Manage temporary works and inspections

Register every temporary works item, record the design check and coordinator sign-off, inspect before it is loaded and keep the periodic inspection record right up until it is struck.

4 bước11 phútNhà thầu chínhNhà thầu phụ chuyên ngànhQuản lý dự án / thi công

Cách hoạt động, từng bước một

4 bước xuyên suốt nền tảng - bạn làm gì ở mỗi bước và vì sao điều đó quan trọng.

1

Register every item

Temporary Works

List every temporary works item on the job - scaffold, props, formwork, falsework, excavation support - with its location, design status and who is responsible for it.

Tại sao: The item nobody registered is the one that gets loaded without a check. A complete register is what makes sure every load-bearing temporary structure has an owner and a design behind it.

Đầu vàoTemporary worksMethod statementsĐầu raTemporary works register
2

Record the design check

Temporary Works

Record the independent design check and the temporary works coordinator sign-off against each item, so the design is verified before anything is built to it.

Tại sao: A design check is only worth something if it is recorded and holds the work back until it is done. Tying the sign-off to the item is what makes the check a real gate, not a formality.

Đầu vàoRegistered itemDesign and calculationsĐầu raDesign check signed
3

Inspect and permit to load

Kiểm tra

Inspect the erected item against its design, confirm it was built as drawn, and issue the permit to load only once it passes.

Tại sao: The gap between design and what got built is where temporary works fail. A pre-load inspection and permit is the last check before people and loads depend on it.

Đầu vàoApproved itemĐầu raPermit to load
4

Keep the inspection record

Kiểm tra

Keep the periodic inspections going - after high winds, adaptations or a set period - and record each one until the item is safely struck and signed off.

Tại sao: A scaffold safe on the day it was signed can be altered or damaged by the next week. The running inspection record is what keeps it safe for its whole life on the job.

Đầu vàoLoaded itemĐầu raInspection record