케이스 / 적산 및 원가
적산 및 원가

미터법으로 물량산출하고 야드파운드법으로 구매

도면을 미터법으로 산출하고, 저장되고 내보내지는 모든 곳에서 물량을 미터법으로 유지하며, 자재상이 실제로 판매하는 야드파운드법 제품명을 같은 행에 함께 기재하되, 어느 쪽도 다른 쪽을 덮어쓰지 않게 합니다.

5단계15 분종합건설사전문건설사원가 컨설팅 / 적산 업체

작동 방식, 단계별로

플랫폼 전반에 걸친 5단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Measure off the drawings in metric

PDF 측정

Set the scale from a known dimension on the sheet and measure lengths, areas and volumes in metric, taking each value from the drawing itself rather than from a figure somebody has already converted.

이유: The drawings are metric, the model is metric and the specification is metric. Measuring in one system and converting at every step adds a rounding at every step, and roundings compound worst in the quantities that matter most, which are always the biggest ones.

입력Drawing set at a known scaleScope to be measured결과Metric lengths, areas and volumesMeasurements tied to the sheet
2

Store the quantity metric and leave it that way

수량 산출

Keep the measured quantity in its metric unit as the stored value, and treat an imperial reading of it as a view of that number rather than as a replacement for it.

스크린샷, 2단계: Store the quantity metric and leave it that way (수량 산출, 미터법으로 물량산출하고 야드파운드법으로 구매)
수량 산출: Store the quantity metric and leave it that way

이유: There is only a right answer for one stored number. Storing a converted figure and converting it back is how a quantity acquires a rounding it never had, and nobody catches it, because both versions look entirely reasonable.

입력Measurements from the drawings결과Metric quantities stored onceA display that does not edit
3

Carry the product name the yard will sell you

내역서

Write the nominal product name on the item beside the metric quantity: a 2x4 with its dressed size of 38 by 89 mm stated from the standard, a 4x8 sheet with 1219.2 by 2438.4 mm stated and 1220 by 2440 as the conventional designation. Take each stated size from the standard or the arithmetic that produced it, never from the name.

스크린샷, 3단계: Carry the product name the yard will sell you (내역서, 미터법으로 물량산출하고 야드파운드법으로 구매)
내역서: Carry the product name the yard will sell you

이유: The quantity is what you measured and the name is what you order, and they are two different facts about the same row. A bill carrying only the metric size has to be translated at the counter by whoever answers the phone, and a bill carrying only the name cannot be checked back against the drawings at all.

입력Metric quantitiesProduct names as they are bought결과Rows carrying both factsDressed sizes stated, not derived
4

Check that nothing was converted twice

검증

Validate the bill before it goes out, looking for the two failures this scope produces: a quantity whose unit no longer matches the way it was measured, and a stated size that has been recomputed from the nominal name instead of taken from the standard.

스크린샷, 4단계: Check that nothing was converted twice (검증, 미터법으로 물량산출하고 야드파운드법으로 구매)
검증: Check that nothing was converted twice

이유: Both failures produce numbers that look right, which is exactly why a read-through does not catch them. A member sized at 50.8 mm where the standard says 38 mm passes every eye in the room and is wrong by a third, and it is wrong in the direction that costs money on site rather than in the estimate.

입력The priced billNominal names and stated sizes결과Unit mismatches caughtSizes verified against the standard
5

Issue each reader the units they need

보고서

Export the bill with the metric quantities intact for the client and the consultant, and produce the material order carrying the nominal names for the supplier, both from the same rows.

스크린샷, 5단계: Issue each reader the units they need (보고서, 미터법으로 물량산출하고 야드파운드법으로 구매)
보고서: Issue each reader the units they need

이유: Two readers need two different things from one set of rows, and neither should be handed a converted version of the other's. Exports staying metric is also what keeps the bill comparable against the drawings it was measured from, which is the only check anybody can run on it later.

입력Bill rows carrying both facts결과Metric bill for the clientMaterial order in nominal sizes
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 5개

The market this case is written for

캐나다

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

적산 및 원가 카테고리의 더 보기

적산 및 원가

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4단계12 분열기
적산 및 원가

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3단계11 분열기