Впишите две гарантии в контракт как две разные вещи, примите работы с перечнем незакрытых позиций, ведите оба срока отдельно и возвращайте гарантийное удержание по нужному из них, а не по тому, который кончается раньше.

Шагов: 712 минГенеральный подрядчикСпециализированный субподрядчикДевелопер / заказчикСметный консалтинг / QS

Как это работает, шаг за шагом

7 шагов через всю платформу - что делать на каждом и почему это важно.

1

Write the two guarantees as two clauses

Контракты

Record in the contract, separately, the jotallas the contractor undertakes and its period, and the szavatossag that follows from the Ptk. whether anybody writes it down or not. Alongside them record how the obligation is secured: retention held from each payment, a bank guarantee, or both, and on what event each is released.

Снимок экрана, шаг 1: Write the two guarantees as two clauses (Контракты, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Контракты: Write the two guarantees as two clauses

Зачем: Under jotallas the obligor escapes only by proving that the cause of the defect arose after performance; under szavatossag the party claiming carries the proof. A clause that says only garancia leaves that question to be argued at the worst possible moment, which is when a defect has appeared and neither side has a technical answer yet. Two clauses cost one paragraph and settle it in advance.

На входеContract draftScope and building typeНа выходеTwo guarantees written separatelyRetention and security terms
2

Check whether a mandatory jotallas applies

Проверка

Before the terms are agreed, check whether the work falls under a jotallas imposed by law rather than chosen by the parties. Government Decree 181/2003 (XI. 5.) is the one that matters in housing, and where it applies the parties cannot contract below it.

Снимок экрана, шаг 2: Check whether a mandatory jotallas applies (Проверка, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Проверка: Check whether a mandatory jotallas applies

Зачем: A negotiated guarantee shorter than the mandatory floor is not a negotiated guarantee, it is an unenforceable clause that both sides believed until the day it was tested. The contractor priced a risk it did not shed and the client relied on a period that was never in danger, and both find out at the same moment.

На входеBuilding type and clientDrafted guarantee termsНа выходеMandatory floor identifiedCompliance report
3

Take the works over with the list attached

Список замечаний

Walk the works at the atadas-atvetel and record what is outstanding as a list of items with owners and dates, separating what is genuinely incomplete from what is defective. Fix the takeover date on the record, because both guarantee periods are measured from performance.

Снимок экрана, шаг 3: Take the works over with the list attached (Список замечаний, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Список замечаний: Take the works over with the list attached

Зачем: Everything after this is dated from here, so a takeover that happened in stages and was never written down leaves two parties with two different opinions about when the clocks started. The distinction between incomplete and defective matters as much: incomplete work is finishing under the contract, and defective work is the guarantee, and only one of them should be holding up the payment.

На входеCompleted worksTakeover inspectionНа выходеList of outstanding itemsTakeover date fixed
4

Put the retention on a schedule, not in a memory

Финансы

Total what has been retained across the payments, split it into the portion released at takeover and the portion released at the end of the guarantee, and record each release as a dated event with the condition that triggers it.

Снимок экрана, шаг 4: Put the retention on a schedule, not in a memory (Финансы, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Финансы: Put the retention on a schedule, not in a memory

Зачем: Retention is the most commonly forgotten money in construction, in both directions. A contractor who does not track it asks for it late, sometimes years late and sometimes never. A client who does not track it releases it early against a defect it had every right to hold, and cannot get it back.

На входеRetention held to dateRelease termsНа выходеRelease scheduleBalance still held
5

Run the two clocks as two clocks

Сроки

Open a deadline for each period from the takeover date: the jotallas as the contract or the decree sets it, and the kellekszavatossagi igeny separately. Where the thing supplied is real property, that second one lapses five years from performance under the Ptk. rather than in the one year that applies generally.

Зачем: Both parties tend to file the job when the shorter clock stops, and that is the error the five-year rule punishes. A client who lets the szavatossagi period run out on a real defect loses a claim it had; a contractor who thinks the file closed with the jotallas has stopped keeping the record that would answer the claim. Two dated deadlines cost nothing and prevent both.

На входеTakeover dateBoth guarantee periodsНа выходеJotallas end dateSzavatossag end date
6

Classify each defect before you argue about it

Гарантии и ответственность за дефекты

When a defect is notified, record which period it falls in, what the site record says about that work, and which guarantee is being relied on. Then track the remedy to closure with the date it was fixed, because a repaired part restarts the limitation on that part.

Снимок экрана, шаг 6: Classify each defect before you argue about it (Гарантии и ответственность за дефекты, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Гарантии и ответственность за дефекты: Classify each defect before you argue about it

Зачем: Which guarantee applies decides who has to prove what, and that decides the outcome far more often than the technical merits do. Making the classification an explicit step, with the site record next to it, is what turns a defect notice into a question with an answer rather than into an exchange of letters that runs until somebody gives up.

На входеDefect notified after handoverSite record for that workНа выходеDefect classified under one guaranteeRemedy tracked to closure
7

Close the guarantee without closing the file

Закрытие

At the end of the jotallas period, walk the outstanding items, release the final retention against a clean list, and keep the project record open until the longer szavatossagi period has run rather than archiving it with the money.

Снимок экрана, шаг 7: Close the guarantee without closing the file (Закрытие, Развести jótállás и szavatosság и вернуть гарантийное удержание)
Закрытие: Close the guarantee without closing the file

Зачем: The record is the asset that outlives the retention. A claim arriving in year four is answered from the naplo, the inspections and the takeover list, and a firm that filed all of it when the money was released is answering from memory instead. Releasing the retention and keeping the file are two decisions, and only one of them should be made at this point.

На входеExpired jotallas periodOpen defect itemsНа выходеFinal retention releasedRecord kept for the longer period
Модули

Модули этого плейбука

7 / 190 модулей платформы

The market this case is written for

Венгрия

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Ещё в разделе Сдача-приёмка и жизненный цикл

Сдача-приёмка и жизненный цикл

Сдать объект и закрыть проект

Завершите проект чисто: доведите список замечаний до нуля, подтвердите, что все проверки про…

Шагов: 514 минОткрыть