Review what the AI read off the drawing

Take what the plan reader proposed on a PDF sheet and decide, proposal by proposal, what deserves to reach the bill. Triage by confidence band, check where each measurement got its scale, then accept only what you can defend.

4 个步骤12 分钟总承包商专业分包商造价咨询 / 工料测量顾问

运作方式,逐步说明

贯穿平台的 4 个步骤 - 每一步做什么,以及为什么重要。

1

Run the plan read

PDF 算量

Open the sheet in Takeoff and run the plan read across it. The model comes back with proposed areas, lengths and counts, each carrying a score and a note of where its scale came from, and none of it has touched the bill yet.

原因: The read is cheap and the acceptance is not. Keeping proposals in a layer you can throw away means a badly scanned sheet costs you a rerun, rather than leaving you with quantities in a bill that you cannot account for a fortnight later.

输入PDF sheetSheet scale成果Measurement proposalsA score on each one
2

Triage by confidence band

PDF 算量

Read the review bar before you go anywhere near Accept all. Every proposal sits in a band, high, medium, low or not scored, drawn from the cut points the server publishes. The bar tells you how many are in the low band. Work that band first, one at a time, and either fix it on the drawing or throw it out.

原因: A bare percentage beside a suggestion is not a decision, because nobody can tell you whether sixty-two is good. A band means the same thing to you as it does to the machine that scored it. Accept all over a pile of weak proposals is how a plan read turns into an over-order that nobody notices until the material lands.

输入Measurement proposalsPublished thresholds成果Low-band countProposals cleared to accept
3

Check where the scale came from

PDF 算量

Open a measurement and read its scale-from line. It says whether the ratio was calibrated on this sheet, taken from the document scale, inherited from the sheet, read out of the drawing text, recovered by OCR, read off the drawing by the model, or is simply Unknown. Recalibrate anything you would not defend out loud.

原因: A wrong scale never looks wrong. It looks like a plausible number that happens to be out by a factor, and it stays plausible all the way to an order. When a sheet does turn out to have been measured at the wrong ratio, provenance is what lets you pull exactly the rows that inherited the bad ratio instead of remeasuring the whole drawing.

输入A proposed measurementWhere its scale came from成果Verified scale ratioRows on a bad sheet narrowed
4

Accept into the bill

工程量清单

Push the measurements you have signed off into bill positions and attach rates to them. What arrives in the bill is what you reviewed, in the order you reviewed it, not what the model guessed on the first pass.

原因: The bill is the point of no return, because from here a number goes to a client, a subcontractor or a purchase order. A quantity that got in unreviewed is indistinguishable from one you measured yourself, right up to the moment somebody asks you to prove it.

输入Reviewed measurementsBill positions成果Priced bill linesQuantities traceable to the sheet
模块

此方案使用的模块

184 个平台模块中的 2

更多 估算与成本 案例

估算与成本

发出估算前进行核查

让已计价的清单通过核查规则,清除所有警告和错误,再导出一份可以直接交给客户的干净报告。

3 个步骤8 分钟打开
估算与成本

根据成本数据库进行估算

从真实的成本数据库中提取已计价项目,据此构建清单,把常用的组合做法打包成组合定额,提交投标数字前先做校核。

4 个步骤12 分钟打开
估算与成本

根据成本风险设定应急费

把单点估算转化为区间估算,对真正存在不确定性的项目运行蒙特卡洛模拟,读取P50到P90的分布区间,设定一个可以逐项说清楚的应急费。

3 个步骤11 分钟打开