Omdan et dokument til en sporet handling

Find det brev, den RFI eller den registrerede besked, der beder om, at noget bliver gjort, frem for blot arkiveret, opret en opgave direkte ud fra den, der bevarer titlen, datoen og linket tilbage, og arbejd med den, mens kilden stadig er vedhæftet.

3 trin8 minHovedentreprenørFagentreprenørProjekt- / byggeledelsesfirma

Sådan fungerer det, trin for trin

3 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Find the one that needs doing

Korrespondance

Go down the correspondence list, the RFIs or your inbound captures and pick out the item that is not asking for a reply but for something to happen on site. Note the response-required-by date it carries, because that is the date the task will inherit.

Skærmbillede, trin 1: Find the one that needs doing (Korrespondance, Omdan et dokument til en sporet handling)
Korrespondance: Find the one that needs doing

Hvorfor: Most documents need filing and a handful need doing, and telling those apart is the whole job. It is also the job that gets skipped at four on a Friday, which is how a letter with a fourteen-day deadline gets read properly on day fifteen.

InputLetters, RFIs and capturesResponse-required datesResultatThe item that needs doingThe date it carries
2

Create the task from the source

Opgaver

Use Create task on the item itself. It prefills the title from the subject, a description pointing back at the record, the due date from the response-required-by date and an assignee where one can be worked out. Adjust what needs adjusting, submit, and the task lands in the tasks list with its origin recorded.

Skærmbillede, trin 2: Create the task from the source (Opgaver, Omdan et dokument til en sporet handling)
Opgaver: Create the task from the source

Hvorfor: Retyping a task out of a letter is where the reference number goes missing and the deadline quietly becomes next Friday. Creating it from the source keeps both, and keeps the letter and the task as one piece of work rather than two records nobody ever links back together.

InputThe source documentPrefilled title and dateResultatTask in the listRecorded link to the source
3

Work it and keep the source attached

Opgaver

Work the task from the list. It shows a badge naming the kind of document it came from, and the badge links back to the record, so whoever picks it up can read the original before they act. Close it only when the thing the document asked for is genuinely done.

Hvorfor: A task with no visible origin gets closed on somebody's guess about what it meant. Months later, when a client asks what was done about a particular letter, the badge is the difference between answering in a click and losing an afternoon in the archive.

InputOpen taskSource badgeResultatCompleted taskTraceable to the document
Moduler

Moduler i denne playbook

2 / 190 platformmoduler

Mere inden for Byggeplads og felt

Byggeplads og felt

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…