केस / आकलन और लागत
आकलन और लागत

composição de custo unitário própria बनाएं

insumos की क़ीमत एक बार तय करें, वे coeficientes तय करें जिनका आप बचाव कर सकें, उनके नीचे composições auxiliares बनाएं, उनसे servico बनाएं और यूनिट लागत को टाइप करने के बजाय गणना होने दें, हर गुणांक के स्रोत को दर्ज करते हुए।

7 चरण20 मिनटलागत परामर्श / QS फर्ममुख्य ठेकेदारविशेषज्ञ उपठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 7 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Price the insumos once

संसाधन कैटलॉग

Put the mao de obra, the materiais and the equipamentos into the catalog as priced insumos, each in the unit it is bought or paid in and each typed as labour, material or plant. An hour of pedreiro, a tonne of cimento, a productive hour of retroescavadeira.

स्क्रीनशॉट, चरण 1: Price the insumos once (संसाधन कैटलॉग, composição de custo unitário própria बनाएं)
संसाधन कैटलॉग: Price the insumos once

क्यों: Every composicao you write will lean on the same few dozen insumos. Priced once, a change in the steel price moves every composicao that contains steel in a single edit. Priced inside each composicao, the same change is a search through four hundred lines and some of them will be missed.

इनपुटSupplier quotes and labour costsUnits of measureपरिणामPriced insumo ratesLabour, material and plant separated
2

Set the coeficientes you can defend

उत्पादन मानदंड

Decide how much of each insumo one unit of the servico consumes, and take the figure from a measured period on a real job wherever you have one. Where you do not, take it from a published productivity study and say which. Keep the loss and reuse factors separate from the productivity itself.

क्यों: The coefficient is what the disagreement is actually about, and it is the only part of the composicao that a reader can test against their own experience. Written down with its source it becomes a conversation about how the work is done. Left implicit inside a unit cost, the same disagreement arrives as an accusation that the price is inflated, and there is nothing to point at.

इनपुटSite records of work donePublished productivity ratesपरिणामCoeficientes per unit of workSource recorded per coefficient
3

Build the composicoes auxiliares first

संयुक्त दर विश्लेषण

Anything produced on site before it goes into the work is an auxiliar: the argamassa, the concreto feito em obra, the forma you assemble and use several times. Build each as its own assembly, in its own unit, from the insumos you have just priced.

स्क्रीनशॉट, चरण 3: Build the composicoes auxiliares first (संयुक्त दर विश्लेषण, composição de custo unitário própria बनाएं)
संयुक्त दर विश्लेषण: Build the composicoes auxiliares first

क्यों: The argamassa turns up in the alvenaria, the reboco and the piso, and it is one mix. Modelled once as an auxiliar it stays one number in three composicoes. Retyped into each of them it becomes three numbers that drift apart the first time the sand price moves, and nobody can tell which of the three is the stale one.

इनपुटPriced insumo ratesMix quantities per unitपरिणामComposicao auxiliar with a calculated rateOne rate shared by every user
4

Compose the servico at the stated coeficientes

संयुक्त दर विश्लेषण

Build the servico as an assembly in the unit the bill measures it in, and give every component the quantity one unit of work consumes. Keep the equipment split between productive and idle hours where the machine waits on the crew, because the two are paid differently and averaging them hides both.

स्क्रीनशॉट, चरण 4: Compose the servico at the stated coeficientes (संयुक्त दर विश्लेषण, composição de custo unitário própria बनाएं)
संयुक्त दर विश्लेषण: Compose the servico at the stated coeficientes

क्यों: A unit cost that is the total of its components can be checked line by line by somebody who disagrees with only one of them. A unit cost typed in as a single figure has to be accepted or rejected whole, and in public work that means rejected, because there is nothing in it an analyst is able to approve.

इनपुटComposicoes auxiliares pricedCoeficientes per unit of workपरिणामComposicao with a built-up rateReadable priced breakdown
5

Put the calculated cost on the bill

मात्रा विवरण

Apply the composicao to its position so the unit cost on the bill is the total of the breakdown rather than a number somebody keyed in. Do the same for the positions that share the recipe and differ only in thickness, diameter or class.

स्क्रीनशॉट, चरण 5: Put the calculated cost on the bill (मात्रा विवरण, composição de custo unitário própria बनाएं)
मात्रा विवरण: Put the calculated cost on the bill

क्यों: A typed cost and its composicao stop agreeing the moment either one changes, and the bill is the copy everybody reads. Linked, the orcamento you submit and the calculation you defend are the same arithmetic, which is the entire reason for writing the composicao in the first place.

इनपुटComposicao and its calculated rateBill positions to priceपरिणामPriced bill positionsRate linked to its breakdown
6

Write down why this composicao exists at all

अनुमान का आधार

For each composicao propria record two things on the basis of estimate: that the reference systems carry no equivalent item, and where each coefficient and each insumo price came from. Name the job or the study, not the person.

क्यों: Decreto 7.983 of 2013 permits a composicao propria where the reference systems fall short, and the permission is only as strong as the evidence that they do. Without that sentence the composicao reads as a way around the median rather than as an answer to a real gap, and it is the reading, not the arithmetic, that decides the finding.

इनपुटSource recorded per coefficientReason the base carries no itemपरिणामJustification report per composicaoTrail an auditor can follow
7

Keep it as your own banco de composicoes

लागत डेटाबेस

Move the composicoes you are happy with into the cost database under codes you can search, with the reference month they were priced in. The next orcamento starts from these instead of from a published base you correct in the same three places every time.

स्क्रीनशॉट, चरण 7: Keep it as your own banco de composicoes (लागत डेटाबेस, composição de custo unitário própria बनाएं)
लागत डेटाबेस: Keep it as your own banco de composicoes

क्यों: A published base is a good place to start and a poor place to finish: its coeficientes are regional averages and its prices belong to a month that has passed. The version your own jobs have corrected is worth more than either, and it only accumulates if somebody puts it somewhere other than the last project folder.

इनपुटFinished composicoesपरिणामYour own cost databaseRates ready for the next orcamento
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 6 मॉड्यूल

The market this case is written for

ब्राज़ील

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

आकलन और लागत में और देखें