Casi / Qualità e sicurezza
Qualità e sicurezza

Verificare l'iscrizione alla SRO prima che chiunque inizi i lavori

Mettete per iscritto ciò che ogni pacchetto di lavori richiede per legge, verificate l'iscrizione e il livello di responsabilità di ogni impresa che intendete impiegare, fatene una condizione di aggiudicazione, archiviate l'estratto del registro e sorvegliate le date di scadenza.

6 passaggi11 minImpresa generaleSviluppatore / committenteStudio di gestione progetti / cantieri

Come funziona, passo dopo passo

6 passi attraverso la piattaforma - cosa fare a ciascuno e perché conta.

1

Say what each discipline on the job actually requires

Abilitazioni

For each discipline, record what the firm or the individual doing it must hold: SRO membership in construction, in design or in survey, and any separate authorisation the work itself carries, such as work on a cultural heritage object or on a hazardous production facility. Mark the requirement blocking where a gap has to stop the work, and set the grace period you are willing to allow.

Perché: The requirement belongs to the work rather than to the supplier, and writing it down first is what makes every later check mechanical instead of a judgement call. Blocking is the decision that matters, because a requirement that is only a note stops nobody. It also surfaces the work that needs no membership at all, since the Town Planning Code exempts contracts below a stated value and certain categories of work, and demanding it there costs you bidders for nothing.

In entrataDisciplines on the jobFirms or people who hold itIn uscitaBlocking requirement per disciplineWork that needs none
2

Prequalify every firm against its own register extract

Elenco subappaltatori

For each firm, work through the prequalification questionnaire with the register extract in front of you: which SRO it belongs to, its membership number, when it joined, and which level of responsibility it holds against the value of the work you mean to give it. Attach the extract, and block the firm with the reason written down where the level does not cover that work. Read it from the extract, not from the scan on the firm's letterhead.

Schermata, passaggio 2: Prequalify every firm against its own register extract (Elenco subappaltatori, Verificare l'iscrizione alla SRO prima che chiunque inizi i lavori)
Elenco subappaltatori: Prequalify every firm against its own register extract

Perché: Membership is a live status rather than a certificate: it can be suspended or terminated while the firm goes on sending the same scanned page. The level is the part most often wrong, because a firm that is genuinely a member is very often a member at a level below the contract it is about to sign.

In entrataFirms under considerationRegister extractIn uscitaPrequalification decidedFirms blocked with a reason
3

Make it a condition of award, not a question afterwards

Approvvigionamento

Attach the requirement to the package in procurement so that an award cannot be made to a firm that does not meet it, and ask for the register extract as part of the offer rather than as something to be produced once the work is under way.

Schermata, passaggio 3: Make it a condition of award, not a question afterwards (Approvvigionamento, Verificare l'iscrizione alla SRO prima che chiunque inizi i lavori)
Approvvigionamento: Make it a condition of award, not a question afterwards

Perché: Checked after award this only ever produces bad options: re-tender and lose the programme, or carry on with a contractor whose work you may not be able to hand over. Checked as a condition of award it costs one field on the offer form.

In entrataRequirement per packageOffers receivedIn uscitaEligible biddersAward blocked without cover
4

Keep the register extract that proves it

Documenti

File the register extract for each firm together with the date it was taken, alongside the insurance and any separate authorisation, and keep it attached to the work package rather than in a general supplier folder.

Schermata, passaggio 4: Keep the register extract that proves it (Documenti, Verificare l'iscrizione alla SRO prima che chiunque inizi i lavori)
Documenti: Keep the register extract that proves it

Perché: When the client's technical supervision or an inspection asks who was entitled to do this work, the answer has to be a document dated before the work started. An extract pulled after the question is asked proves only that the firm is a member today, which is a much weaker statement and usually the wrong one.

In entrataRegister extract with its dateInsurance and permitsIn uscitaEvidence on the packageProof dated before the work
5

Write the membership into the subcontract as a standing duty

Contratti

Put the requirement in the subcontract itself: membership held for the whole term and not only at signature, notice to you within a fixed number of days if it is suspended or terminated, and the right to suspend the work and withhold payment until it is restored.

Schermata, passaggio 5: Write the membership into the subcontract as a standing duty (Contratti, Verificare l'iscrizione alla SRO prima che chiunque inizi i lavori)
Contratti: Write the membership into the subcontract as a standing duty

Perché: Membership lapses quietly and the SRO writes to its member, not to you. Checked once at award, it is a snapshot; written into the contract, it is a duty that runs for the whole term and gives you something to act on. A firm that was covered at award and is not covered in month eight goes on signing acts the client can later refuse, and that is normally found while the handover package is being checked.

In entrataFirm cleared for awardSubcontract clause templateIn uscitaMembership as a standing obligationDuty to report a lapse
6

Read who may not work today, and what lapses next

Abilitazioni

Read the compliance answer across the project: holders a blocking requirement stops outright, holders still inside their grace period, credentials expiring soon, and requirements that bind nobody at all because no holder on the register matches them. Clear that list before those firms reach the site.

Perché: This is the rare compliance question that is arithmetic rather than judgement, so it belongs in a report read on a date and not in somebody's habit. Expiry is worked out from the dates each time it is read rather than from a status somebody typed once, which is the only version of this check that survives a firm renewing late. A requirement binding nobody is the other half of the finding: the work is being done by somebody the requirement never reached.

In entrataEvery firm and person on siteRequirements that bind themIn uscitaWho may not work todayRequirements binding nobody
Moduli

Moduli di questo playbook

5 / 190 moduli della piattaforma

The market this case is written for

Russia

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Altro in Qualità e sicurezza

Qualità e sicurezza

Briefing di sicurezza e controllo

Informa la squadra sui pericoli reali di questo turno, registra chi era presente, poi dimost…

2 passaggi8 minApri