Casos prácticos / Licitación y compras
Licitación y compras

Register and grade with the CIDB before you tender

Read the grading designation a tender calls for, check your own registration and grade against it, keep the renewal off the critical path, and check the same thing on every subcontractor you carry with you.

6 pasos11 minContratista generalSubcontratista especializadoGestora de proyectos / construcción

Cómo funciona, paso a paso

6 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Read the grading designation the tender calls for

Licitaciones

Open the tender and write down the designation it asks for, both halves of it: the class of work, and the grade. Then read the scope against the class, because a building contract with a substantial electrical or mechanical element can call for more than one class.

Captura de pantalla, paso 1: Read the grading designation the tender calls for (Licitaciones, Register and grade with the CIDB before you tender)
Licitaciones: Read the grading designation the tender calls for

Por que: The designation is the first thing an evaluation committee checks and the cheapest thing to fail on. A bid from a firm whose class of work does not cover the contract is not scored and then rejected, it is set aside before scoring, and the tender fee and three weeks of estimating go with it.

EntradaTender documentScope of workResultadoRequired class of workRequired grade
2

Check your own grade against the tender value

Gestión de ofertas

Put your own designation next to your estimate of the tender value and make the bid or no bid decision on it. Each grade carries a tender value ceiling, rising through the nine grades, and only grade 9 has no upper limit.

Por que: A grade is a ceiling, not a guideline: a public sector client cannot award above it whatever the merits of the price. Making the call before the estimating starts is the difference between a considered no bid and an expensive one, and recording why you passed is what lets you argue for an upgrade with evidence next year.

EntradaOwn registrationTender valueResultadoBid or no bidRecorded reason
3

Put the registration expiry on the deadline register

Plazos

Record the expiry date of the registration as a deadline with a reminder far enough ahead to renew, and put the same date against every bid in the pipeline that closes after it.

Captura de pantalla, paso 3: Put the registration expiry on the deadline register (Plazos, Register and grade with the CIDB before you tender)
Plazos: Put the registration expiry on the deadline register

Por que: Registration is checked as at the closing date of the tender, not as at the day the work starts. A firm that has been on the register for eleven years and let it lapse for eleven days is, on that day, a firm a public sector client may not award to, and no amount of history changes that.

EntradaRegistration certificateBid pipelineResultadoExpiry date trackedRenewal reminder
4

Check the designation of every subcontractor on the team

Directorio de subcontratistas

For each package you intend to sublet, record the subcontractor, the class of work its designation carries and the value of the package, and flag any package whose value or class the subcontractor cannot cover.

Captura de pantalla, paso 4: Check the designation of every subcontractor on the team (Directorio de subcontratistas, Register and grade with the CIDB before you tender)
Directorio de subcontratistas: Check the designation of every subcontractor on the team

Por que: The electrical and mechanical classes exist precisely because that work is graded separately from general building. A team assembled on price alone can be perfectly capable and still put a package with a firm whose designation does not reach it, and the tender document usually asks you to name them.

EntradaProposed subcontractorsWork packagesResultadoChecked designationsGaps to fill
5

Keep one compliance pack the bid team can reach

Documentos

Hold the registration certificate, the tax clearance, the letter of good standing under the Compensation for Occupational Injuries and Diseases Act 130 of 1993 and the B-BBEE certificate or sworn affidavit in one place, each with the date it stops being current.

Captura de pantalla, paso 5: Keep one compliance pack the bid team can reach (Documentos, Register and grade with the CIDB before you tender)
Documentos: Keep one compliance pack the bid team can reach

Por que: Every one of these documents is asked for by almost every tender and every one of them expires. Hunting for the current version on the afternoon a bid closes is how a compliant firm submits an expired certificate, and an expired certificate is treated as no certificate.

EntradaRegistration certificatesStatutory returnsResultadoCompliance packCurrent versions
6

Get the award onto the register of projects

Envíos a Autoridad

Supply the client with what the register of projects needs and keep the record of the submission. A public sector client registers construction works above R200 000; for state owned entities and for private sector work the threshold is R10 million.

Captura de pantalla, paso 6: Get the award onto the register of projects (Envíos a Autoridad, Register and grade with the CIDB before you tender)
Envíos a Autoridad: Get the award onto the register of projects

Por que: The register of projects is the client's duty under the construction industry development regulations, but the data comes from the contractor and the delay lands on the contractor. It also matters to you later: the performance record built on registered projects is what a grading upgrade application is assessed on, so a project nobody registered is a project that never counted towards your next grade.

EntradaAward detailsContract valueResultadoProject registeredSubmission record
Módulos

Módulos de este playbook

6 / 190 módulos de la plataforma

The market this case is written for

Sudáfrica

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • JBCC 6.2
  • SANS 1921

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Más en Licitación y compras

Licitación y compras

Llevar a licitación un BOQ

Saca a licitación un presupuesto (BOQ) valorizado: arma el paquete, invita a los subcontrati…

5 pasos12 minAbrir
Licitación y compras

Comprar materiales a partir del BOQ

Compra las cantidades que ya costeaste: genera una requisición a partir del catálogo, coloca…

4 pasos10 minAbrir
Licitación y compras

Comparar propuestas y adjudicar

Toma una carpeta de propuestas recibidas que nunca coinciden del todo, redúcelas al mismo al…

3 pasos12 minAbrir