Tapaukset / Kustannuslaskenta ja kustannukset
Kustannuslaskenta ja kustannukset

Aseta encargos sociais ja päätä desoneraçãosta

Rakenna jokaisen tehtävän tuntikustannus, valitse palkkarahoitusjärjestelmä koko orçamentolle, rakenna jokainen composição uudelleen sopivalla taulukolla, todista ettei mikään composição jäänyt toiselle, ja tarkista hinnoitellut encargos oikeasti maksettua folhaa vasten.

6 vaihetta16 minPääurakoitsijaErikoisaliurakoitsijaKustannuskonsultointi / määrälaskenta

Näin se toimii, vaihe vaiheelta

6 vaihetta läpi alustan - mitä teet kussakin ja miksi sillä on merkitystä.

1

Build the hourly cost of each function

Työn yksikköhinnat

Enter the wage each function is paid under the collective agreement of the region and the year, and keep the base wage and the encargos as two visible numbers rather than one loaded rate. Do it for the servente and the encarregado as well as for the pedreiro.

Kuvakaappaus, vaihe 1: Build the hourly cost of each function (Työn yksikköhinnat, Aseta encargos sociais ja päätä desoneraçãosta)
Työn yksikköhinnat: Build the hourly cost of each function

Miksi: A loaded rate cannot be re-based when the agreement is renewed or when the payroll regime changes, and both happen inside the life of one estimate. Split, the same change is one figure edited in one place, and the composicoes underneath follow it.

SyöteCollective agreement wage ratesFunctions the work needsTulosHourly labour ratesBase wage separated from the burden
2

Choose the payroll regime for the whole orcamento

Kustannusarvion perusteet

Decide whether this estimate is priced with the contribution on payroll or on turnover, check the edital in case it fixes the answer for you, and record the decision on the basis of estimate together with the encargos percentage it implies. One regime, one percentage, one orcamento.

Miksi: Lei 12.546 of 2011 makes this a company decision with a real effect on the labour cost, and the reference bases publish a separate table for each answer. Recorded once at the top, it becomes a fact everybody working on the estimate can check against. Left implicit, it is rediscovered by whoever opens the file next, and they will assume whichever table they used last.

SyöteCompany turnover and payrollEncargos tables for both regimesTulosRegime recorded for this orcamentoEncargos rate that follows from it
3

Rebuild every composicao on the chosen table

Panosrakenteet

Push the chosen encargos percentage through every composicao that carries labour, including the auxiliares underneath them, and read the change in the total. Do it as one pass rather than as a correction applied to the items somebody happens to open.

Kuvakaappaus, vaihe 3: Rebuild every composicao on the chosen table (Panosrakenteet, Aseta encargos sociais ja päätä desoneraçãosta)
Panosrakenteet: Rebuild every composicao on the chosen table

Miksi: The auxiliares are what get missed, because they are priced early and then behave like insumos. An argamassa still carrying the other table quietly prices the mason inside it under a regime the rest of the estimate has abandoned, and the item above it looks entirely normal.

SyöteEncargos rate that follows from itComposicoes holding labourTulosComposicoes rebuilt on one tableCost analysis of the change
4

Prove nothing was left on the other table

Validointi

Run the orcamento against the recorded regime and list every position whose labour still carries the percentage of the other one. Treat an empty list as the deliverable of this step, not as a formality.

Kuvakaappaus, vaihe 4: Prove nothing was left on the other table (Validointi, Aseta encargos sociais ja päätä desoneraçãosta)
Validointi: Prove nothing was left on the other table

Miksi: This is the one error in the whole estimate that produces no symptom. A mixed orcamento totals cleanly, prints cleanly and reads as internally consistent, and it is discovered either by an analyst comparing your labour cost with the published table or by nobody at all. A machine asking the question line by line is the only reliable reader.

SyöteComposicoes rebuilt on one tableRegime recorded for this orcamentoTulosValidation report on the regimePositions left on the other table
5

Compare the priced burden with the folha you paid

Palkkahallinto

Take a period that has closed and put the encargos you priced next to the encargos the payroll actually paid, split between the contributions, the paid absences and the provisions. Ask which part of the difference is a wrong percentage and which is a job that worked more overtime than it planned.

Miksi: The published table describes an average company, and yours has a real absence rate, a real overtime pattern and a real turnover of labour. The gap is a fact about the company rather than about the job, and it is the same gap on every job until somebody measures it.

SyöteEncargos rate that follows from itPayroll actually paidTulosGap between priced and paidDifference split by cause
6

Feed the difference back into the next estimate

Jälkilaskenta

Close the loop in post-calculation: put the difference beside the hours the site actually booked, decide which part is a permanent correction to your own encargos figure, and change the figure rather than remembering to add a bit next time.

Kuvakaappaus, vaihe 6: Feed the difference back into the next estimate (Jälkilaskenta, Aseta encargos sociais ja päätä desoneraçãosta)
Jälkilaskenta: Feed the difference back into the next estimate

Miksi: A correction that lives in an estimator's head is applied on the jobs they price and nowhere else, and it leaves with them. A corrected rate in the cost database is applied by everybody, and the next comparison measures the correction instead of rediscovering the original gap.

SyöteGap between priced and paidHours booked on siteTulosCorrected rate for the next orcamentoTrend across jobs
Moduulit

Tämän playbookin moduulit

6 / 190 alustan moduulia

The market this case is written for

Brasilia

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Lisää aiheesta Kustannuslaskenta ja kustannukset

Kustannuslaskenta ja kustannukset

Laadi arvio kustannustietokannasta

Hae hinnoitellut nimikkeet aidosta kustannustietokannasta, rakenna luettelo niistä, kokoa to…

4 vaihetta12 minAvaa