Caser / Overlevering og livssyklus
Overlevering og livssyklus

Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu)

Før obshchiy zhurnal rabot fra første dag, arkiver aktene og materialdokumentene etter hvert som de signeres, sett sammen ispolnitelnaya dokumentatsiya i sammensetningen RD-11-02-2006 lister opp, la overtakelsen signeres, bestå sluttkontrollen fra state construction supervision, og søk om tillatelse til igangsetting under artikkel 55 i byplanloven.

7 trinn15 minHovedentreprenørUtbygger / byggherreProsjekt- / byggeledelsesfirmaKostnadsrådgivning / kalkulasjon

Slik fungerer det, steg for steg

7 trinn gjennom plattformen - hva du gjør i hvert og hvorfor det betyr noe.

1

Open the works journal on the day the permit is issued

Byggestyring

Start the obshchiy zhurnal rabot in the form the supervision rules prescribe, register it where the rules require, and record from the outset who may sign on behalf of the developer, the contractor, the designer's supervision and the construction control service, with the orders that appointed them. Keep the specialised journals for the works that need their own.

Skjermbilde, trinn 1: Open the works journal on the day the permit is issued (Byggestyring, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Byggestyring: Open the works journal on the day the permit is issued

Hvorfor: The journal is the primary record the supervision body reads at the final check, and it is read for continuity as much as for content, so a gap in it is a gap in the evidence that the work was controlled at all. An entry signed by a person whose appointment is not on file is worth no more than an unsigned one, and that is discovered at the end, when nobody can go back and be appointed retroactively.

InndataConstruction permitParties and their authoritiesResultatWorks journal openSignatories on record
2

File the acts and the material documents as they are signed

Dokumenter

As each piece of work closes, file its act of concealed works or of intermediate acceptance of a responsible structure together with what backs it: the passports and certificates for the materials built in, the laboratory protocols, the geodetic survey schemes and the drawings marked with what was actually built. Keep a running list of what is still missing, by structure rather than by supplier.

Skjermbilde, trinn 2: File the acts and the material documents as they are signed (Dokumenter, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Dokumenter: File the acts and the material documents as they are signed

Hvorfor: These documents are cheap to obtain in the week the work happens and close to impossible a year later, when the concrete supplier has changed its testing laboratory and the subcontractor has been paid in full. A list kept by structure also tells you which act is blocking the set, which a list kept by supplier never does.

InndataConcealed work actsMaterial passports and protocolsResultatActs filed by structureMissing documents named
3

Assemble the as-built set and check it against the list

Validering

Assemble the ispolnitelnaya dokumentatsiya in the composition RD-11-02-2006 sets out, in the order the register lists it, and run the completeness check yourself before handing it to anybody: every act present, every act referencing documents that exist, every sheet signed by a person entitled to sign it, and the volumes numbered so a reader can find a structure without asking you.

Skjermbilde, trinn 3: Assemble the as-built set and check it against the list (Validering, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Validering: Assemble the as-built set and check it against the list

Hvorfor: The supervision body checks the set against the same published list, so running that check first costs a day and moves every finding from their report into your worklist. A set handed over incomplete does not simply come back, it starts a round of correspondence that puts weeks between the last brick and the permit, and those weeks are usually financed.

InndataActs filed by structureRequired composition listResultatAs-built set assembledCompleteness report
4

Sign the acceptance of the finished object

Overlevering og avslutning

Hand the object over to the customer on the acceptance act the contract names, with the outstanding items listed as remarks, each with an owner and a date, rather than as a sentence saying the works are complete. Reconcile the accepted scope against everything already accepted month by month so the total agrees with the sum of the acts.

Skjermbilde, trinn 4: Sign the acceptance of the finished object (Overlevering og avslutning, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Overlevering og avslutning: Sign the acceptance of the finished object

Hvorfor: The acceptance date starts the guarantee period and usually the release of the retained amounts, so it is a commercial event and not a ceremony. Remarks recorded without an owner and a date are the ones that reappear at the end of the guarantee period as defects, by which time the argument is about who caused them rather than about who agreed to fix them.

InndataAs-built set assembledContract scopeResultatAcceptance act signedRemarks list with dates
5

Pass the final check of the state construction supervision

Inspeksjoner

Close out every finding from the checks carried out during construction first, then call the final check, present the journal and the as-built set against the design documentation, and take the conclusion of conformity. Where the object is subject to environmental supervision, treat that conclusion as its own thread with its own dates.

Skjermbilde, trinn 5: Pass the final check of the state construction supervision (Inspeksjoner, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Inspeksjoner: Pass the final check of the state construction supervision

Hvorfor: The conclusion of conformity is the document without which the permit to commission cannot be applied for at all, and it is refused on unclosed findings from checks that happened a year earlier. Treating each interim finding as closed only when the supervision body says it is closed, rather than when the work was redone, is what keeps that list empty at the end.

InndataAs-built set assembledPrior inspection findingsResultatConclusion of conformityFindings cleared
6

Apply for the permit to commission

Myndighetsinnleveringer

Lodge the application with the body that issued the construction permit, attaching the documents article 55 of the Town Planning Code lists: the title and planning documents, the acceptance act, the conclusion of conformity, the documents on the utility connections, and the technical plan prepared by a cadastral engineer. Check the address and the technical parameters against the design before you send it.

Hvorfor: The grounds for refusing this permit are listed in the code and are almost all documentary, which means almost all of them are avoidable by reading the same list first. A parameter that disagrees with the design, an area that disagrees with the technical plan, is a refusal, and the object cannot be used or registered until it is resolved.

InndataConclusion of conformityTechnical planResultatPermit to commissionObject on the cadastre
7

Start the guarantee period from the right date

Garantier & mangelansvar

Register the guarantee period from the acceptance date, with the equipment warranties that run on their own shorter clocks recorded separately, and put the end date in front of the person who will still be responsible for the building when it arrives. Keep the as-built set where that person can reach it rather than in the contractor's archive.

Skjermbilde, trinn 7: Start the guarantee period from the right date (Garantier & mangelansvar, Lukk objektet og få brukstillatelsen (vvod v ekspluatatsiyu))
Garantier & mangelansvar: Start the guarantee period from the right date

Hvorfor: The contract guarantee and the longer statutory period for claims about the quality of a building are two different clocks, and the shorter one is the one everybody remembers. Registering both from the acceptance date is what makes a defect found in year four a question about the guarantee rather than a question about whether anybody kept the paperwork.

InndataAcceptance act signedGuarantee termsResultatGuarantee registerEnd date under watch
Moduler

Moduler i denne playbooken

7 / 190 plattformmoduler

The market this case is written for

Russland

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mer innen Overlevering og livssyklus

Overlevering og livssyklus

Overtakelse og avslutning

Avslutt jobben rent: arbeid punchlisten ned til null, bekreft at hver inspeksjon er godkjent…

5 trinn14 minÅpne