Partner Program

Open core. Real margins.
Construction ERP partner program, built for SMB.

OpenConstructionERP is AGPL-3.0 and free forever. Implementation, localisation, training and converters are commercial - and partners keep up to 100% of services revenue. Built for partners working with small and mid-sized construction firms. No annual fees. No quotas.

AGPL-3.0 on GitHub · Dual-licence (AGPL + commercial) · CWICR cost database, 11 countries

80% of the building is the foundation.
20% is what makes it habitable.

€0fee
Annual partnership fee
Forever, written into the agreement
100%
Implementation revenue
DDC never quotes services
55%
Localisation margin
Regional packs and cad2data converters
30%
Recurring on renewals
Passive Year-2+ revenue stream

This is how the value is built.

Grey is open source - free forever. Coloured floors are commercial. Partners keep 80%-100% of revenue on every floor above the foundation.

Foundation = open source. Floors above = commercial. Roof = recurring success.

every module, one platform

190+ modules. Whatever your process is, it is in here.

Estimating, tendering, BIM, quantities, programme, quality, safety, cash flow, site. Switch on the ones your job needs, leave the rest off, write your own.

Where the margin comes from.

One typical small/mid deal, broken down line by line. The open core stays free. Partners earn on the commercial layers and on services.

Year-1 deal - small/mid construction firm, ~15 seats
Small GC, specialist sub or QS studio · 3-5 estimators · 2-3 PMs · owner read-only
€20,000total deal value
Open Core (AGPL)BOQ · BIM · 4D · AI takeoff
€0 × free
€0
Localisation packTax · cost classes · regulator output
€3.5k × 80%
€2,800
Commercial SKUsCommercial licence · CWICR DB · connectors
€3.5k × 80%
€2,800
ImplementationTemplate onboarding · data migration · training
€10k × 100%
€10,000
Year-2 SLA + optimisationRecurring, starts month 13
€3k × 80%
€2,400
Partner take · Year-1 + first recurring slice €18,000

Two simple rules. Nothing hidden.

Your services
100% yours
Our products
80% partner
20%
100%
Your own work

Implementation, training, support, custom modules, consulting. You do it, you keep every euro. We never compete on services - written commitment in every partnership agreement.

80%
Our products you resell

Commercial licences, CWICR cost database, localisation packs, connectors, renewals. One flat rate, no tiers, no volume thresholds. You keep 80%, we keep 20%.

In short: the partner can do everything independently and keep 100% of services revenue. When a deal involves our commercial products (licences, cost databases, connectors), the split is 80/20 in your favour. No annual fees, no quotas, no clawback.

100% implementation 100% training 100% support 100% custom modules 80% localisation 80% commercial 80% recurring
Year-2 onwards: the same client pays an SLA / optimisation retainer. You keep 80% of that for as long as the client stays live. SMB volume compounds, ten live clients ≈ €24k/year before any new work.

Which one are you?

Three reader profiles. Pick the one that matches.

You're a partner
BIM consultancy · ERP integrator · freelance dev · local SI

You sell implementation, training, custom modules. You keep 80% on everything commercial and we never compete on services. €0 partnership fee.

Apply as a partner →
You're a client
GC · subcontractor · developer · owner

You can run OpenConstructionERP for free - or hire a vetted partner for production go-live, localisation and SLA. Three legitimate paths, your choice depends on team capacity and risk appetite.

See the partner deal →
You're a specialist
Plugin author · BIM dev · IFC expert · trainer

You build a connector, training pack or custom module and earn 80% on every commercial deal it touches. Listed in the marketplace once your first artefact ships.

Apply as a specialist →

Our partner program at a glance.

Standalone summary of what OpenConstructionERP's program offers. We deliberately do not publish side-by-side numeric comparisons with named vendor programs - their terms change, vary by region, and are best confirmed against each vendor's own public materials. Below is what we commit to in writing.

On everything you resell from us
80%Licences, CWICR, localisation packs, connectors and renewals - one rate, no tiers.
Implementation revenuepartner-kept
100%we don't bill end customers for services partners deliver
Annual partnership feesame for everyone
€0no certification fee, no annual minimum, no upcharge
Vendor competes on services?directly with you
Nowritten non-compete in the partner agreement
Headcount minimumcertified engineers required
0solo consultants and small studios welcome
Open-source productpartner can fork & extend
Full AGPL-3.0source available, no closed-source lock-in
Construction-native productBOQ · BIM · 4D · AI takeoff
Yesbuilt bottom-up for construction estimation - not a generic ERP module

Figures reflect OpenConstructionERP's own partner agreement as published 2026-05-20. We deliberately avoid publishing side-by-side numeric comparisons with named vendor programs - their terms, regional minima and qualifying criteria change often and are best confirmed against each vendor's own public materials.

One partner deal. Same for everyone.

No tiers, no ladder, no certification gates. The same rate card from day one, whoever you are.

On everything you resell from us
80%
Implementation services
100%
Annual fee
€0
How you qualify
Apply
€0 annual fee. No headcount minimums, no certification gates, no quotas. Just close deals when you have them, keep the margin when you do.

What the client is invoiced.

Your own work is one line and it is entirely yours. Everything you resell from us is its own line at the published price, and you keep 80% of it. Nothing is bundled, so the client can see what each thing costs. Below are the lines a partner invoice usually carries; anything else on the rate card works the same way.

Invoice line Client pays You keep
Implementation services Diagnosis, configuration, data migration, integrations, training and the first year of support.
You quote it
100% to you
Commercial licence Per company, unlimited users. Lifts the AGPL source-disclosure obligation and lets you deliver under your own brand.
€2,500 one-time
80% to you
CAD and BIM reading Only when the client needs RVT, DWG or DGN. The engine is licensed from its rights holder, so this is always its own line.
€1,800 a year on their server
€75 a month hosted by us
80% to you
CWICR cost database One region, 55,000+ priced items, in nine languages. The client keeps it.
€750 one-time / region
80% to you
Support from year two Third line, releases and update compatibility. Starts once the first year included in your implementation runs out.
€1,200 a year
80% to you

Two ways to price the licence line

Your agreement fixes one of them and it then applies to every client you bring. Either way you keep 80% of the line.

A
A royalty on your own fee The licence line is 15% of the implementation services on the same invoice. The CAD line and the licence line itself are outside that base.
B
A flat fee per deployment €1,250 to €3,000 to stand the system up, then €600 to €1,250 a year for support. Where you sit in the band follows the number of users.

The licence is charged on commercial deployments, meaning under your brand or with manufacturer support behind it. Delivering the plain open core with OpenConstructionERP attribution carries no licence.

What the 20% buys the client

The licence is not a fee for software the client could have taken for free. It is the manufacturer standing behind the core they are running.

  • Third line. Anything you and the client cannot resolve comes to the people who wrote it.
  • Releases, and compatibility of their configuration across them.
  • A clean legal footing for delivering the product under your brand.
  • For the CAD line, the engine's own yearly licence and support for new versions of each format.

Direct enquiries from your region come to you. We do not quote implementation work behind a partner.

How a deal runs, and what you own.

Every stage is paid, including the first. Nobody works for free to earn the right to quote.

01 2-3 weeks · paid
Diagnosis

Interviews, the client's actual processes, access to their data. It ends in a map of the problems, a specification and a price for the rollout, and the client pays for it separately.

YouInterviews, process mapping, the client relationship
UsAn expert on the call, and in the pitch to the client
02 6-10 weeks · paid
Pilot

One site or one project, live, with real data. Small enough to finish and big enough to prove.

YouThe rollout itself, localisation, first and second line
UsArchitecture review and third line
03 from there on
Rollout

The rest of the sites, the rest of the projects, the next client. By this point you are doing it without us.

YouOn your own
UsEscalations under the SLA

Modules you build are yours

A module written for your market belongs to you. There are two things you can do with it, and both are fine by us.

Open
Give it to the open core Your licence royalty falls by 3 points for every module accepted, permanently, down to a floor of 5%. We take on keeping it working across releases. Your name stays on it.
Closed
Keep it to yourself The code stays with you. Each client running it buys a licence for that module, around €750 a year for a small firm and up by seat count. You sell it and keep 80%, and that licence also lifts attribution for that client. Keeping it working across releases is yours.

Three things the agreement asks

Short list, and none of it is a surprise later.

  1. Attribution until the licence is in force. Before that, the interface names OpenConstructionERP and keeps the copyright notices, on your public demo as well.
  2. A contribution agreement before your first commit. Code that depends on the licensed CAD engine does not go into the open core.
  3. Export control on the CAD engine. It falls under US export control, so before delivery into a given country, hosted or installed, we check and confirm which jurisdictions are open.

Reselling the CAD converters is its own short written agreement. It covers distributing them, not building on the engine.

What you actually get on day one.

Three concrete things: a 30-day timeline, a ready-made toolkit, and an honest map of where leads come from. No big promises, just the kit and the wiring.

First 30 days

Mostly async, light on calls.

  • Day 1-3 · Sign agreement (PDF, ~6 pages), Telegram invite, demo tenant credentials
  • Day 4-7 · Marketing kit handover (Loom walk-through, ~20 min, watch when it suits you)
  • Day 8-14 · Pick your first SMB target, async Q&A in Telegram, pricing review
  • Day 15-30 · Pilot proposal sent, listed in partner directory, eligible for inbound lead share

One 30-min call max in the first month - everything else is Loom, shared docs and Telegram. Built so a busy SMB consultant can onboard in evenings.

Marketing kit

Concrete assets, not vague support.

  • Branded demo tenant on demo.openconstructionerp.com/{your-name}
  • White-label sales deck (PDF + Keynote source) - your logo, your colours
  • Pricing one-pager per region (DACH, UK, US, FR, ES, IT, NL, RO, PL)
  • 3 ready-made BOQ templates per region (residential, small commercial, fit-out)
  • Email sequences for cold + warm outreach (3 variants, plain text)
  • LinkedIn & X co-marketing post templates with our hashtag set

Updated quarterly. Partners get a private GitHub release feed - new templates, decks and pricing land there as soon as they ship.

Where leads come from

Honest map of the funnel.

  • ~60-70% · Your existing client base - partners who already serve SMB GCs / subs / QS practices have the warmest path
  • ~15-25% · DDC inbound - directory listing routes enquiries to the closest partner
  • ~10-15% · Social co-promotion - DDC amplifies your case studies, posts and webinars across LinkedIn, X and YouTube (tens of thousands of AEC followers)
  • Bonus · Joint webinars and conference co-hosting once you have one live client

We can't replace your sales motion in Year 1 - but we can amplify it. Most first deals come from the partner's own network; DDC compounds from there.

What we won't do.

Anti-promises are honest promises. Here's what stays off the table:

×
We won't run your sales for you. Year-1 leads come mostly from your own network. We help, but we don't replace.
×
We won't gate the marketplace. No certification fees, no listing fees, no pay-to-play tiers. List as soon as you sign.
×
We won't invoice your clients without your sign-off. Resold or referred - you decide per deal, not us.
×
We won't change rate cards mid-deal. New rates only apply 90 days after notice, and never to deals already in flight.
×
We won't quote services against you. DDC has a written commitment to never compete on implementation, training or custom modules.
×
We won't hide the pipeline. If we route an inbound lead to another partner in your region, you'll see it in the partner Telegram - no surprises.

Partner profiles.

Three shapes of partner, with rough Year-1 numbers. Pick the one closest to your team.

Solo specialist

Independent expert.

Senior BIM consultant or QS · 1 person · works with small GCs and subs
3-5
deals / year
€35-60k
Year-1 take
+80%
recurring Year-2
€0
fees, ever
Implementation services (100%)€40k
Localisation packs (80%)€5k
Commercial / CWICR (80%)€3k

You sell your own time. Implementation pays the bills, licence margin is upside. No hires, no fixed costs, no quotas.

ERP integrator

Multi-product SI.

15-30 staff · serves SMB at volume · adds OCERP to existing portfolio
18-28
deals / year
€320-520k
Year-1 take
€0
fees, ever
2-4
countries served
Implementation services (100%)€260k
Multi-country localisation (80%)€60k
Commercial + cad2data resale (80%)€40k

You already sell a mature cloud ERP. OCERP slots in as the construction-specific layer - same sales motion, same delivery team. One agreement covers multiple countries.

How to apply.

Four async steps, about two weeks end-to-end. Mostly your pace.

Apply

5-field form: name, company, country, website, current AEC clients.

Intro call

30 minutes, async-friendly (we'll do video or just trade Looms). We walk through your portfolio and target deals.

Sign & onboard

Partnership agreement (PDF, ~6 pages), Telegram invite, sales deck, demo environment, marketing kit handed over.

First deal

Listed on partner directory, co-promoted on our social channels, eligible for lead share from inbound enquiries.

Roughly 1-2 weeks end-to-end. Most steps are async - minimal calendar blocking on either side.

Common worries.

Plain answers to the questions worth asking before signing anything - ours, theirs, anyone's.

"What if you go out of business?"

The product is AGPL-3.0 open source. BOQ, BIM viewer, schedule, AI takeoff - everything sits on GitHub under a licence we can't revoke. If DDC disappears, your clients keep running, your contracts stay in force, and you can fork and maintain it yourself.

"What if I don't close any deals in Year 1?"

You owe nothing. €0 annual fee, no quotas, no minimums. You stay on the rate card indefinitely. There is no deal target.

"Can I exit and take my clients with me?"

Yes. Client contracts are between you and the client - DDC has no claim on them. Clients can keep running the AGPL build with nothing to renew. You'd just stop selling the commercial dual-licence and regional packs.

"What if you change the terms later?"

All partners get a rate guarantee on deals already in flight. New rates only apply to deals booked after 90 days' notice.

"Show me the contract before I commit."

The agreement is a 6-page PDF in plain English. We send it after the discovery call. No NDA required to read it. If anything looks off, you walk away - half an hour spent, no obligation.

"What if my first client hates the product?"

They run the AGPL build for free, so the downside is your hours and their time, not a five-figure licence locked in upfront. If a pilot fails inside 90 days, we run a joint retrospective and help you unwind it.

Common questions.

Straight answers for partners evaluating the program.

How much do I keep?
100% of everything you do yourself: implementation, training, support, custom modules, consulting. When a deal includes our commercial products (licences, cost database, localisation packs, connectors), the split is 80% to you, 20% to us. One flat rate, no tiers, no volume conditions.
Will you compete with me on services?
No. This is a written commitment in every partnership agreement. We build the platform and the commercial products. Implementation, training, support and custom development are entirely yours. We do not quote on services work.
The software is free and open source. Why would a client pay?
The open core is free forever. Clients pay for the things free AGPL does not deliver: production go-live, localisation for their country, SLA support, commercial licensing (removes the AGPL obligation for clients who need it), and the full cost database. Most firms need at least two of these. That is where partner revenue comes from.
Do I need to be a developer to become a partner?
No. BIM consultancies, QS firms, construction IT advisors, freelance estimators and training companies are all welcome. If you understand construction workflows and can guide a client through setup and go-live, that is enough. We provide free technical training for your first two engineers if you want to go deeper.
Are there annual fees, quotas or minimum commitments?
None. Zero annual fee, zero minimum deal count. If you never close a deal, nothing happens and your partnership stays active. We would rather have a partner who takes six months to land the right client than one who rushes a bad fit.
How is this different from being a partner of a large cloud ERP?
Higher margins (80% vs the typical 15-30% on cloud subscriptions), no annual partnership fee, no certification gate, and the vendor does not compete on implementation. The product is construction-native from the start, not a generic ERP with an industry template bolted on. And because the core is open source, your client is never locked in.
Partner program · open to apply

Apply in six fields.

We read every application personally.

1
You send the form Six fields. Two minutes. No file uploads required.
2
We reply with next steps A short note with a link to a 30-min intro call. Async by default - no calendar Tetris.
3
Onboarding in 1-2 weeks Partnership agreement, Telegram invite, demo environment, marketing kit handover.
Stored on EU servers · never sold or shared
€0 partnership fees · forever, written into the agreement
No headcount minimums · build the team when you need it
Used only to evaluate your application. Stored in EU. Never sold.