케이스 / 적산 및 원가
적산 및 원가

HST, PST, QST를 위한 내역서 하나의 가격 산정

주(州)별로 비용에 대한 판매세가 환급받는 돈인지 부담하는 돈인지 정하고, 부담하는 세금은 단가 안에, 환급받는 세금은 말미에 넣고, 사용한 세율을 그 날짜와 적용 기준과 함께 기록합니다.

5단계18 분종합건설사전문건설사원가 컨설팅 / 적산 업체시행사 / 발주처

작동 방식, 단계별로

플랫폼 전반에 걸친 5단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Decide per province what you recover and what you carry

단가 데이터베이스

For every province the work touches, settle whether the provincial tax on materials is recoverable in your position or a cost you carry, and write the decision down before a single rate is entered.

이유: This one decision moves the tax between two completely different places in the estimate. Getting it wrong does not produce a wrong total, it produces a right total built the wrong way, which passes review cleanly and then fails at the first cost report when the recovery nobody was entitled to does not arrive.

입력Provinces the work touchesYour recovery position결과A written decision per provinceWhat is a cost and what is not
2

Put the tax you carry inside the material rate

자원 카탈로그

Where the provincial tax on materials is a cost you never recover, build it into the material rate in the catalog rather than adding it at the end, and note on the rate that it is tax inclusive so the next reader knows.

이유: A tax you do not get back is simply part of what the material costs you, and every rate built without it understates the job by the tax on your largest cost line. Putting it on the tail instead makes it look recoverable to everybody who reads the estimate after you, including the person who prepares the cost plan.

입력Material ratesThe provincial position for this job결과Rates carrying the tax they costPosition noted on the rate
3

Put the tax you recover on the tail, on the right base

마크업

Add the recoverable tax as a line on the tail at the rate for the province, and where two taxes run in parallel add both of them on the same pre-tax subtotal rather than one on top of the other's result.

이유: Stacking one tax on a figure that already includes the other is a small percentage of the whole contract, which is more than the margin on most of it. The province decides the base as much as it decides the rate, and a build-up showing which base was used is the difference between a client checking your tax in a glance and a client checking it with their accountant.

입력Pre-tax subtotalFederal and provincial rates결과Tax lines on the correct baseA build-up the client can check
4

Record the rate you used and the date it applied from

견적 근거

Write into the basis of estimate the rate used for each province, the date that rate took effect, the authority that publishes it, and which side of the pre-tax line each one was computed on.

이유: Rates move, and a bid priced last quarter was priced under the rate in force then. Nova Scotia went from 15 to 14 percent on 1 April 2025, and an estimate that cannot say which of the two it used cannot be defended in either direction when the question comes up nine months later.

입력Rates applied per provinceEffective dates and sources결과A dated tax basisAn estimate that can be re-priced
5

Show the same bill per province and say what moved

보고서

Report the same scope priced for each province, keeping the tax that sits inside the rates separate from the tax on the tail, so the difference reads as a location rather than as a total.

이유: Three totals tell a client nothing they could not get from a rate table. Showing that the money is inside the rate in one province and on the tail in another is what explains why the same building costs what it costs across a border, and that is the conversation that wins the work rather than the number.

입력The same bill priced per province결과Totals with the tax locatedA difference you can explain
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 5

The market this case is written for

캐나다

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

적산 및 원가 카테고리의 더 보기

적산 및 원가

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4단계12 분열기
적산 및 원가

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3단계11 분열기