Vérifier l'adhésion à la SRO avant que quiconque ne commence les travaux

Consignez par écrit ce que chaque lot de travaux exige légalement, vérifiez l'adhésion et le niveau de responsabilité de chaque entreprise que vous comptez employer, faites-en une condition d'attribution, classez l'extrait du registre et surveillez les dates d'expiration.

6 étapes11 minEntreprise généralePromoteur / maître d'ouvrageBureau de gestion de projet / de construction

Comment ça marche, étape par étape

6 étapes à travers la plateforme - ce que vous faites à chacune et pourquoi c’est important.

1

Say what each discipline on the job actually requires

Habilitations

For each discipline, record what the firm or the individual doing it must hold: SRO membership in construction, in design or in survey, and any separate authorisation the work itself carries, such as work on a cultural heritage object or on a hazardous production facility. Mark the requirement blocking where a gap has to stop the work, and set the grace period you are willing to allow.

Pourquoi: The requirement belongs to the work rather than to the supplier, and writing it down first is what makes every later check mechanical instead of a judgement call. Blocking is the decision that matters, because a requirement that is only a note stops nobody. It also surfaces the work that needs no membership at all, since the Town Planning Code exempts contracts below a stated value and certain categories of work, and demanding it there costs you bidders for nothing.

EntréeDisciplines on the jobFirms or people who hold itRésultatBlocking requirement per disciplineWork that needs none
2

Prequalify every firm against its own register extract

Annuaire sous-traitants

For each firm, work through the prequalification questionnaire with the register extract in front of you: which SRO it belongs to, its membership number, when it joined, and which level of responsibility it holds against the value of the work you mean to give it. Attach the extract, and block the firm with the reason written down where the level does not cover that work. Read it from the extract, not from the scan on the firm's letterhead.

Capture d’écran, étape 2 : Prequalify every firm against its own register extract (Annuaire sous-traitants, Vérifier l'adhésion à la SRO avant que quiconque ne commence les travaux)
Annuaire sous-traitants: Prequalify every firm against its own register extract

Pourquoi: Membership is a live status rather than a certificate: it can be suspended or terminated while the firm goes on sending the same scanned page. The level is the part most often wrong, because a firm that is genuinely a member is very often a member at a level below the contract it is about to sign.

EntréeFirms under considerationRegister extractRésultatPrequalification decidedFirms blocked with a reason
3

Make it a condition of award, not a question afterwards

Approvisionnement

Attach the requirement to the package in procurement so that an award cannot be made to a firm that does not meet it, and ask for the register extract as part of the offer rather than as something to be produced once the work is under way.

Capture d’écran, étape 3 : Make it a condition of award, not a question afterwards (Approvisionnement, Vérifier l'adhésion à la SRO avant que quiconque ne commence les travaux)
Approvisionnement: Make it a condition of award, not a question afterwards

Pourquoi: Checked after award this only ever produces bad options: re-tender and lose the programme, or carry on with a contractor whose work you may not be able to hand over. Checked as a condition of award it costs one field on the offer form.

EntréeRequirement per packageOffers receivedRésultatEligible biddersAward blocked without cover
4

Keep the register extract that proves it

Documents

File the register extract for each firm together with the date it was taken, alongside the insurance and any separate authorisation, and keep it attached to the work package rather than in a general supplier folder.

Capture d’écran, étape 4 : Keep the register extract that proves it (Documents, Vérifier l'adhésion à la SRO avant que quiconque ne commence les travaux)
Documents: Keep the register extract that proves it

Pourquoi: When the client's technical supervision or an inspection asks who was entitled to do this work, the answer has to be a document dated before the work started. An extract pulled after the question is asked proves only that the firm is a member today, which is a much weaker statement and usually the wrong one.

EntréeRegister extract with its dateInsurance and permitsRésultatEvidence on the packageProof dated before the work
5

Write the membership into the subcontract as a standing duty

Contrats

Put the requirement in the subcontract itself: membership held for the whole term and not only at signature, notice to you within a fixed number of days if it is suspended or terminated, and the right to suspend the work and withhold payment until it is restored.

Capture d’écran, étape 5 : Write the membership into the subcontract as a standing duty (Contrats, Vérifier l'adhésion à la SRO avant que quiconque ne commence les travaux)
Contrats: Write the membership into the subcontract as a standing duty

Pourquoi: Membership lapses quietly and the SRO writes to its member, not to you. Checked once at award, it is a snapshot; written into the contract, it is a duty that runs for the whole term and gives you something to act on. A firm that was covered at award and is not covered in month eight goes on signing acts the client can later refuse, and that is normally found while the handover package is being checked.

EntréeFirm cleared for awardSubcontract clause templateRésultatMembership as a standing obligationDuty to report a lapse
6

Read who may not work today, and what lapses next

Habilitations

Read the compliance answer across the project: holders a blocking requirement stops outright, holders still inside their grace period, credentials expiring soon, and requirements that bind nobody at all because no holder on the register matches them. Clear that list before those firms reach the site.

Pourquoi: This is the rare compliance question that is arithmetic rather than judgement, so it belongs in a report read on a date and not in somebody's habit. Expiry is worked out from the dates each time it is read rather than from a status somebody typed once, which is the only version of this check that survives a firm renewing late. A requirement binding nobody is the other half of the finding: the work is being done by somebody the requirement never reached.

EntréeEvery firm and person on siteRequirements that bind themRésultatWho may not work todayRequirements binding nobody
Modules

Modules de ce playbook

5 / 190 modules de la plateforme

Le marché pour lequel ce cas est écrit

Russie

Tout dans ce cas suit la façon dont les travaux sont métrés, chiffrés et payés sur ce marché. Les formulaires, la décomposition des coûts et les règles de paiement sont ceux qui y sont utilisés, pas une version générique.

Normes qu’il suit

  • GESN/FER
  • KS-2 / KS-3

Vous n’avez rien de tout cela à paramétrer à la main. Au premier démarrage, la plateforme demande sur quel marché vous travaillez. Choisissez celui-ci et elle règle la langue de l’interface, charge la base de coûts correspondante, enregistre la classification des coûts et ajoute un projet d’exemple que vous pouvez ouvrir tout de suite.

Les contrôles propres à ce marché sont eux aussi fournis avec la plateforme. Une fois activés, un devis auquel il manque quelque chose que le marché attend est signalé pendant que vous y travaillez, et non après l’envoi de l’offre.

Plus dans Qualité & sécurité