ケース / BIMと数量拾い
BIMと数量拾い

図面発行を図面リストと突き合わせる

発行された図面一式を図面リストと突き合わせ、欠落しているもの、予告なく届いたもの、リストが想定しない改訂版のまま止まっているものを洗い出し、具体的な数字を手に不足分を督促する。

4ステップ8 分総合建設会社BIM / デジタルコンサルティング会社プロジェクト / 施工管理会社

仕組みをステップごとに

プラットフォーム全体で4ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Take in the issued sheet set

文書

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

スクリーンショット、ステップ 1: Take in the issued sheet set (文書, 図面発行を図面リストと突き合わせる)
文書: Take in the issued sheet set

理由: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

入力Issued PDF setCovering transmittal出力Individual numbered sheetsRevision read off each one
2

Reconcile it against the index

図面室

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

スクリーンショット、ステップ 2: Reconcile it against the index (図面室, 図面発行を図面リストと突き合わせる)
図面室: Reconcile it against the index

理由: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

入力Sheets you actually holdDrawing index or issue register出力Missing and extra listsRevision mismatches
3

Chase what never arrived

送付

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

スクリーンショット、ステップ 3: Chase what never arrived (送付, 図面発行を図面リストと突き合わせる)
送付: Chase what never arrived

理由: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

入力Missing sheet numbersTransmittal log出力Request naming each sheetDated chase trail
4

Account for what arrived unannounced

文書

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

スクリーンショット、ステップ 4: Account for what arrived unannounced (文書, 図面発行を図面リストと突き合わせる)
文書: Account for what arrived unannounced

理由: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

入力Extra sheets and mismatchesDrawing register出力Everything registeredAgreed current revision
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 3 個

BIMと数量拾いの他のケース

BIMと数量拾い

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5ステップ12 分開く
BIMと数量拾い

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3ステップ12 分開く
BIMと数量拾い

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3ステップ10 分開く