Naceňte fakturu bez daně, veďte zisk, rezervu, dělnický odvod a daň jako oddělené řádky na správném základu, spočítejte srážku u zdroje, a ukazujte certifikovanou částku vedle toho, co skutečně dorazí.

5 kroků20 minGenerální dodavatelSpecializovaný subdodavatelNákladové poradenství / rozpočtářstvíDeveloper / klient

Jak to funguje, krok za krokem

5 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

Price the bill tax exclusive and say so on the bill

Rozpočet

Enter every rate as the cost of the work with no tax and no cess inside it, and state on the bill header that the rates are exclusive. Where a supplier quotation arrives tax inclusive, strip the tax before the figure becomes a rate.

Proč: Exclusive rates are the only ones that can be checked against a published schedule, which is stated the same way. They are also the only ones that survive a change of rate or of contract type without a rebuild, because the change then lands on one line instead of on every line.

VstupThe measured billSchedule or analysed ratesVýstupRates stated tax exclusiveA direct cost you can compare
2

Stack the markups in the order they actually apply

Poznámky

Add the contractor's profit and overheads, the contingency, the welfare cess and the tax as separate markup lines, each pointed at the base it is charged on. The cess is charged on the cost of construction; the tax is charged on the value including what sits below it. Set the tax rate from the contract type rather than from habit, and confirm it against the current notification: works contracts are not all rated alike, and government works, affordable housing and ordinary commercial work are treated differently.

Snímek obrazovky, krok 2: Stack the markups in the order they actually apply (Poznámky, Udržet GST, TDS a dělnický odvod mimo jednotkovou sazbu)
Poznámky: Stack the markups in the order they actually apply

Proč: Order matters here in money terms, not only in presentation. A cess charged on a base that already includes tax, or a tax charged on a base that leaves out the profit, produces a total that is wrong in a way nobody notices until a department checks the arithmetic. Declaring the base per line makes the stack readable and re-runnable.

VstupDirect cost from the billWhat kind of contract this isVýstupProfit, contingency, cess and tax as linesEach one on the base it applies to
3

Work out the deduction at source before you pay, not after

Srážková daň

Set up the withholding scheme for the payments you make to contractors and subcontractors, with its rate bands and its threshold, and record the payee's status and registration details against them. The rate turns on what kind of entity the payee is, so it is a fact about them rather than a setting on the project.

Proč: Deducting at the wrong rate is the payer's problem, not the payee's. Getting it wrong upward means holding money that was not yours to hold and a subcontractor who stops turning up; getting it wrong downward means the shortfall is recovered from you later, with interest, long after the job is closed.

VstupWho is being paid, and their statusThe gross paymentVýstupWhat is deducted at sourceWhat the payee receives
4

Raise the bill showing gross, deductions and net

Finance

Build the payment from the certified value: add the tax, show the cess and the deduction at source and the retention as their own lines, and state the net. Carry the service accounting code and the registration numbers the invoice has to bear.

Snímek obrazovky, krok 4: Raise the bill showing gross, deductions and net (Finance, Udržet GST, TDS a dělnický odvod mimo jednotkovou sazbu)
Finance: Raise the bill showing gross, deductions and net

Proč: A bill that shows every line is a bill both sides can pass in one go. A bill that shows only a net figure is queried by the department's accounts branch, and each query costs a fortnight, which on a running account is the difference between paying your suppliers this month and next.

VstupThe certified valueCess, tax at source and retentionVýstupAn invoice that shows each lineThe amount you expect to receive
5

Report what was certified next to what arrived

Reporty

Produce a statement per bill showing value certified, tax added, amounts deducted at source, cess, retention, and cash received, with the running total of what is held against you and recoverable later.

Snímek obrazovky, krok 5: Report what was certified next to what arrived (Reporty, Udržet GST, TDS a dělnický odvod mimo jednotkovou sazbu)
Reporty: Report what was certified next to what arrived

Proč: The deductions are recoverable, which makes them easy to forget and expensive to forget. On a long job the money held at source and in retention is a large working capital number that belongs on the balance sheet rather than in somebody's head, and it is only visible if the lines were kept apart from the start.

VstupBills raised and money receivedVýstupCertified value against cash inWhat is held and recoverable
Moduly

Moduly v tomto playbooku

5 / 190 modulů platformy

The market this case is written for

Indie

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.