حالات عملية / BIM وحصر الكميات
BIM وحصر الكميات

مطابقة إصدار رسومات مقابل فهرس الرسومات

قارن مجموعة لوحات صادرة مع فهرس الرسومات وحدّد ما هو ناقص، وما ورد دون إعلان، وما هو موجود بمراجعة لا يتوقعها الفهرس، ثم تابع الثغرات بالأرقام في متناول يدك.

4 خطوة8 دقيقةمقاول عاماستشارات BIM / رقميةمكتب إدارة المشاريع / الإنشاء

كيف يعمل، خطوة بخطوة

4 خطوات عبر المنصة - ما تفعله في كل منها ولماذا يهم.

1

Take in the issued sheet set

المستندات

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

لقطة شاشة، الخطوة 1: Take in the issued sheet set (المستندات, مطابقة إصدار رسومات مقابل فهرس الرسومات)
المستندات: Take in the issued sheet set

لماذا: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

المدخلاتIssued PDF setCovering transmittalالمخرجاتIndividual numbered sheetsRevision read off each one
2

Reconcile it against the index

غرفة المخططات

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

لقطة شاشة، الخطوة 2: Reconcile it against the index (غرفة المخططات, مطابقة إصدار رسومات مقابل فهرس الرسومات)
غرفة المخططات: Reconcile it against the index

لماذا: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

المدخلاتSheets you actually holdDrawing index or issue registerالمخرجاتMissing and extra listsRevision mismatches
3

Chase what never arrived

إرساليات

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

لقطة شاشة، الخطوة 3: Chase what never arrived (إرساليات, مطابقة إصدار رسومات مقابل فهرس الرسومات)
إرساليات: Chase what never arrived

لماذا: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

المدخلاتMissing sheet numbersTransmittal logالمخرجاتRequest naming each sheetDated chase trail
4

Account for what arrived unannounced

المستندات

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

لقطة شاشة، الخطوة 4: Account for what arrived unannounced (المستندات, مطابقة إصدار رسومات مقابل فهرس الرسومات)
المستندات: Account for what arrived unannounced

لماذا: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

المدخلاتExtra sheets and mismatchesDrawing registerالمخرجاتEverything registeredAgreed current revision
الوحدات

وحدات هذا الدليل

3 / 190 من وحدات المنصة

المزيد في BIM وحصر الكميات

BIM وحصر الكميات

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 خطوة12 دقيقةفتح
BIM وحصر الكميات

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 خطوة12 دقيقةفتح
BIM وحصر الكميات

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 خطوة10 دقيقةفتح