Метрээр хэмжиж, империалаар худалдаж авах

Зургийг метрээр хэмжиж, тоо хэмжээг хадгалагдаж, экспортлогдох хаа сайгүй метр хэвээр байлгаж, мод материалын агуулах бодитоор танд зарах империал бүтээгдэхүүний нэрийг ижил мөрөнд авч явна, хоёулаа нэг нэгнээ дарж бичихгүй байхаар.

5 алхам15 минЕрөнхий гүйцэтгэгчМэргэшсэн дэд гүйцэтгэгчӨртгийн зөвлөгөө / QS

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 5 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Measure off the drawings in metric

PDF хэмжилт

Set the scale from a known dimension on the sheet and measure lengths, areas and volumes in metric, taking each value from the drawing itself rather than from a figure somebody has already converted.

Яагаад: The drawings are metric, the model is metric and the specification is metric. Measuring in one system and converting at every step adds a rounding at every step, and roundings compound worst in the quantities that matter most, which are always the biggest ones.

ОролтDrawing set at a known scaleScope to be measuredҮр дүнMetric lengths, areas and volumesMeasurements tied to the sheet
2

Store the quantity metric and leave it that way

Тоо хэмжээ авах

Keep the measured quantity in its metric unit as the stored value, and treat an imperial reading of it as a view of that number rather than as a replacement for it.

Дэлгэцийн зураг, 2-р алхам: Store the quantity metric and leave it that way (Тоо хэмжээ авах, Метрээр хэмжиж, империалаар худалдаж авах)
Тоо хэмжээ авах: Store the quantity metric and leave it that way

Яагаад: There is only a right answer for one stored number. Storing a converted figure and converting it back is how a quantity acquires a rounding it never had, and nobody catches it, because both versions look entirely reasonable.

ОролтMeasurements from the drawingsҮр дүнMetric quantities stored onceA display that does not edit
3

Carry the product name the yard will sell you

Ажил материалын жагсаалт

Write the nominal product name on the item beside the metric quantity: a 2x4 with its dressed size of 38 by 89 mm stated from the standard, a 4x8 sheet with 1219.2 by 2438.4 mm stated and 1220 by 2440 as the conventional designation. Take each stated size from the standard or the arithmetic that produced it, never from the name.

Дэлгэцийн зураг, 3-р алхам: Carry the product name the yard will sell you (Ажил материалын жагсаалт, Метрээр хэмжиж, империалаар худалдаж авах)
Ажил материалын жагсаалт: Carry the product name the yard will sell you

Яагаад: The quantity is what you measured and the name is what you order, and they are two different facts about the same row. A bill carrying only the metric size has to be translated at the counter by whoever answers the phone, and a bill carrying only the name cannot be checked back against the drawings at all.

ОролтMetric quantitiesProduct names as they are boughtҮр дүнRows carrying both factsDressed sizes stated, not derived
4

Check that nothing was converted twice

Шалгалт

Validate the bill before it goes out, looking for the two failures this scope produces: a quantity whose unit no longer matches the way it was measured, and a stated size that has been recomputed from the nominal name instead of taken from the standard.

Дэлгэцийн зураг, 4-р алхам: Check that nothing was converted twice (Шалгалт, Метрээр хэмжиж, империалаар худалдаж авах)
Шалгалт: Check that nothing was converted twice

Яагаад: Both failures produce numbers that look right, which is exactly why a read-through does not catch them. A member sized at 50.8 mm where the standard says 38 mm passes every eye in the room and is wrong by a third, and it is wrong in the direction that costs money on site rather than in the estimate.

ОролтThe priced billNominal names and stated sizesҮр дүнUnit mismatches caughtSizes verified against the standard
5

Issue each reader the units they need

Тайлан

Export the bill with the metric quantities intact for the client and the consultant, and produce the material order carrying the nominal names for the supplier, both from the same rows.

Дэлгэцийн зураг, 5-р алхам: Issue each reader the units they need (Тайлан, Метрээр хэмжиж, империалаар худалдаж авах)
Тайлан: Issue each reader the units they need

Яагаад: Two readers need two different things from one set of rows, and neither should be handed a converted version of the other's. Exports staying metric is also what keeps the bill comparable against the drawings it was measured from, which is the only check anybody can run on it later.

ОролтBill rows carrying both factsҮр дүнMetric bill for the clientMaterial order in nominal sizes
Модулиуд

Энэ тоглолтын модулиуд

Платформын 190 модулиас 5

The market this case is written for

Канад

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Төсөв ба өртөг дахь бусад

Төсөв ба өртөг

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 алхам8 минНээх
Төсөв ба өртөг

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 алхам12 минНээх
Төсөв ба өртөг

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 алхам11 минНээх