Check a model against the EIR and raise issues

Open the information requirements, check a delivered model against them for naming, classification, level of detail and required properties, raise a BCF issue on every gap and sign off only what passes.

4 steps11 minBIM / digital consultancyDeveloper / clientProject / construction management firm

How it works, step by step

4 steps across the platform - what you do at each one, and why it matters.

1

Open the requirements

EIR Matrix

Open the information requirements the model is meant to satisfy - the naming convention, classification, level of information need and the properties each element must carry.

Why: You cannot check a model against a standard you have not opened. Starting from the actual requirements turns a vague review into a definite pass or fail on each point.

InInformation requirementsDelivered modelOutRequirement checklist
2

Check the model against them

Model Review

Work through the model checking naming, classification codes, level of detail and the required properties on each element type against the requirement.

Why: A missing classification or an empty property field breaks the takeoff and the asset handover downstream. Catching it at delivery is far cheaper than finding it when it is needed.

InRequirement checklistOutFindings against each
3

Raise an issue per gap

Model Issues

Raise a BCF issue for every gap against a requirement, pointing at the element and naming what is missing, so the author has a precise list to fix.

Why: A precise issue gets fixed; a vague complaint that the model is not compliant gets argued. Tying each issue to a requirement and an element removes the room for debate.

InFindingsOutBCF issues raised
4

Sign off what passes

EIR Matrix

Sign off a requirement only once the model actually meets it, so the matrix records true acceptance rather than a hopeful tick.

Why: Sign-off is the gate that protects everyone downstream. Holding it until the model really complies is what stops a data gap being inherited by the estimator and the operator.

InResolved issuesOutRequirement signed off
Modules

Modules in this playbook

3 / 190 platform modules

More in BIM & takeoff

BIM & takeoff

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 steps12 minOpen
BIM & takeoff

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 steps12 minOpen
BIM & takeoff

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 steps10 minOpen