Bedøm et tilbud på pris og præference efter PPPFA

Vælg det pointforhold, udbuddets værdi dikterer, angiv specific goals i udbudsmaterialet, ensret de prissatte mængdelister, så den pris du bedømmer er sammenlignelig, og bedøm så prisen efter formlen og præferencen efter det, du har offentliggjort.

7 trin13 minUdvikler / bygherreProjekt- / byggeledelsesfirmaOmkostnings- / mængderådgivning

Sådan fungerer det, trin for trin

7 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Set the ratio and publish the specific goals

Udbud

Take the ratio from your own estimate of the value: 80 points for price and 20 for preference up to R50 million, 90 and 10 above it. Then write into the tender document the specific goals that will earn the preference points and the number of points each is worth, together with the proof a bidder must submit to claim them.

Skærmbillede, trin 1: Set the ratio and publish the specific goals (Udbud, Bedøm et tilbud på pris og præference efter PPPFA)
Udbud: Set the ratio and publish the specific goals

Hvorfor: Under the Preferential Procurement Policy Framework Act 5 of 2000 the goals are the organ of state's to choose, but only in the tender document and only in advance. Goals that commonly appear include the bidder's B-BBEE contributor status level, but nothing is scored by default: an evaluation committee that awards points for a goal the advertisement never mentioned has given every unsuccessful bidder a review, and one that ignores a goal it did publish has done the same.

InputPre-tender estimateProcurement policyResultatPoints ratioPublished specific goals
2

Register the bids and test them for responsiveness

Tilbudsstyring

Log every bid received with its price and the returnable schedules it came with, then run the responsiveness check before any scoring: CIDB registration current and of the right designation, tax status, the goal claims supported by the proof the tender asked for.

Skærmbillede, trin 2: Register the bids and test them for responsiveness (Tilbudsstyring, Bedøm et tilbud på pris og præference efter PPPFA)
Tilbudsstyring: Register the bids and test them for responsiveness

Hvorfor: Responsiveness is a gate and not a score. A bid that fails it never reaches the points table, and mixing the two up is how a committee ends up defending why it gave a non-responsive bid 78 points instead of why it set the bid aside. Doing the check first, in writing, is what makes the rest of the evaluation short.

InputSubmitted bidsReturnable schedulesResultatBid registerResponsiveness check
3

Level the priced bills item by item

Tilbudsliste

Put the priced bills side by side at item level, find the arithmetic errors, the items priced at nil and the qualifications written into a covering letter, and raise a query on each before the price goes into the formula.

Skærmbillede, trin 3: Level the priced bills item by item (Tilbudsliste, Bedøm et tilbud på pris og præference efter PPPFA)
Tilbudsliste: Level the priced bills item by item

Hvorfor: The price points formula measures every bid against the lowest one, so an arithmetic slip in the cheapest bid does not just misprice that bid, it moves the score of every other bidder. Levelling is the only step that makes the number going into the formula mean the same thing for everyone.

InputPriced billsBidder qualificationsResultatComparable pricesTender queries
4

Score price by the formula and preference by the goals

Tilbudsstyring

Score price with the formula the regulations give: the lowest acceptable bid takes the full weighting, and every other bid loses the proportion by which it exceeds that lowest bid. Then add the preference points, goal by goal, against the proof each bidder submitted, and total the two.

Hvorfor: The formula is what makes preference points decisive rather than decorative. A bid five per cent above the lowest gives up only a small part of its price points, so full preference points can and often do outweigh that gap, and a committee that quietly awards on price alone has ignored the Act. Writing the arithmetic down per bidder is what makes the award defensible.

InputLevelled pricesGoal claimsResultatPoints per bidderRanking
5

Take the recommendation through the approval route

Godkendelsesruter

Send the evaluation report and the points table through the delegation of authority the organ of state works to, so the adjudication decision and the person who took it are both on the record with a date.

Skærmbillede, trin 5: Take the recommendation through the approval route (Godkendelsesruter, Bedøm et tilbud på pris og præference efter PPPFA)
Godkendelsesruter: Take the recommendation through the approval route

Hvorfor: A tender award is reviewable, and the first thing a review asks is who decided and on what. An approval trail that shows the points table the decision was taken on, unchanged, answers that in one page. Note also that the Public Procurement Act 28 of 2024 has been passed and is being brought into operation in stages, so record which regime the tender was advertised under.

InputPoints tableEvaluation reportResultatAward decisionApproval trail
6

Turn the award into a contract with its data filled in

Kontrakter

Draw up the contract on the form the tender was advertised on and complete the contract data: the accepted priced document, the dates, the securities, the penalty, and the goals the bidder committed to that now become contractual obligations.

Skærmbillede, trin 6: Turn the award into a contract with its data filled in (Kontrakter, Bedøm et tilbud på pris og præference efter PPPFA)
Kontrakter: Turn the award into a contract with its data filled in

Hvorfor: A goal that earned preference points and was never written into the contract is a promise nobody can enforce. Carrying the commitments across at signature is what makes the preference part of the score mean something on site rather than only on the scoresheet.

InputAward decisionAccepted billResultatSigned contractContract data
7

Notify every bidder and close the tender file

Korrespondance

Write to the successful and the unsuccessful bidders, publish the award as the organ of state is required to, and close the file with the advertisement, the bids, the responsiveness check, the points table and the approval in it.

Skærmbillede, trin 7: Notify every bidder and close the tender file (Korrespondance, Bedøm et tilbud på pris og præference efter PPPFA)
Korrespondance: Notify every bidder and close the tender file

Hvorfor: An unsuccessful bidder is entitled to know it lost and to ask why, and the answer is the points table. A tender file assembled after a challenge arrives always looks assembled after a challenge arrives; one closed on the day of the award is simply the record.

InputFinal rankingBidder listResultatNotification lettersTender file
Moduler

Moduler i denne playbook

6 / 190 platformmoduler

The market this case is written for

Sydafrika

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • JBCC 6.2
  • SANS 1921

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mere inden for Udbud og indkøb

Udbud og indkøb

Kør et udbud ud fra en BOQ

Tag en prissat tilbudsliste ud på markedet: pak den, invitér underentreprenørerne, nivellér…

5 trin12 minÅbn
Udbud og indkøb

Indkøb materialer ud fra BOQ'en

Køb de mængder, du allerede har prissat: opret en rekvisition ud fra tilbudslisten, afgiv or…

4 trin10 minÅbn
Udbud og indkøb

Sammenlign tilbud og tildel

Tag en mappe med indkomne tilbud, der aldrig helt matcher, skær dem tilbage til det samme om…

3 trin12 minÅbn