Gawing tracked na aksyon ang isang dokumento

Tukuyin ang liham, RFI, o nakuhang mensahe na humihingi ng isang bagay na gawin sa halip na i-file lamang, magtaas ng isang task nang direkta rito na pinapanatili ang pamagat, ang petsa, at ang link pabalik, saka gawin ito habang nakadikit pa rin ang pinagmulan.

3 hakbang8 minGeneral ContractorEspesyalistang SubcontractorProject / Construction Management Firm

Paano ito gumagana, hakbang-hakbang

3 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Find the one that needs doing

Sulatan

Go down the correspondence list, the RFIs or your inbound captures and pick out the item that is not asking for a reply but for something to happen on site. Note the response-required-by date it carries, because that is the date the task will inherit.

Screenshot, hakbang 1: Find the one that needs doing (Sulatan, Gawing tracked na aksyon ang isang dokumento)
Sulatan: Find the one that needs doing

Bakit: Most documents need filing and a handful need doing, and telling those apart is the whole job. It is also the job that gets skipped at four on a Friday, which is how a letter with a fourteen-day deadline gets read properly on day fifteen.

PapasokLetters, RFIs and capturesResponse-required datesLumalabasThe item that needs doingThe date it carries
2

Create the task from the source

Mga Gawain

Use Create task on the item itself. It prefills the title from the subject, a description pointing back at the record, the due date from the response-required-by date and an assignee where one can be worked out. Adjust what needs adjusting, submit, and the task lands in the tasks list with its origin recorded.

Screenshot, hakbang 2: Create the task from the source (Mga Gawain, Gawing tracked na aksyon ang isang dokumento)
Mga Gawain: Create the task from the source

Bakit: Retyping a task out of a letter is where the reference number goes missing and the deadline quietly becomes next Friday. Creating it from the source keeps both, and keeps the letter and the task as one piece of work rather than two records nobody ever links back together.

PapasokThe source documentPrefilled title and dateLumalabasTask in the listRecorded link to the source
3

Work it and keep the source attached

Mga Gawain

Work the task from the list. It shows a badge naming the kind of document it came from, and the badge links back to the record, so whoever picks it up can read the original before they act. Close it only when the thing the document asked for is genuinely done.

Bakit: A task with no visible origin gets closed on somebody's guess about what it meant. Months later, when a client asks what was done about a particular letter, the badge is the difference between answering in a click and losing an afternoon in the archive.

PapasokOpen taskSource badgeLumalabasCompleted taskTraceable to the document
Mga Module

Mga Module sa Playbook na Ito

2 / 190 na module ng platform

Higit pa sa Site at field

Site at field

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…

4 hakbang9 minBukas
Site at field

Answer an RFI

Turn a question from the working face into a tracked request, drive it to the party who own…

3 hakbang9 minBukas