Review what the AI read off the drawing

Take what the plan reader proposed on a PDF sheet and decide, proposal by proposal, what deserves to reach the bill. Triage by confidence band, check where each measurement got its scale, then accept only what you can defend.

4단계12 분종합건설사전문건설사원가 컨설팅 / 적산 업체

작동 방식, 단계별로

플랫폼 전반에 걸친 4단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Run the plan read

PDF 물량산출

Open the sheet in Takeoff and run the plan read across it. The model comes back with proposed areas, lengths and counts, each carrying a score and a note of where its scale came from, and none of it has touched the bill yet.

이유: The read is cheap and the acceptance is not. Keeping proposals in a layer you can throw away means a badly scanned sheet costs you a rerun, rather than leaving you with quantities in a bill that you cannot account for a fortnight later.

입력PDF sheetSheet scale결과Measurement proposalsA score on each one
2

Triage by confidence band

PDF 물량산출

Read the review bar before you go anywhere near Accept all. Every proposal sits in a band, high, medium, low or not scored, drawn from the cut points the server publishes. The bar tells you how many are in the low band. Work that band first, one at a time, and either fix it on the drawing or throw it out.

이유: A bare percentage beside a suggestion is not a decision, because nobody can tell you whether sixty-two is good. A band means the same thing to you as it does to the machine that scored it. Accept all over a pile of weak proposals is how a plan read turns into an over-order that nobody notices until the material lands.

입력Measurement proposalsPublished thresholds결과Low-band countProposals cleared to accept
3

Check where the scale came from

PDF 물량산출

Open a measurement and read its scale-from line. It says whether the ratio was calibrated on this sheet, taken from the document scale, inherited from the sheet, read out of the drawing text, recovered by OCR, read off the drawing by the model, or is simply Unknown. Recalibrate anything you would not defend out loud.

이유: A wrong scale never looks wrong. It looks like a plausible number that happens to be out by a factor, and it stays plausible all the way to an order. When a sheet does turn out to have been measured at the wrong ratio, provenance is what lets you pull exactly the rows that inherited the bad ratio instead of remeasuring the whole drawing.

입력A proposed measurementWhere its scale came from결과Verified scale ratioRows on a bad sheet narrowed
4

Accept into the bill

내역서

Push the measurements you have signed off into bill positions and attach rates to them. What arrives in the bill is what you reviewed, in the order you reviewed it, not what the model guessed on the first pass.

이유: The bill is the point of no return, because from here a number goes to a client, a subcontractor or a purchase order. A quantity that got in unreviewed is indistinguishable from one you measured yourself, right up to the moment somebody asks you to prove it.

입력Reviewed measurementsBill positions결과Priced bill linesQuantities traceable to the sheet
모듈

이 플레이북의 모듈

플랫폼 184개 모듈 중 2

적산 및 원가 카테고리의 더 보기

적산 및 원가

발송 전 견적 점검

산출된 내역서를 검증 규칙에 통과시켜 모든 경고와 오류를 해결한 뒤, 발주자에게 바로 전달할 수 있는 깨끗한 보고서를 내보냅니다.

3단계8 분열기
적산 및 원가

원가 데이터베이스로 견적 산정하기

실제 원가 데이터베이스에서 가격 항목을 가져와 내역서를 작성하고, 반복되는 조합을 어셈블리로 묶은 뒤, 입찰 금액을 확정하기 전에 검토를 실행합니다.

4단계12 분열기
적산 및 원가

비용 리스크로 예비비 산정하기

단일 값 견적을 범위로 바꾸고, 실제로 불확실한 항목에 대해 몬테카를로 시뮬레이션을 실행하여 P50~P90 분포를 읽고, 항목별로 근거를 설명할 수 있는 예비비를 설…

3단계11 분열기