Panatilihin ang e-építési napló bilang tunay na legal na talaan

Ipabukas ang napló bago may pumasok sa site, isulat ang araw habang nangyayari ito, ikabit ang alnapló ng bawat kontratista sa főnapló, itala ang pagsukat at ang mga gawaing matatakpan habang nagaganap ang mga ito, at isara ang talaan para mabasa pa ito makalipas ang mga taon.

7 hakbang13 minGeneral ContractorEspesyalistang SubcontractorProject / Construction Management Firm

Paano ito gumagana, hakbang-hakbang

7 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Have the naplo open before the site is handed over

Mobilisasyon ng Site

Before mobilisation, confirm that the epitteto has put the naplo and the first fonaplo into readiness, that the contractor has accepted the site handover through it, and that the handover is entered as an event. Record the same milestone on the project so the site does not start on somebody's assurance that it is done.

Bakit: The Epkiv. lets the work begin only once that entry exists, so a crew that starts a week early is not ahead of programme, it is carrying out construction work outside the record. Building supervision treats that as a defect of the works and not as a filing lapse, and the contractor is the party standing in front of it.

PapasokPermit or notification recordEpitteto and contractorLumalabasNaplo open and acceptedSite handover entered
2

Write the day while the day is happening

Pang-araw-araw na Talaarawan

Record what the site actually did: which crews and which subcontractors were there, what each area got done, the weather and ground conditions, deliveries, visitors, and anything that stopped the work, with the hour it started and who was told.

Screenshot, hakbang 2: Write the day while the day is happening (Pang-araw-araw na Talaarawan, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Pang-araw-araw na Talaarawan: Write the day while the day is happening

Bakit: The naplo is where a Hungarian dispute is decided, because it is the one record both sides signed up to in advance. An entry made on the day is evidence; the same words typed in November are a claim about what somebody remembers, and the other side gets to say so. The cost of the discipline is ten minutes a day and the cost of skipping it lands all at once.

PapasokCrews and plant on siteWeather and conditionsLumalabasDiary entry for the dayEvents logged with their hour
3

Hang every contractor off the fonaplo

Direktoryo ng mga Sub-kontraktor

Keep the register of who is working under whom in step with the naplo: each contractor in the chain keeps its own alnaplo under the fonaplo above it, and a firm that turns up on site without one is a firm working outside the record.

Screenshot, hakbang 3: Hang every contractor off the fonaplo (Direktoryo ng mga Sub-kontraktor, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Direktoryo ng mga Sub-kontraktor: Hang every contractor off the fonaplo

Bakit: The chain of alnaplok is how an inspection reads a site, and it is also how a payment chain is reconstructed when somebody in the middle stops paying. A subcontractor with no alnaplo has no record of its own work on the job it is owed for, which is a much larger problem for them than the administrative one it looks like on the day.

PapasokSubcontractors on the packageOpen fonaploLumalabasContractor chain on recordAlnaplo open per contractor
4

Record the measurement where the money will look for it

Progreso

Where the contract settles on measured quantities, record the measurement tetel by tetel as the work is done, and keep it agreed with the muszaki ellenor rather than presented to them at the end of the month. The felmeresi naplo is the sub-log this belongs in, and the valuation should be readable straight out of it.

Screenshot, hakbang 4: Record the measurement where the money will look for it (Progreso, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Progreso: Record the measurement where the money will look for it

Bakit: Measurement agreed while the work is visible takes minutes and measurement argued after it is buried takes a meeting, sometimes a survey, and occasionally a court. It is also the difference between a valuation the certifier can approve line by line and one they can only accept or refuse whole.

PapasokWork executed this periodTetel and contract quantityLumalabasMeasured quantities per tetelBasis for the valuation
5

Inspect the concealed work before it is concealed

Mga Inspeksyon

Before reinforcement is poured over, insulation is boarded, or a service run is buried, call the inspection, photograph the work as built, record the result and only then release the cover. Keep the notice, the inspection and the photographs on the same record.

Screenshot, hakbang 5: Inspect the concealed work before it is concealed (Mga Inspeksyon, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Mga Inspeksyon: Inspect the concealed work before it is concealed

Bakit: The Epkiv. puts the checking of eltakart szerkezetek on the felelos muszaki vezeto, and once the work is covered the record is the only thing anybody can look at. A dispute about concealed work is decided on the entry and the photograph, and opening it up again to find out is a cost somebody pays whether or not they were wrong.

PapasokStructure about to be coveredNotice to the muszaki ellenorLumalabasInspection record with photosRelease to cover
6

Keep the muszaki ellenor inside the record

Superbisyon sa Site

Route what the supervising engineer has to see through the naplo rather than by message: the inspections, the measurements, the instructions they give and the written notice that a performance is complete. Record the date the notice went in.

Screenshot, hakbang 6: Keep the muszaki ellenor inside the record (Superbisyon sa Site, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Superbisyon sa Site: Keep the muszaki ellenor inside the record

Bakit: The Epkiv. makes a muszaki ellenor mandatory on several kinds of work, public procurement among them, and gives them at most fifteen working days from the contractor's written notice of completion to issue the teljesitesigazolas or refuse it with reasons. That clock only exists if the notice has a date, and the naplo is where the date is beyond argument.

PapasokEntries awaiting the ellenorMuszaki ellenor appointmentLumalabasCountersigned entriesNotice of completion sent
7

Close the record so it can be read later

Mga Dokumento

At the end of the works, pull the diary days, the inspections, the measurements and the photographs into one pack on the project, indexed by date, and hand it to close-out with the rest of the completion documentation.

Screenshot, hakbang 7: Close the record so it can be read later (Mga Dokumento, Panatilihin ang e-építési napló bilang tunay na legal na talaan)
Mga Dokumento: Close the record so it can be read later

Bakit: The people who will need this record are not the people who wrote it. A defect claim arrives years after the site manager has moved on, and the question is always the same: what was done here, when, and who checked it. A pack assembled at the end while everyone is still on the job answers that; a pack assembled from a defect notice does not.

PapasokClosed diary daysInspections and measurementsLumalabasSite record packRecord handed to close-out
Mga Module

Mga Module sa Playbook na Ito

7 / 190 na module ng platform

The market this case is written for

Hungary

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Higit pa sa Site at field

Site at field

Magsagawa ng Site Day

Isara nang maayos ang araw: itala ang diary, i-book ang oras ng labor at plant, i-upload ang…

4 hakbang9 minBukas
Site at field

Sagutin ang isang RFI

Gawing tracked na request ang isang tanong mula sa harapan ng trabaho, itulak ito sa partido…

3 hakbang9 minBukas