Cases / Kalkulation og omkostninger
Kalkulation og omkostninger

Fastsæt encargos sociais og afgør desoneração

Byg timeprisen for hver funktion, vælg lønordningen for hele orçamento, genopbyg hver composição på den tabel der passer, bevis at ingen composição blev efterladt på den anden, og kontrollér de prissatte encargos mod den folha du faktisk betalte.

6 trin16 minHovedentreprenørFagentreprenørOmkostnings- / mængderådgivning

Sådan fungerer det, trin for trin

6 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Build the hourly cost of each function

Lønsatser

Enter the wage each function is paid under the collective agreement of the region and the year, and keep the base wage and the encargos as two visible numbers rather than one loaded rate. Do it for the servente and the encarregado as well as for the pedreiro.

Skærmbillede, trin 1: Build the hourly cost of each function (Lønsatser, Fastsæt encargos sociais og afgør desoneração)
Lønsatser: Build the hourly cost of each function

Hvorfor: A loaded rate cannot be re-based when the agreement is renewed or when the payroll regime changes, and both happen inside the life of one estimate. Split, the same change is one figure edited in one place, and the composicoes underneath follow it.

InputCollective agreement wage ratesFunctions the work needsResultatHourly labour ratesBase wage separated from the burden
2

Choose the payroll regime for the whole orcamento

Overslagsgrundlag

Decide whether this estimate is priced with the contribution on payroll or on turnover, check the edital in case it fixes the answer for you, and record the decision on the basis of estimate together with the encargos percentage it implies. One regime, one percentage, one orcamento.

Hvorfor: Lei 12.546 of 2011 makes this a company decision with a real effect on the labour cost, and the reference bases publish a separate table for each answer. Recorded once at the top, it becomes a fact everybody working on the estimate can check against. Left implicit, it is rediscovered by whoever opens the file next, and they will assume whichever table they used last.

InputCompany turnover and payrollEncargos tables for both regimesResultatRegime recorded for this orcamentoEncargos rate that follows from it
3

Rebuild every composicao on the chosen table

Sammensatte poster

Push the chosen encargos percentage through every composicao that carries labour, including the auxiliares underneath them, and read the change in the total. Do it as one pass rather than as a correction applied to the items somebody happens to open.

Skærmbillede, trin 3: Rebuild every composicao on the chosen table (Sammensatte poster, Fastsæt encargos sociais og afgør desoneração)
Sammensatte poster: Rebuild every composicao on the chosen table

Hvorfor: The auxiliares are what get missed, because they are priced early and then behave like insumos. An argamassa still carrying the other table quietly prices the mason inside it under a regime the rest of the estimate has abandoned, and the item above it looks entirely normal.

InputEncargos rate that follows from itComposicoes holding labourResultatComposicoes rebuilt on one tableCost analysis of the change
4

Prove nothing was left on the other table

Validering

Run the orcamento against the recorded regime and list every position whose labour still carries the percentage of the other one. Treat an empty list as the deliverable of this step, not as a formality.

Skærmbillede, trin 4: Prove nothing was left on the other table (Validering, Fastsæt encargos sociais og afgør desoneração)
Validering: Prove nothing was left on the other table

Hvorfor: This is the one error in the whole estimate that produces no symptom. A mixed orcamento totals cleanly, prints cleanly and reads as internally consistent, and it is discovered either by an analyst comparing your labour cost with the published table or by nobody at all. A machine asking the question line by line is the only reliable reader.

InputComposicoes rebuilt on one tableRegime recorded for this orcamentoResultatValidation report on the regimePositions left on the other table
5

Compare the priced burden with the folha you paid

Løn

Take a period that has closed and put the encargos you priced next to the encargos the payroll actually paid, split between the contributions, the paid absences and the provisions. Ask which part of the difference is a wrong percentage and which is a job that worked more overtime than it planned.

Hvorfor: The published table describes an average company, and yours has a real absence rate, a real overtime pattern and a real turnover of labour. The gap is a fact about the company rather than about the job, and it is the same gap on every job until somebody measures it.

InputEncargos rate that follows from itPayroll actually paidResultatGap between priced and paidDifference split by cause
6

Feed the difference back into the next estimate

Efterkalkulation

Close the loop in post-calculation: put the difference beside the hours the site actually booked, decide which part is a permanent correction to your own encargos figure, and change the figure rather than remembering to add a bit next time.

Skærmbillede, trin 6: Feed the difference back into the next estimate (Efterkalkulation, Fastsæt encargos sociais og afgør desoneração)
Efterkalkulation: Feed the difference back into the next estimate

Hvorfor: A correction that lives in an estimator's head is applied on the jobs they price and nowhere else, and it leaves with them. A corrected rate in the cost database is applied by everybody, and the next comparison measures the correction instead of rediscovering the original gap.

InputGap between priced and paidHours booked on siteResultatCorrected rate for the next orcamentoTrend across jobs
Moduler

Moduler i denne playbook

6 / 190 platformmoduler

The market this case is written for

Brasilien

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mere inden for Kalkulation og omkostninger

Kalkulation og omkostninger

Kalkuler ud fra en prisdatabase

Træk prissatte poster fra en rigtig prisdatabase, byg tilbudslisten op af dem, bundt tilbage…

4 trin12 minÅbn