תרחישים / אומדן ותמחור
אומדן ותמחור

מדידת bill of quantities לפי NZS 4202

מדדו נטו כמותקן לפי השיטה הסטנדרטית הניו זילנדית, בנו סעיפים מורכבים כך שכל מחיר יחידה נושא מה שהתקן נחשב לכלול, סדרו את כתב הכמויות במקטעי המקצוע שלו יחד עם preliminary and general, שמרו את הפחת במחיר היחידה, בדקו את כתב הכמויות מול הכללים, וכתבו את ה-preambles שמתעדים את השיטה וכל חריגה.

6 שלבים16 דק׳ייעוץ עלויות / כמויותקבלן ראשייזם / לקוח

איך זה עובד, שלב אחר שלב

6 שלבים לאורך הפלטפורמה - מה עושים בכל שלב ולמה זה חשוב.

1

Measure net as fixed in place

כימות כמויות

Take off quantities the way the standard measures them: net as the work is fixed in place, in the unit the rule for that trade names, with the deductions the rule requires and no others. Keep each dimension attached to the drawing and revision it came from so the take-off can be re-read rather than re-done.

למה: Net measurement is what makes two bills comparable, and it is also what makes a bill re-measurable when the design moves. A quantity that already has an allowance baked into it cannot be checked against a drawing by anybody except the person who made it, and that person is usually the one not available when the tender query arrives.

נכנסDrawings and specificationMeasurement rules for the tradeיוצאNet quantities as fixed in placeDimensions traceable to a drawing
2

Build items that carry what the rate includes

מכלולים

Assemble each measured item as the composite the standard describes: the labour, the material, the plant and the incidental work the rule says the rate covers. Where a rule deems something included, put it inside the assembly rather than leaving it as a separate line somebody will price twice.

למה: Nearly every dispute about a bill is a coverage dispute, not a quantity one: two people agreeing on the square metres and disagreeing about whether the rate included the edge trim. Building the coverage into the item makes it visible to the estimator pricing it and to the contractor reading it, which is the only place it can be settled cheaply.

נכנסNet quantities as fixed in placeWhat the rate is deemed to includeיוצאComposite items builtCoverage rules written into the item
3

Arrange the bill the way tenderers will read it

כתב כמויות

Put the measured work into the trade sections the standard uses, and keep preliminary and general as its own section rather than spreading site costs through the trades. Carry provisional and prime cost sums as their own items with what they cover written against them.

למה: A bill is priced by subcontractors who each read one section and ignore the rest, so the structure decides who sees what. Time-related site cost buried in the trades is cost nobody prices as time-related, and it is the first thing to be argued about when the job runs long.

נכנסComposite items builtTrade section structureיוצאBill in its trade sectionsPreliminary and general separated
4

Keep waste in the rate and out of the quantity

מקדמי פחת

Set the waste allowance per material as a factor the rate carries, and let the purchase quantity be derived from it rather than typed into the bill. The measured quantity stays the net one the drawing supports; the quantity ordered from the merchant is a different number for a different purpose.

למה: Waste added to the measured quantity breaks the one property that makes a bill useful, which is that anybody can check it against the drawing. It also double counts the moment a rate that already allows for waste is applied to a quantity that also does, and nobody notices because both numbers look reasonable on their own.

נכנסNet measured quantityMaterial and cutting patternיוצאWaste held in the ratePurchase quantity kept separate
5

Check the bill against the rules it claims to follow

אימות

Run the bill through the checks before it goes out: items with a unit that does not match the rule for their trade, items with no quantity, sections the drawings imply and the bill does not carry, and rates that fall outside a sane band for their unit. Fix what is wrong and record what is deliberate.

למה: A bill goes to several tenderers on the same day, so an error in it is not one error, it is one error multiplied by the number of people pricing it, and every one of them prices around it differently. Half an hour of checking before issue is the cheapest half hour in the whole tender period.

נכנסBill in its trade sectionsRules the bill claims to followיוצאItems that break a ruleBill fit to go out
6

State the method, the drawings and every departure

בסיס האומדן

Record the basis of the bill in one place: that it is measured to NZS 4202, the drawings and revisions it was measured from, the specification it reads with, every departure from the standard and every exclusion and assumption the quantities rest on. Issue it with the bill rather than keeping it in the file.

למה: The standard only does its job when the departures are stated, because a tenderer is entitled to assume the rules were followed everywhere it is silent. A bill issued without its basis puts the risk of every unstated assumption onto whoever priced it, which is the party least able to see it, and that is exactly the claim that comes back nine months later.

נכנסBill fit to go outDepartures from the standardיוצאMethod of measurement statedExclusions and assumptions listed
מודולים

המודולים בתרחיש הזה

6 מתוך 190 מודולי הפלטפורמה

The market this case is written for

ניו זילנד

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • NZS 3910
  • Construction Contracts Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

עוד ב-אומדן ותמחור

אומדן ותמחור

בדיקת אומדן לפני שליחתו

העבירו כתב מתומחר דרך כללי האימות, נקו כל אזהרה ושגיאה, ואז ייצאו דוח נקי שאפשר למסור ישירות…

3 שלבים8 דק׳פתיחה
אומדן ותמחור

אומדן ממאגר עלויות

משכו סעיפים מתומחרים ממאגר עלויות אמיתי, בנו מהם את הכתב, קבצו מבני חישוב חוזרים למכלולים וה…

4 שלבים12 דק׳פתיחה
אומדן ותמחור

קביעת רזרבה מסיכון עלות

הפכו אומדן חד-נקודתי לטווח, הריצו סימולציית מונטה קרלו על השורות שבאמת לא ודאיות, קראו את הפ…

3 שלבים11 דק׳פתיחה