分钟打开