Juhtumid / BIM ja mõõdistus
BIM ja mõõdistus

Kontrolli joonisteväljastust registri vastu

Võrdle väljastatud lehekomplekti joonisteregistri vastu ja näe, mis on puudu, mis ilmus teatamata ja mis on redaktsioonil, mida register ei oota, ning jälgi seejärel lünki, arvud käes.

4 sammu8 minPeatöövõtjaBIM / diginõustamineProjekti- / ehitusjuhtimisbüroo

Kuidas see töötab, samm-sammult

4 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Take in the issued sheet set

Dokumendid

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

Miks: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

SisendIssued PDF setCovering transmittalVäljundIndividual numbered sheetsRevision read off each one
2

Reconcile it against the index

Jooniseruum

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

Miks: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

SisendSheets you actually holdDrawing index or issue registerVäljundMissing and extra listsRevision mismatches
3

Chase what never arrived

Saatelehed

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

Miks: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

SisendMissing sheet numbersTransmittal logVäljundRequest naming each sheetDated chase trail
4

Account for what arrived unannounced

Dokumendid

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

Miks: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

SisendExtra sheets and mismatchesDrawing registerVäljundEverything registeredAgreed current revision
Moodulid

Selle tegevusjuhendi moodulid

3 / 190 platvormi moodulit

Rohkem valdkonnas BIM ja mõõdistus

BIM ja mõõdistus

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 sammu12 minAva
BIM ja mõõdistus

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 sammu12 minAva
BIM ja mõõdistus

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 sammu10 minAva