See every field mark on one sheet

Open one drawing and see every mark the project has recorded against it, punch pins, plan pins, markups, takeoff measurements and photos, each on its own toggle, then drop a pin where something needs attention.

4 pasos7 minContratista generalSubcontratista especializadoGestora de proyectos / construcción

Cómo funciona, paso a paso

4 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Open the sheet

Sala de planos

Pick the drawing and the page covering the area you are working, and check the revision indicator beside it before you read anything off the page.

Captura de pantalla, paso 1: Open the sheet (Sala de planos, See every field mark on one sheet)
Sala de planos: Open the sheet

Por que: Marks are recorded against a page, not a project, so being on the right page of the right sheet is the whole basis of what follows. The revision matters too, because a snag raised against revision B can be describing a detail that revision C already deleted.

EntradaProject drawing setArea you are workingResultadoOpen sheet pageRevision it is on
2

Turn the layers on and read what is there

Sala de planos

Switch the five overlays on and off, punch pins, plan pins, markups, takeoff measurements and photos, and read the count each one carries for this page. Turn the noisy ones off when you want to look at one kind of mark on its own.

Captura de pantalla, paso 2: Turn the layers on and read what is there (Sala de planos, See every field mark on one sheet)
Sala de planos: Turn the layers on and read what is there

Por que: Every trade records into its own tool, so the full picture only exists in somebody's head. Seeing that one stair core carries nine punch pins, two markups and no photos at all tells you in a second what a walk round the building and four separate registers would take an afternoon to say.

EntradaOpen sheet pageRecorded field marksResultadoOne composited picturePer-layer count for the page
3

Drop a pin where something needs attention

Sala de planos

Click the exact point on the sheet and drop a plan pin there with the note that makes it actionable. If you put one down in the wrong place, open it and remove it, the page is not a document you have to reissue.

Por que: A note that reads crack near the lift lobby sends the next person hunting along forty metres of corridor. A pin sitting on the drawing at the point in question is unambiguous, and it still means the same thing to somebody who was not on the walk with you.

EntradaSomething found on siteWhere it is on the sheetResultadoPlan pin on the pageNote the next person can act on
4

Open a pin and act on it

Lista de pendientes

Click a pin to read its detail on the sheet, then take the ones that need chasing into the punch list, where an item carries a priority, an owner and a status through to closure.

Captura de pantalla, paso 4: Open a pin and act on it (Lista de pendientes, See every field mark on one sheet)
Lista de pendientes: Open a pin and act on it

Por que: The plan room shows you what has been recorded, it is not where work gets closed out. Marks that never become owned items are exactly the ones still sitting on the drawing at handover, with nobody able to say whether they were ever fixed.

EntradaPins read off the sheetTrade responsibleResultadoOwned punch itemsPriority and status
Módulos

Módulos de este playbook

2 / 190 módulos de la plataforma

Más en Obra y campo

Obra y campo

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…

4 pasos9 minAbrir
Obra y campo

Answer an RFI

Turn a question from the working face into a tracked request, drive it to the party who own…

3 pasos9 minAbrir