案例 / 现场与作业
现场与作业

把一份文件转化为一项可跟踪的行动

找出那些要求办理而非仅仅归档的信函、RFI或已采集的消息,直接据此发起一项任务,保留标题、日期和回链,并在处理时始终附带原始来源。

3 个步骤8 分钟总承包商专业分包商项目/施工管理公司

运作方式,逐步说明

贯穿平台的 3 个步骤 - 每一步做什么,以及为什么重要。

1

Find the one that needs doing

往来函件

Go down the correspondence list, the RFIs or your inbound captures and pick out the item that is not asking for a reply but for something to happen on site. Note the response-required-by date it carries, because that is the date the task will inherit.

屏幕截图,步骤 1:Find the one that needs doing (往来函件, 把一份文件转化为一项可跟踪的行动)
往来函件: Find the one that needs doing

原因: Most documents need filing and a handful need doing, and telling those apart is the whole job. It is also the job that gets skipped at four on a Friday, which is how a letter with a fourteen-day deadline gets read properly on day fifteen.

输入Letters, RFIs and capturesResponse-required dates成果The item that needs doingThe date it carries
2

Create the task from the source

任务

Use Create task on the item itself. It prefills the title from the subject, a description pointing back at the record, the due date from the response-required-by date and an assignee where one can be worked out. Adjust what needs adjusting, submit, and the task lands in the tasks list with its origin recorded.

屏幕截图,步骤 2:Create the task from the source (任务, 把一份文件转化为一项可跟踪的行动)
任务: Create the task from the source

原因: Retyping a task out of a letter is where the reference number goes missing and the deadline quietly becomes next Friday. Creating it from the source keeps both, and keeps the letter and the task as one piece of work rather than two records nobody ever links back together.

输入The source documentPrefilled title and date成果Task in the listRecorded link to the source
3

Work it and keep the source attached

任务

Work the task from the list. It shows a badge naming the kind of document it came from, and the badge links back to the record, so whoever picks it up can read the original before they act. Close it only when the thing the document asked for is genuinely done.

原因: A task with no visible origin gets closed on somebody's guess about what it meant. Months later, when a client asks what was done about a particular letter, the badge is the difference between answering in a click and losing an afternoon in the archive.

输入Open taskSource badge成果Completed taskTraceable to the document
模块

此方案使用的模块

190 个平台模块中的 2 个

更多 现场与作业 案例

现场与作业

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…

4 个步骤9 分钟打开
现场与作业

Answer an RFI

Turn a question from the working face into a tracked request, drive it to the party who own…

3 个步骤9 分钟打开