ケース / 積算とコスト
積算とコスト

composição de custo unitário própria を組み立てる

insumos に一度だけ価格をつけ、擁護できる coeficientes を定め、その下に composições auxiliares を組み立て、そこから servico を構成し、単価は入力するのではなく計算させ、各係数の出所を記録に残す。

7ステップ20 分コストコンサルティング会社 / 積算事務所総合建設会社専門工事業者

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Price the insumos once

リソースカタログ

Put the mao de obra, the materiais and the equipamentos into the catalog as priced insumos, each in the unit it is bought or paid in and each typed as labour, material or plant. An hour of pedreiro, a tonne of cimento, a productive hour of retroescavadeira.

スクリーンショット、ステップ 1: Price the insumos once (リソースカタログ, composição de custo unitário própria を組み立てる)
リソースカタログ: Price the insumos once

理由: Every composicao you write will lean on the same few dozen insumos. Priced once, a change in the steel price moves every composicao that contains steel in a single edit. Priced inside each composicao, the same change is a search through four hundred lines and some of them will be missed.

入力Supplier quotes and labour costsUnits of measure出力Priced insumo ratesLabour, material and plant separated
2

Set the coeficientes you can defend

歩掛

Decide how much of each insumo one unit of the servico consumes, and take the figure from a measured period on a real job wherever you have one. Where you do not, take it from a published productivity study and say which. Keep the loss and reuse factors separate from the productivity itself.

理由: The coefficient is what the disagreement is actually about, and it is the only part of the composicao that a reader can test against their own experience. Written down with its source it becomes a conversation about how the work is done. Left implicit inside a unit cost, the same disagreement arrives as an accusation that the price is inflated, and there is nothing to point at.

入力Site records of work donePublished productivity rates出力Coeficientes per unit of workSource recorded per coefficient
3

Build the composicoes auxiliares first

複合単価

Anything produced on site before it goes into the work is an auxiliar: the argamassa, the concreto feito em obra, the forma you assemble and use several times. Build each as its own assembly, in its own unit, from the insumos you have just priced.

スクリーンショット、ステップ 3: Build the composicoes auxiliares first (複合単価, composição de custo unitário própria を組み立てる)
複合単価: Build the composicoes auxiliares first

理由: The argamassa turns up in the alvenaria, the reboco and the piso, and it is one mix. Modelled once as an auxiliar it stays one number in three composicoes. Retyped into each of them it becomes three numbers that drift apart the first time the sand price moves, and nobody can tell which of the three is the stale one.

入力Priced insumo ratesMix quantities per unit出力Composicao auxiliar with a calculated rateOne rate shared by every user
4

Compose the servico at the stated coeficientes

複合単価

Build the servico as an assembly in the unit the bill measures it in, and give every component the quantity one unit of work consumes. Keep the equipment split between productive and idle hours where the machine waits on the crew, because the two are paid differently and averaging them hides both.

スクリーンショット、ステップ 4: Compose the servico at the stated coeficientes (複合単価, composição de custo unitário própria を組み立てる)
複合単価: Compose the servico at the stated coeficientes

理由: A unit cost that is the total of its components can be checked line by line by somebody who disagrees with only one of them. A unit cost typed in as a single figure has to be accepted or rejected whole, and in public work that means rejected, because there is nothing in it an analyst is able to approve.

入力Composicoes auxiliares pricedCoeficientes per unit of work出力Composicao with a built-up rateReadable priced breakdown
5

Put the calculated cost on the bill

内訳書

Apply the composicao to its position so the unit cost on the bill is the total of the breakdown rather than a number somebody keyed in. Do the same for the positions that share the recipe and differ only in thickness, diameter or class.

スクリーンショット、ステップ 5: Put the calculated cost on the bill (内訳書, composição de custo unitário própria を組み立てる)
内訳書: Put the calculated cost on the bill

理由: A typed cost and its composicao stop agreeing the moment either one changes, and the bill is the copy everybody reads. Linked, the orcamento you submit and the calculation you defend are the same arithmetic, which is the entire reason for writing the composicao in the first place.

入力Composicao and its calculated rateBill positions to price出力Priced bill positionsRate linked to its breakdown
6

Write down why this composicao exists at all

見積根拠

For each composicao propria record two things on the basis of estimate: that the reference systems carry no equivalent item, and where each coefficient and each insumo price came from. Name the job or the study, not the person.

理由: Decreto 7.983 of 2013 permits a composicao propria where the reference systems fall short, and the permission is only as strong as the evidence that they do. Without that sentence the composicao reads as a way around the median rather than as an answer to a real gap, and it is the reading, not the arithmetic, that decides the finding.

入力Source recorded per coefficientReason the base carries no item出力Justification report per composicaoTrail an auditor can follow
7

Keep it as your own banco de composicoes

単価データベース

Move the composicoes you are happy with into the cost database under codes you can search, with the reference month they were priced in. The next orcamento starts from these instead of from a published base you correct in the same three places every time.

スクリーンショット、ステップ 7: Keep it as your own banco de composicoes (単価データベース, composição de custo unitário própria を組み立てる)
単価データベース: Keep it as your own banco de composicoes

理由: A published base is a good place to start and a poor place to finish: its coeficientes are regional averages and its prices belong to a month that has passed. The version your own jobs have corrected is worth more than either, and it only accumulates if somebody puts it somewhere other than the last project folder.

入力Finished composicoes出力Your own cost databaseRates ready for the next orcamento
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 6 個

The market this case is written for

ブラジル

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

積算とコストの他のケース

積算とコスト

送付前に見積を確認する

積算済みの内訳書を検証ルールにかけ、すべての警告とエラーを解消し、そのまま顧客に渡せるきれいなレポートを出力する。

3ステップ8 分開く
積算とコスト

コストデータベースから見積を作成する

実在のコストデータベースから積算項目を取り出して内訳書を組み立て、繰り返し使う積み上げをアセンブリにまとめ、入札額を確定する前にチェックを実行します。

4ステップ12 分開く
積算とコスト

コストリスクから予備費を設定する

単一値の見積を幅のある値に変え、本当に不確実性のある項目についてモンテカルロシミュレーションを実行し、P50からP90の分布を読み取り、行ごとに根拠を示せる予備費を設定します。

3ステップ11 分開く