Verificar a filiação na SRO antes de alguém começar a trabalhar

Registe por escrito o que cada pacote de trabalho exige legalmente, verifique a filiação e o nível de responsabilidade de cada empresa que pretenda utilizar, faça disso uma condição de adjudicação, arquive o extrato do registo e vigie as datas de caducidade.

6 etapas11 minEmpreiteiro geralPromotor / clienteGabinete de gestão de projetos / obras

Como funciona, passo a passo

6 passos ao longo da plataforma - o que fazer em cada um e por que importa.

1

Say what each discipline on the job actually requires

Habilitações

For each discipline, record what the firm or the individual doing it must hold: SRO membership in construction, in design or in survey, and any separate authorisation the work itself carries, such as work on a cultural heritage object or on a hazardous production facility. Mark the requirement blocking where a gap has to stop the work, and set the grace period you are willing to allow.

Por quê: The requirement belongs to the work rather than to the supplier, and writing it down first is what makes every later check mechanical instead of a judgement call. Blocking is the decision that matters, because a requirement that is only a note stops nobody. It also surfaces the work that needs no membership at all, since the Town Planning Code exempts contracts below a stated value and certain categories of work, and demanding it there costs you bidders for nothing.

EntradaDisciplines on the jobFirms or people who hold itResultadoBlocking requirement per disciplineWork that needs none
2

Prequalify every firm against its own register extract

Diretório de subempreiteiros

For each firm, work through the prequalification questionnaire with the register extract in front of you: which SRO it belongs to, its membership number, when it joined, and which level of responsibility it holds against the value of the work you mean to give it. Attach the extract, and block the firm with the reason written down where the level does not cover that work. Read it from the extract, not from the scan on the firm's letterhead.

Captura de tela, etapa 2: Prequalify every firm against its own register extract (Diretório de subempreiteiros, Verificar a filiação na SRO antes de alguém começar a trabalhar)
Diretório de subempreiteiros: Prequalify every firm against its own register extract

Por quê: Membership is a live status rather than a certificate: it can be suspended or terminated while the firm goes on sending the same scanned page. The level is the part most often wrong, because a firm that is genuinely a member is very often a member at a level below the contract it is about to sign.

EntradaFirms under considerationRegister extractResultadoPrequalification decidedFirms blocked with a reason
3

Make it a condition of award, not a question afterwards

Compras

Attach the requirement to the package in procurement so that an award cannot be made to a firm that does not meet it, and ask for the register extract as part of the offer rather than as something to be produced once the work is under way.

Captura de tela, etapa 3: Make it a condition of award, not a question afterwards (Compras, Verificar a filiação na SRO antes de alguém começar a trabalhar)
Compras: Make it a condition of award, not a question afterwards

Por quê: Checked after award this only ever produces bad options: re-tender and lose the programme, or carry on with a contractor whose work you may not be able to hand over. Checked as a condition of award it costs one field on the offer form.

EntradaRequirement per packageOffers receivedResultadoEligible biddersAward blocked without cover
4

Keep the register extract that proves it

Documentos

File the register extract for each firm together with the date it was taken, alongside the insurance and any separate authorisation, and keep it attached to the work package rather than in a general supplier folder.

Captura de tela, etapa 4: Keep the register extract that proves it (Documentos, Verificar a filiação na SRO antes de alguém começar a trabalhar)
Documentos: Keep the register extract that proves it

Por quê: When the client's technical supervision or an inspection asks who was entitled to do this work, the answer has to be a document dated before the work started. An extract pulled after the question is asked proves only that the firm is a member today, which is a much weaker statement and usually the wrong one.

EntradaRegister extract with its dateInsurance and permitsResultadoEvidence on the packageProof dated before the work
5

Write the membership into the subcontract as a standing duty

Contratos

Put the requirement in the subcontract itself: membership held for the whole term and not only at signature, notice to you within a fixed number of days if it is suspended or terminated, and the right to suspend the work and withhold payment until it is restored.

Captura de tela, etapa 5: Write the membership into the subcontract as a standing duty (Contratos, Verificar a filiação na SRO antes de alguém começar a trabalhar)
Contratos: Write the membership into the subcontract as a standing duty

Por quê: Membership lapses quietly and the SRO writes to its member, not to you. Checked once at award, it is a snapshot; written into the contract, it is a duty that runs for the whole term and gives you something to act on. A firm that was covered at award and is not covered in month eight goes on signing acts the client can later refuse, and that is normally found while the handover package is being checked.

EntradaFirm cleared for awardSubcontract clause templateResultadoMembership as a standing obligationDuty to report a lapse
6

Read who may not work today, and what lapses next

Habilitações

Read the compliance answer across the project: holders a blocking requirement stops outright, holders still inside their grace period, credentials expiring soon, and requirements that bind nobody at all because no holder on the register matches them. Clear that list before those firms reach the site.

Por quê: This is the rare compliance question that is arithmetic rather than judgement, so it belongs in a report read on a date and not in somebody's habit. Expiry is worked out from the dates each time it is read rather than from a status somebody typed once, which is the only version of this check that survives a firm renewing late. A requirement binding nobody is the other half of the finding: the work is being done by somebody the requirement never reached.

EntradaEvery firm and person on siteRequirements that bind themResultadoWho may not work todayRequirements binding nobody
Módulos

Módulos deste playbook

5 / 190 módulos da plataforma

O mercado para o qual este caso foi escrito

Rússia

Tudo neste caso segue a forma como a obra é medida, orçada e paga neste mercado. Os documentos, a decomposição de custos e as regras de pagamento são os que se usam lá, não uma versão genérica.

Normas que ele segue

  • GESN/FER
  • KS-2 / KS-3

Você não precisa configurar nada disso na mão. Na primeira vez que abre a plataforma, ela pergunta em que mercado você trabalha. Escolha este e ela ajusta o idioma da interface, carrega a base de custos correspondente, registra a classificação de custos e adiciona um projeto de exemplo que você pode abrir na hora.

As verificações deste mercado também vêm com a plataforma. Ative uma vez e um orçamento ao qual falte algo que o mercado espera é sinalizado enquanto você trabalha nele, e não depois que a proposta já saiu.