케이스 / 적산 및 원가
적산 및 원가

composição de custo unitário própria 구성하기

insumos에 한 번만 가격을 매기고, 방어할 수 있는 coeficientes를 정하고, 그 아래 composições auxiliares를 구성하고, 그로부터 servico를 구성하며 단가는 입력하는 것이 아니라 계산되게 하고, 각 계수의 출처를 기록으로 남긴다.

7단계20 분원가 컨설팅 / 적산 업체종합건설사전문건설사

작동 방식, 단계별로

플랫폼 전반에 걸친 7단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Price the insumos once

자원 카탈로그

Put the mao de obra, the materiais and the equipamentos into the catalog as priced insumos, each in the unit it is bought or paid in and each typed as labour, material or plant. An hour of pedreiro, a tonne of cimento, a productive hour of retroescavadeira.

스크린샷, 1단계: Price the insumos once (자원 카탈로그, composição de custo unitário própria 구성하기)
자원 카탈로그: Price the insumos once

이유: Every composicao you write will lean on the same few dozen insumos. Priced once, a change in the steel price moves every composicao that contains steel in a single edit. Priced inside each composicao, the same change is a search through four hundred lines and some of them will be missed.

입력Supplier quotes and labour costsUnits of measure결과Priced insumo ratesLabour, material and plant separated
2

Set the coeficientes you can defend

품셈

Decide how much of each insumo one unit of the servico consumes, and take the figure from a measured period on a real job wherever you have one. Where you do not, take it from a published productivity study and say which. Keep the loss and reuse factors separate from the productivity itself.

이유: The coefficient is what the disagreement is actually about, and it is the only part of the composicao that a reader can test against their own experience. Written down with its source it becomes a conversation about how the work is done. Left implicit inside a unit cost, the same disagreement arrives as an accusation that the price is inflated, and there is nothing to point at.

입력Site records of work donePublished productivity rates결과Coeficientes per unit of workSource recorded per coefficient
3

Build the composicoes auxiliares first

일위대가

Anything produced on site before it goes into the work is an auxiliar: the argamassa, the concreto feito em obra, the forma you assemble and use several times. Build each as its own assembly, in its own unit, from the insumos you have just priced.

스크린샷, 3단계: Build the composicoes auxiliares first (일위대가, composição de custo unitário própria 구성하기)
일위대가: Build the composicoes auxiliares first

이유: The argamassa turns up in the alvenaria, the reboco and the piso, and it is one mix. Modelled once as an auxiliar it stays one number in three composicoes. Retyped into each of them it becomes three numbers that drift apart the first time the sand price moves, and nobody can tell which of the three is the stale one.

입력Priced insumo ratesMix quantities per unit결과Composicao auxiliar with a calculated rateOne rate shared by every user
4

Compose the servico at the stated coeficientes

일위대가

Build the servico as an assembly in the unit the bill measures it in, and give every component the quantity one unit of work consumes. Keep the equipment split between productive and idle hours where the machine waits on the crew, because the two are paid differently and averaging them hides both.

스크린샷, 4단계: Compose the servico at the stated coeficientes (일위대가, composição de custo unitário própria 구성하기)
일위대가: Compose the servico at the stated coeficientes

이유: A unit cost that is the total of its components can be checked line by line by somebody who disagrees with only one of them. A unit cost typed in as a single figure has to be accepted or rejected whole, and in public work that means rejected, because there is nothing in it an analyst is able to approve.

입력Composicoes auxiliares pricedCoeficientes per unit of work결과Composicao with a built-up rateReadable priced breakdown
5

Put the calculated cost on the bill

내역서

Apply the composicao to its position so the unit cost on the bill is the total of the breakdown rather than a number somebody keyed in. Do the same for the positions that share the recipe and differ only in thickness, diameter or class.

스크린샷, 5단계: Put the calculated cost on the bill (내역서, composição de custo unitário própria 구성하기)
내역서: Put the calculated cost on the bill

이유: A typed cost and its composicao stop agreeing the moment either one changes, and the bill is the copy everybody reads. Linked, the orcamento you submit and the calculation you defend are the same arithmetic, which is the entire reason for writing the composicao in the first place.

입력Composicao and its calculated rateBill positions to price결과Priced bill positionsRate linked to its breakdown
6

Write down why this composicao exists at all

견적 근거

For each composicao propria record two things on the basis of estimate: that the reference systems carry no equivalent item, and where each coefficient and each insumo price came from. Name the job or the study, not the person.

이유: Decreto 7.983 of 2013 permits a composicao propria where the reference systems fall short, and the permission is only as strong as the evidence that they do. Without that sentence the composicao reads as a way around the median rather than as an answer to a real gap, and it is the reading, not the arithmetic, that decides the finding.

입력Source recorded per coefficientReason the base carries no item결과Justification report per composicaoTrail an auditor can follow
7

Keep it as your own banco de composicoes

단가 데이터베이스

Move the composicoes you are happy with into the cost database under codes you can search, with the reference month they were priced in. The next orcamento starts from these instead of from a published base you correct in the same three places every time.

스크린샷, 7단계: Keep it as your own banco de composicoes (단가 데이터베이스, composição de custo unitário própria 구성하기)
단가 데이터베이스: Keep it as your own banco de composicoes

이유: A published base is a good place to start and a poor place to finish: its coeficientes are regional averages and its prices belong to a month that has passed. The version your own jobs have corrected is worth more than either, and it only accumulates if somebody puts it somewhere other than the last project folder.

입력Finished composicoes결과Your own cost databaseRates ready for the next orcamento
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 6개

The market this case is written for

브라질

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

적산 및 원가 카테고리의 더 보기

적산 및 원가

발송 전 견적 점검

산출된 내역서를 검증 규칙에 통과시켜 모든 경고와 오류를 해결한 뒤, 발주자에게 바로 전달할 수 있는 깨끗한 보고서를 내보냅니다.

3단계8 분열기
적산 및 원가

원가 데이터베이스로 견적 산정하기

실제 원가 데이터베이스에서 가격 항목을 가져와 내역서를 작성하고, 반복되는 조합을 어셈블리로 묶은 뒤, 입찰 금액을 확정하기 전에 검토를 실행합니다.

4단계12 분열기
적산 및 원가

비용 리스크로 예비비 산정하기

단일 값 견적을 범위로 바꾸고, 실제로 불확실한 항목에 대해 몬테카를로 시뮬레이션을 실행하여 P50~P90 분포를 읽고, 항목별로 근거를 설명할 수 있는 예비비를 설…

3단계11 분열기