Cases / Kommercielt og kontrakter
Kommercielt og kontrakter

Indberet hver számla til NAV Online Számla

Få fakturaindholdet rigtigt først, indberet data til NAV i udstedelsesøjeblikket, ryd det, der kommer tilbage afvist eller markeret, og afstem det indberettede sæt mod de fakturaer, projektet tror, det har udstedt.

6 trin11 minHovedentreprenørFagentreprenørOmkostnings- / mængderådgivningUdvikler / bygherre

Sådan fungerer det, trin for trin

6 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Get the invoice right before it is issued

Finans

Build the szamla with the content the VAT Act requires: both parties and their tax numbers, the invoice number and dates, the description and quantity of the work, the taxable amount, the rate and the tax, or the marking that says why there is none. Reference the teljesitesigazolas the invoice answers.

Hvorfor: The report carries the invoice, so a defect in the invoice becomes a defect in the report and then a defect in the customer's deduction. Correcting it means a modifying invoice and a second report, and on a construction account it means the payment clock restarts on a document the client has every reason to send back.

InputApproved teljesitesigazolasCustomer and tax numberResultatSzamla ready to issueMandatory fields complete
2

Transmit the data at the moment of issue

Klarering af e-fakturaer

Send the invoice data through the Online Szamla channel as the invoice is issued, in the XML structure the tax authority publishes, and keep the transaction identifier the system returns against the invoice record.

Hvorfor: For an invoice produced by software the obligation is immediate and automatic: no batching to the end of the day, no operator pressing a button. Keeping the transaction identifier against the invoice is what turns the claim that it was reported into a fact somebody can check, which is exactly what nobody can produce when the question arrives eighteen months later.

InputIssued szamlaReporting credentialsResultatInvoice data transmittedTransaction identifier
3

Put a clock on every invoice written by hand

Frister

For an invoice written out of a numbered book, open a deadline the day it is issued and give it an owner. Four calendar days is the normal window, and one calendar day where the tax on the invoice reaches 500 000 forint, so the amount decides which clock you are on.

Hvorfor: The short window is the one that catches people out, because the invoice large enough to trigger it is exactly the one raised in a hurry to unblock a payment. Nothing on the paper says which deadline applies and nobody in the office knows the invoice exists yet, so the clock has to be started by whoever wrote it rather than by whoever files it.

InputHandwritten invoice from siteTax amount on itResultatReporting deadline setOwner for the deadline
4

Read what came back, not just that it went

Validering

Check the processing result for every submission. Clear the technical errors and resend, and record the warnings rather than closing them, because a warning is a report that landed with something wrong inside it.

Hvorfor: A submission that was accepted for transmission and then rejected in processing is an invoice that has not been reported at all, and nothing about it looks different from the sending side. This is the failure that accumulates silently for a quarter and is then discovered as a set rather than as an incident.

InputReporting responseInvoice as reportedResultatErrors cleared and resentWarnings recorded
5

Reconcile issued against reported

Hændelsesafstemning

Match the invoices the project believes it raised against the invoices that carry a transaction identifier, and look at both sides of the difference: an invoice with no report, and a report with no invoice on the project.

Hvorfor: On a construction account the gap is almost never a system fault, it is an invoice raised outside the normal route: from site, from a different company in the group, or against a project code nobody uses any more. Reconciling by count rather than by document is how a firm satisfies itself that everything is reported while one invoice a month is not.

InputInvoices the project raisedInvoices reportedResultatMatched setUnreported invoices found
6

Keep the proof with the project, not with the ledger

Dokumenter

File the invoice, its transaction receipt and the teljesitesigazolas it answers together on the project, so the three travel as one record rather than living in three systems that agree only when somebody checks.

Hvorfor: Questions about an invoice arrive on the project long before they arrive in the accounts: a client disputes a period, a subcontractor claims a payment, a final account is being settled. Whoever answers is on the site side of the business, and giving them the proof of report in the same place as the invoice is the difference between an answer and a request forwarded to somebody on holiday.

InputReported invoice setTransaction receiptsResultatInvoice pack with proof of reportAudit trail on the project
Moduler

Moduler i denne playbook

6 / 190 platformmoduler

The market this case is written for

Ungarn

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mere inden for Kommercielt og kontrakter

Kommercielt og kontrakter

Kør en underentreprenørpakke

Tildel en fagpakke til en underentreprenør, læg den på en underentreprise med en betalingspl…

3 trin11 minÅbn
Kommercielt og kontrakter

Betalingsanmodning og afstemning

Værdisæt det arbejde, der er udført i denne periode, op mod kontrakten, opret betalingsanmod…

3 trin12 minÅbn