Check SRO membership before anyone starts work

Write down what each work package legally requires, check the membership and the level of responsibility of every firm you intend to use, make it a condition of award, file the register extract and watch the dates that lapse.

6 алхам11 минЕрөнхий гүйцэтгэгчХөгжүүлэгч / захиалагчТөслийн / барилгын менежментийн компани

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 6 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Say what each discipline on the job actually requires

Эрхийн бүртгэл

For each discipline, record what the firm or the individual doing it must hold: SRO membership in construction, in design or in survey, and any separate authorisation the work itself carries, such as work on a cultural heritage object or on a hazardous production facility. Mark the requirement blocking where a gap has to stop the work, and set the grace period you are willing to allow.

Яагаад: The requirement belongs to the work rather than to the supplier, and writing it down first is what makes every later check mechanical instead of a judgement call. Blocking is the decision that matters, because a requirement that is only a note stops nobody. It also surfaces the work that needs no membership at all, since the Town Planning Code exempts contracts below a stated value and certain categories of work, and demanding it there costs you bidders for nothing.

ОролтDisciplines on the jobFirms or people who hold itҮр дүнBlocking requirement per disciplineWork that needs none
2

Prequalify every firm against its own register extract

Туслан гүйцэтгэгчдийн жагсаалт

For each firm, work through the prequalification questionnaire with the register extract in front of you: which SRO it belongs to, its membership number, when it joined, and which level of responsibility it holds against the value of the work you mean to give it. Attach the extract, and block the firm with the reason written down where the level does not cover that work. Read it from the extract, not from the scan on the firm's letterhead.

Дэлгэцийн зураг, 2-р алхам: Prequalify every firm against its own register extract (Туслан гүйцэтгэгчдийн жагсаалт, Check SRO membership before anyone starts work)
Туслан гүйцэтгэгчдийн жагсаалт: Prequalify every firm against its own register extract

Яагаад: Membership is a live status rather than a certificate: it can be suspended or terminated while the firm goes on sending the same scanned page. The level is the part most often wrong, because a firm that is genuinely a member is very often a member at a level below the contract it is about to sign.

ОролтFirms under considerationRegister extractҮр дүнPrequalification decidedFirms blocked with a reason
3

Make it a condition of award, not a question afterwards

Худалдан авалт

Attach the requirement to the package in procurement so that an award cannot be made to a firm that does not meet it, and ask for the register extract as part of the offer rather than as something to be produced once the work is under way.

Дэлгэцийн зураг, 3-р алхам: Make it a condition of award, not a question afterwards (Худалдан авалт, Check SRO membership before anyone starts work)
Худалдан авалт: Make it a condition of award, not a question afterwards

Яагаад: Checked after award this only ever produces bad options: re-tender and lose the programme, or carry on with a contractor whose work you may not be able to hand over. Checked as a condition of award it costs one field on the offer form.

ОролтRequirement per packageOffers receivedҮр дүнEligible biddersAward blocked without cover
4

Keep the register extract that proves it

Баримт бичиг

File the register extract for each firm together with the date it was taken, alongside the insurance and any separate authorisation, and keep it attached to the work package rather than in a general supplier folder.

Дэлгэцийн зураг, 4-р алхам: Keep the register extract that proves it (Баримт бичиг, Check SRO membership before anyone starts work)
Баримт бичиг: Keep the register extract that proves it

Яагаад: When the client's technical supervision or an inspection asks who was entitled to do this work, the answer has to be a document dated before the work started. An extract pulled after the question is asked proves only that the firm is a member today, which is a much weaker statement and usually the wrong one.

ОролтRegister extract with its dateInsurance and permitsҮр дүнEvidence on the packageProof dated before the work
5

Write the membership into the subcontract as a standing duty

Гэрээ

Put the requirement in the subcontract itself: membership held for the whole term and not only at signature, notice to you within a fixed number of days if it is suspended or terminated, and the right to suspend the work and withhold payment until it is restored.

Дэлгэцийн зураг, 5-р алхам: Write the membership into the subcontract as a standing duty (Гэрээ, Check SRO membership before anyone starts work)
Гэрээ: Write the membership into the subcontract as a standing duty

Яагаад: Membership lapses quietly and the SRO writes to its member, not to you. Checked once at award, it is a snapshot; written into the contract, it is a duty that runs for the whole term and gives you something to act on. A firm that was covered at award and is not covered in month eight goes on signing acts the client can later refuse, and that is normally found while the handover package is being checked.

ОролтFirm cleared for awardSubcontract clause templateҮр дүнMembership as a standing obligationDuty to report a lapse
6

Read who may not work today, and what lapses next

Эрхийн бүртгэл

Read the compliance answer across the project: holders a blocking requirement stops outright, holders still inside their grace period, credentials expiring soon, and requirements that bind nobody at all because no holder on the register matches them. Clear that list before those firms reach the site.

Яагаад: This is the rare compliance question that is arithmetic rather than judgement, so it belongs in a report read on a date and not in somebody's habit. Expiry is worked out from the dates each time it is read rather than from a status somebody typed once, which is the only version of this check that survives a firm renewing late. A requirement binding nobody is the other half of the finding: the work is being done by somebody the requirement never reached.

ОролтEvery firm and person on siteRequirements that bind themҮр дүнWho may not work todayRequirements binding nobody
Модулиуд

Энэ тоглолтын модулиуд

Платформын 190 модулиас 5

The market this case is written for

Орос

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Чанар ба аюулгүй байдал дахь бусад