Casos / Orçamentação e custos
Orçamentação e custos

Meça um bill of quantities pela NZS 4202

Meça líquido como fixado em obra segundo o método normalizado neozelandês, construa itens compostos para que cada taxa carregue o que a norma presume incluído, organize o mapa nas suas secções de especialidade com preliminary and general, mantenha o desperdício na taxa, verifique o mapa contra as regras e escreva os preambles que registam o método e cada desvio dele.

6 etapas16 minConsultoria de custos / QSEmpreiteiro geralPromotor / cliente

Como funciona, passo a passo

6 passos ao longo da plataforma - o que fazer em cada um e por que importa.

1

Measure net as fixed in place

Levantamento de quantitativos

Take off quantities the way the standard measures them: net as the work is fixed in place, in the unit the rule for that trade names, with the deductions the rule requires and no others. Keep each dimension attached to the drawing and revision it came from so the take-off can be re-read rather than re-done.

Por quê: Net measurement is what makes two bills comparable, and it is also what makes a bill re-measurable when the design moves. A quantity that already has an allowance baked into it cannot be checked against a drawing by anybody except the person who made it, and that person is usually the one not available when the tender query arrives.

EntradaDrawings and specificationMeasurement rules for the tradeResultadoNet quantities as fixed in placeDimensions traceable to a drawing
2

Build items that carry what the rate includes

Composições

Assemble each measured item as the composite the standard describes: the labour, the material, the plant and the incidental work the rule says the rate covers. Where a rule deems something included, put it inside the assembly rather than leaving it as a separate line somebody will price twice.

Por quê: Nearly every dispute about a bill is a coverage dispute, not a quantity one: two people agreeing on the square metres and disagreeing about whether the rate included the edge trim. Building the coverage into the item makes it visible to the estimator pricing it and to the contractor reading it, which is the only place it can be settled cheaply.

EntradaNet quantities as fixed in placeWhat the rate is deemed to includeResultadoComposite items builtCoverage rules written into the item
3

Arrange the bill the way tenderers will read it

Planilha Orçamentária

Put the measured work into the trade sections the standard uses, and keep preliminary and general as its own section rather than spreading site costs through the trades. Carry provisional and prime cost sums as their own items with what they cover written against them.

Por quê: A bill is priced by subcontractors who each read one section and ignore the rest, so the structure decides who sees what. Time-related site cost buried in the trades is cost nobody prices as time-related, and it is the first thing to be argued about when the job runs long.

EntradaComposite items builtTrade section structureResultadoBill in its trade sectionsPreliminary and general separated
4

Keep waste in the rate and out of the quantity

Fatores de desperdício

Set the waste allowance per material as a factor the rate carries, and let the purchase quantity be derived from it rather than typed into the bill. The measured quantity stays the net one the drawing supports; the quantity ordered from the merchant is a different number for a different purpose.

Por quê: Waste added to the measured quantity breaks the one property that makes a bill useful, which is that anybody can check it against the drawing. It also double counts the moment a rate that already allows for waste is applied to a quantity that also does, and nobody notices because both numbers look reasonable on their own.

EntradaNet measured quantityMaterial and cutting patternResultadoWaste held in the ratePurchase quantity kept separate
5

Check the bill against the rules it claims to follow

Validação

Run the bill through the checks before it goes out: items with a unit that does not match the rule for their trade, items with no quantity, sections the drawings imply and the bill does not carry, and rates that fall outside a sane band for their unit. Fix what is wrong and record what is deliberate.

Por quê: A bill goes to several tenderers on the same day, so an error in it is not one error, it is one error multiplied by the number of people pricing it, and every one of them prices around it differently. Half an hour of checking before issue is the cheapest half hour in the whole tender period.

EntradaBill in its trade sectionsRules the bill claims to followResultadoItems that break a ruleBill fit to go out
6

State the method, the drawings and every departure

Base da estimativa

Record the basis of the bill in one place: that it is measured to NZS 4202, the drawings and revisions it was measured from, the specification it reads with, every departure from the standard and every exclusion and assumption the quantities rest on. Issue it with the bill rather than keeping it in the file.

Por quê: The standard only does its job when the departures are stated, because a tenderer is entitled to assume the rules were followed everywhere it is silent. A bill issued without its basis puts the risk of every unstated assumption onto whoever priced it, which is the party least able to see it, and that is exactly the claim that comes back nine months later.

EntradaBill fit to go outDepartures from the standardResultadoMethod of measurement statedExclusions and assumptions listed
Módulos

Módulos deste playbook

6 / 190 módulos da plataforma

O mercado para o qual este caso foi escrito

Nova Zelândia

Tudo neste caso segue a forma como a obra é medida, orçada e paga neste mercado. Os documentos, a decomposição de custos e as regras de pagamento são os que se usam lá, não uma versão genérica.

Normas que ele segue

  • NZS 3910
  • Construction Contracts Act

Você não precisa configurar nada disso na mão. Na primeira vez que abre a plataforma, ela pergunta em que mercado você trabalha. Escolha este e ela ajusta o idioma da interface, carrega a base de custos correspondente, registra a classificação de custos e adiciona um projeto de exemplo que você pode abrir na hora.

As verificações deste mercado também vêm com a plataforma. Ative uma vez e um orçamento ao qual falte algo que o mercado espera é sinalizado enquanto você trabalha nele, e não depois que a proposta já saiu.

Mais em Orçamentação e custos