केस / आकलन और लागत
आकलन और लागत

मेट्रिक में टेकऑफ करें और इंपीरियल में खरीदें

ड्राइंग को मेट्रिक में मापें, मात्रा को हर जगह जहां वह सहेजी और एक्सपोर्ट की जाती है मेट्रिक रखें, और वह इंपीरियल प्रोडक्ट नाम जो yard आपको वाकई बेचेगा उसी रो पर ढोएं, बिना किसी को दूसरे को दोबारा लिखने दिए।

5 चरण15 मिनटमुख्य ठेकेदारविशेषज्ञ उपठेकेदारलागत परामर्श / QS फर्म

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Measure off the drawings in metric

PDF माप

Set the scale from a known dimension on the sheet and measure lengths, areas and volumes in metric, taking each value from the drawing itself rather than from a figure somebody has already converted.

क्यों: The drawings are metric, the model is metric and the specification is metric. Measuring in one system and converting at every step adds a rounding at every step, and roundings compound worst in the quantities that matter most, which are always the biggest ones.

इनपुटDrawing set at a known scaleScope to be measuredपरिणामMetric lengths, areas and volumesMeasurements tied to the sheet
2

Store the quantity metric and leave it that way

मात्रा निकालना

Keep the measured quantity in its metric unit as the stored value, and treat an imperial reading of it as a view of that number rather than as a replacement for it.

स्क्रीनशॉट, चरण 2: Store the quantity metric and leave it that way (मात्रा निकालना, मेट्रिक में टेकऑफ करें और इंपीरियल में खरीदें)
मात्रा निकालना: Store the quantity metric and leave it that way

क्यों: There is only a right answer for one stored number. Storing a converted figure and converting it back is how a quantity acquires a rounding it never had, and nobody catches it, because both versions look entirely reasonable.

इनपुटMeasurements from the drawingsपरिणामMetric quantities stored onceA display that does not edit
3

Carry the product name the yard will sell you

मात्रा विवरण

Write the nominal product name on the item beside the metric quantity: a 2x4 with its dressed size of 38 by 89 mm stated from the standard, a 4x8 sheet with 1219.2 by 2438.4 mm stated and 1220 by 2440 as the conventional designation. Take each stated size from the standard or the arithmetic that produced it, never from the name.

स्क्रीनशॉट, चरण 3: Carry the product name the yard will sell you (मात्रा विवरण, मेट्रिक में टेकऑफ करें और इंपीरियल में खरीदें)
मात्रा विवरण: Carry the product name the yard will sell you

क्यों: The quantity is what you measured and the name is what you order, and they are two different facts about the same row. A bill carrying only the metric size has to be translated at the counter by whoever answers the phone, and a bill carrying only the name cannot be checked back against the drawings at all.

इनपुटMetric quantitiesProduct names as they are boughtपरिणामRows carrying both factsDressed sizes stated, not derived
4

Check that nothing was converted twice

सत्यापन

Validate the bill before it goes out, looking for the two failures this scope produces: a quantity whose unit no longer matches the way it was measured, and a stated size that has been recomputed from the nominal name instead of taken from the standard.

स्क्रीनशॉट, चरण 4: Check that nothing was converted twice (सत्यापन, मेट्रिक में टेकऑफ करें और इंपीरियल में खरीदें)
सत्यापन: Check that nothing was converted twice

क्यों: Both failures produce numbers that look right, which is exactly why a read-through does not catch them. A member sized at 50.8 mm where the standard says 38 mm passes every eye in the room and is wrong by a third, and it is wrong in the direction that costs money on site rather than in the estimate.

इनपुटThe priced billNominal names and stated sizesपरिणामUnit mismatches caughtSizes verified against the standard
5

Issue each reader the units they need

रिपोर्ट

Export the bill with the metric quantities intact for the client and the consultant, and produce the material order carrying the nominal names for the supplier, both from the same rows.

स्क्रीनशॉट, चरण 5: Issue each reader the units they need (रिपोर्ट, मेट्रिक में टेकऑफ करें और इंपीरियल में खरीदें)
रिपोर्ट: Issue each reader the units they need

क्यों: Two readers need two different things from one set of rows, and neither should be handed a converted version of the other's. Exports staying metric is also what keeps the bill comparable against the drawings it was measured from, which is the only check anybody can run on it later.

इनपुटBill rows carrying both factsपरिणामMetric bill for the clientMaterial order in nominal sizes
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 5 मॉड्यूल

The market this case is written for

कनाडा

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

आकलन और लागत में और देखें

आकलन और लागत

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 चरण8 मिनटखोलें
आकलन और लागत

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 चरण12 मिनटखोलें
आकलन और लागत

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 चरण11 मिनटखोलें