Vakalar / Ticari ve sözleşmeler
Ticari ve sözleşmeler

Her számla'yı NAV Online Számla'ya bildirin

Önce fatura içeriğini doğru yapın, veriyi kesildiği anda NAV'a bildirin, reddedilmiş veya işaretlenmiş olarak geri geleni giderin ve bildirilen kümeyi projenin kestiğini sandığı faturalarla mutabık kılın.

6 adım11 dkAna yükleniciUzman taşeronMaliyet danışmanlığı / QSGeliştirici / işveren

Nasıl çalışır, adım adım

Platform genelinde 6 adım - her birinde ne yapacağınız ve neden önemli olduğu.

1

Get the invoice right before it is issued

Finans

Build the szamla with the content the VAT Act requires: both parties and their tax numbers, the invoice number and dates, the description and quantity of the work, the taxable amount, the rate and the tax, or the marking that says why there is none. Reference the teljesitesigazolas the invoice answers.

Ekran görüntüsü, adım 1: Get the invoice right before it is issued (Finans, Her számla'yı NAV Online Számla'ya bildirin)
Finans: Get the invoice right before it is issued

Neden: The report carries the invoice, so a defect in the invoice becomes a defect in the report and then a defect in the customer's deduction. Correcting it means a modifying invoice and a second report, and on a construction account it means the payment clock restarts on a document the client has every reason to send back.

GirdiApproved teljesitesigazolasCustomer and tax numberÇıktıSzamla ready to issueMandatory fields complete
2

Transmit the data at the moment of issue

e-Fatura Onayı

Send the invoice data through the Online Szamla channel as the invoice is issued, in the XML structure the tax authority publishes, and keep the transaction identifier the system returns against the invoice record.

Neden: For an invoice produced by software the obligation is immediate and automatic: no batching to the end of the day, no operator pressing a button. Keeping the transaction identifier against the invoice is what turns the claim that it was reported into a fact somebody can check, which is exactly what nobody can produce when the question arrives eighteen months later.

GirdiIssued szamlaReporting credentialsÇıktıInvoice data transmittedTransaction identifier
3

Put a clock on every invoice written by hand

Son tarihler

For an invoice written out of a numbered book, open a deadline the day it is issued and give it an owner. Four calendar days is the normal window, and one calendar day where the tax on the invoice reaches 500 000 forint, so the amount decides which clock you are on.

Ekran görüntüsü, adım 3: Put a clock on every invoice written by hand (Son tarihler, Her számla'yı NAV Online Számla'ya bildirin)
Son tarihler: Put a clock on every invoice written by hand

Neden: The short window is the one that catches people out, because the invoice large enough to trigger it is exactly the one raised in a hurry to unblock a payment. Nothing on the paper says which deadline applies and nobody in the office knows the invoice exists yet, so the clock has to be started by whoever wrote it rather than by whoever files it.

GirdiHandwritten invoice from siteTax amount on itÇıktıReporting deadline setOwner for the deadline
4

Read what came back, not just that it went

Doğrulama

Check the processing result for every submission. Clear the technical errors and resend, and record the warnings rather than closing them, because a warning is a report that landed with something wrong inside it.

Ekran görüntüsü, adım 4: Read what came back, not just that it went (Doğrulama, Her számla'yı NAV Online Számla'ya bildirin)
Doğrulama: Read what came back, not just that it went

Neden: A submission that was accepted for transmission and then rejected in processing is an invoice that has not been reported at all, and nothing about it looks different from the sending side. This is the failure that accumulates silently for a quarter and is then discovered as a set rather than as an incident.

GirdiReporting responseInvoice as reportedÇıktıErrors cleared and resentWarnings recorded
5

Reconcile issued against reported

Olay Mutabakatı

Match the invoices the project believes it raised against the invoices that carry a transaction identifier, and look at both sides of the difference: an invoice with no report, and a report with no invoice on the project.

Neden: On a construction account the gap is almost never a system fault, it is an invoice raised outside the normal route: from site, from a different company in the group, or against a project code nobody uses any more. Reconciling by count rather than by document is how a firm satisfies itself that everything is reported while one invoice a month is not.

GirdiInvoices the project raisedInvoices reportedÇıktıMatched setUnreported invoices found
6

Keep the proof with the project, not with the ledger

Belgeler

File the invoice, its transaction receipt and the teljesitesigazolas it answers together on the project, so the three travel as one record rather than living in three systems that agree only when somebody checks.

Ekran görüntüsü, adım 6: Keep the proof with the project, not with the ledger (Belgeler, Her számla'yı NAV Online Számla'ya bildirin)
Belgeler: Keep the proof with the project, not with the ledger

Neden: Questions about an invoice arrive on the project long before they arrive in the accounts: a client disputes a period, a subcontractor claims a payment, a final account is being settled. Whoever answers is on the site side of the business, and giving them the proof of report in the same place as the invoice is the difference between an answer and a request forwarded to somebody on holiday.

GirdiReported invoice setTransaction receiptsÇıktıInvoice pack with proof of reportAudit trail on the project
Modüller

Bu senaryodaki modüller

6 / 190 platform modülü

The market this case is written for

Macaristan

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Ticari ve sözleşmeler kategorisinde daha fazlası

Ticari ve sözleşmeler

Bir taşeron paketini yürütün

Bir imalat paketini bir taşerona verin, ödeme tablosu ve hakediş kesintisiyle birlikte sözle…

3 adım11 dkAç
Ticari ve sözleşmeler

Hakediş talebi ve mutabakat

Bu dönem yerinde yapılan işi sözleşmeye göre değerlendirin, kanıtlarını arkasına koyarak hak…

3 adım12 dkAç