Verifică ce a citit AI-ul de pe desen

Preia ce a propus cititorul de planuri pe o foaie PDF și decide, propunere cu propunere, ce merită să ajungă în list. Triază pe bandă de încredere, verifică de unde a preluat fiecare măsurătoare scara ei, apoi acceptă doar ce poți susține.

4 pași12 minAntreprenor generalSubantreprenor specializatConsultanță costuri / QS

Cum funcționează, pas cu pas

4 pași în cadrul platformei - ce faceți la fiecare și de ce contează.

1

Run the plan read

Takeoff

Open the sheet in Takeoff and run the plan read across it. The model comes back with proposed areas, lengths and counts, each carrying a score and a note of where its scale came from, and none of it has touched the bill yet.

De ce: The read is cheap and the acceptance is not. Keeping proposals in a layer you can throw away means a badly scanned sheet costs you a rerun, rather than leaving you with quantities in a bill that you cannot account for a fortnight later.

IntrarePDF sheetSheet scaleRezultatMeasurement proposalsA score on each one
2

Triage by confidence band

Takeoff

Read the review bar before you go anywhere near Accept all. Every proposal sits in a band, high, medium, low or not scored, drawn from the cut points the server publishes. The bar tells you how many are in the low band. Work that band first, one at a time, and either fix it on the drawing or throw it out.

De ce: A bare percentage beside a suggestion is not a decision, because nobody can tell you whether sixty-two is good. A band means the same thing to you as it does to the machine that scored it. Accept all over a pile of weak proposals is how a plan read turns into an over-order that nobody notices until the material lands.

IntrareMeasurement proposalsPublished thresholdsRezultatLow-band countProposals cleared to accept
3

Check where the scale came from

Takeoff

Open a measurement and read its scale-from line. It says whether the ratio was calibrated on this sheet, taken from the document scale, inherited from the sheet, read out of the drawing text, recovered by OCR, read off the drawing by the model, or is simply Unknown. Recalibrate anything you would not defend out loud.

De ce: A wrong scale never looks wrong. It looks like a plausible number that happens to be out by a factor, and it stays plausible all the way to an order. When a sheet does turn out to have been measured at the wrong ratio, provenance is what lets you pull exactly the rows that inherited the bad ratio instead of remeasuring the whole drawing.

IntrareA proposed measurementWhere its scale came fromRezultatVerified scale ratioRows on a bad sheet narrowed
4

Accept into the bill

BOQ

Push the measurements you have signed off into bill positions and attach rates to them. What arrives in the bill is what you reviewed, in the order you reviewed it, not what the model guessed on the first pass.

Captură de ecran, pasul 4: Accept into the bill (BOQ, Verifică ce a citit AI-ul de pe desen)
BOQ: Accept into the bill

De ce: The bill is the point of no return, because from here a number goes to a client, a subcontractor or a purchase order. A quantity that got in unreviewed is indistinguishable from one you measured yourself, right up to the moment somebody asks you to prove it.

IntrareReviewed measurementsBill positionsRezultatPriced bill linesQuantities traceable to the sheet
Module

Modulele acestui playbook

2 / 190 module ale platformei

Mai multe în Estimare și devize

Estimare și devize

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 pași12 minDeschide
Estimare și devize

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 pași11 minDeschide